§63.366. Reporting requirements. — Inbound Citations
40 C.F.R. § 63.366
Statutory Authority
Cited by 50 regulations in release Current.
Citations to §63.366(b)
Citations to §63.366(b)(1)(i)
-
(1) The information listed in paragraphs (b)(1)(i) through (vi) of this section, with the exception that monthly EtO use, in tons, only needs reported for the previous 12 months;
Citations to §63.366(b)(1)(ii)
-
(1) The information listed in paragraphs (b)(1)(i) through (vi) of this section, with the exception that monthly EtO use, in tons, only needs reported for the previous 12 months;
Citations to §63.366(b)(1)(iii)
-
(1) The information listed in paragraphs (b)(1)(i) through (vi) of this section, with the exception that monthly EtO use, in tons, only needs reported for the previous 12 months;
Citations to §63.366(b)(1)(iv)
-
(1) The information listed in paragraphs (b)(1)(i) through (vi) of this section, with the exception that monthly EtO use, in tons, only needs reported for the previous 12 months;
Citations to §63.366(b)(1)(v)
-
(1) The information listed in paragraphs (b)(1)(i) through (vi) of this section, with the exception that monthly EtO use, in tons, only needs reported for the previous 12 months;
Citations to §63.366(b)(1)(vi)
-
(1) The information listed in paragraphs (b)(1)(i) through (vi) of this section, with the exception that monthly EtO use, in tons, only needs reported for the previous 12 months;
Citations to §63.366(b)(2)(i)
-
(2) If your sterilization facility is demonstrating continuous compliance through periodic performance testing, you must report the ID for any control system that has not operated since the end of the period covered by the previous compliance report. If a control system has commenced operation since end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(2)(i) through (iv) of this section has changed for a control system that was included in the previous compliance report, you must report the information in paragraphs (b)(2)(i) through (iv) of this section for those control systems;
Citations to §63.366(b)(2)(ii)
-
(2) If your sterilization facility is demonstrating continuous compliance through periodic performance testing, you must report the ID for any control system that has not operated since the end of the period covered by the previous compliance report. If a control system has commenced operation since end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(2)(i) through (iv) of this section has changed for a control system that was included in the previous compliance report, you must report the information in paragraphs (b)(2)(i) through (iv) of this section for those control systems;
Citations to §63.366(b)(2)(iii)
-
(2) If your sterilization facility is demonstrating continuous compliance through periodic performance testing, you must report the ID for any control system that has not operated since the end of the period covered by the previous compliance report. If a control system has commenced operation since end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(2)(i) through (iv) of this section has changed for a control system that was included in the previous compliance report, you must report the information in paragraphs (b)(2)(i) through (iv) of this section for those control systems;
Citations to §63.366(b)(2)(iv)
-
(2) If your sterilization facility is demonstrating continuous compliance through periodic performance testing, you must report the ID for any control system that has not operated since the end of the period covered by the previous compliance report. If a control system has commenced operation since end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(2)(i) through (iv) of this section has changed for a control system that was included in the previous compliance report, you must report the information in paragraphs (b)(2)(i) through (iv) of this section for those control systems;
Citations to §63.366(b)(3)(i)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(ii)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(iii)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(iv)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(ix)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(v)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(vi)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(vii)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(3)(viii)
-
(3) You must report the ID for any sterilization chamber that has not operated since then end of the period covered by the previous compliance report. If a sterilization chamber has commenced operation since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(3)(i) through (ix) of this section has changed for a sterilization chamber that was included in the previous compliance report, you must report the information in paragraphs (b)(3)(i) through (ix) of this section for those sterilization chambers;
Citations to §63.366(b)(4)(i)
-
(4) If emissions from any room in your facility are subject to an emission standard, you must report the ID for any room where there has not been the potential for EtO emissions since the end of the period covered by the previous compliance report. If a room has had the potential for EtO emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(4)(i) through (vi) of this section has changed for a room where there is the potential for EtO emissions that was included in the previous compliance report, you must report the information in paragraphs (b)(4)(i) through (vi) of this section for those rooms;
Citations to §63.366(b)(4)(ii)
-
(4) If emissions from any room in your facility are subject to an emission standard, you must report the ID for any room where there has not been the potential for EtO emissions since the end of the period covered by the previous compliance report. If a room has had the potential for EtO emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(4)(i) through (vi) of this section has changed for a room where there is the potential for EtO emissions that was included in the previous compliance report, you must report the information in paragraphs (b)(4)(i) through (vi) of this section for those rooms;
Citations to §63.366(b)(4)(iii)
-
(4) If emissions from any room in your facility are subject to an emission standard, you must report the ID for any room where there has not been the potential for EtO emissions since the end of the period covered by the previous compliance report. If a room has had the potential for EtO emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(4)(i) through (vi) of this section has changed for a room where there is the potential for EtO emissions that was included in the previous compliance report, you must report the information in paragraphs (b)(4)(i) through (vi) of this section for those rooms;
Citations to §63.366(b)(4)(iv)
-
(4) If emissions from any room in your facility are subject to an emission standard, you must report the ID for any room where there has not been the potential for EtO emissions since the end of the period covered by the previous compliance report. If a room has had the potential for EtO emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(4)(i) through (vi) of this section has changed for a room where there is the potential for EtO emissions that was included in the previous compliance report, you must report the information in paragraphs (b)(4)(i) through (vi) of this section for those rooms;
Citations to §63.366(b)(4)(v)
-
(4) If emissions from any room in your facility are subject to an emission standard, you must report the ID for any room where there has not been the potential for EtO emissions since the end of the period covered by the previous compliance report. If a room has had the potential for EtO emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(4)(i) through (vi) of this section has changed for a room where there is the potential for EtO emissions that was included in the previous compliance report, you must report the information in paragraphs (b)(4)(i) through (vi) of this section for those rooms;
Citations to §63.366(b)(4)(vi)
-
(4) If emissions from any room in your facility are subject to an emission standard, you must report the ID for any room where there has not been the potential for EtO emissions since the end of the period covered by the previous compliance report. If a room has had the potential for EtO emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(4)(i) through (vi) of this section has changed for a room where there is the potential for EtO emissions that was included in the previous compliance report, you must report the information in paragraphs (b)(4)(i) through (vi) of this section for those rooms;
Citations to §63.366(b)(5)(i)
-
(5) If an EtO CEMS was used to demonstrate continuous compliance, you must report the information specified in paragraphs (b)(5)(i) through (vi) of this section.
Citations to §63.366(b)(5)(ii)
-
(5) If an EtO CEMS was used to demonstrate continuous compliance, you must report the information specified in paragraphs (b)(5)(i) through (vi) of this section.
Citations to §63.366(b)(5)(iii)
-
(5) If an EtO CEMS was used to demonstrate continuous compliance, you must report the information specified in paragraphs (b)(5)(i) through (vi) of this section.
Citations to §63.366(b)(5)(iv)
-
(5) If an EtO CEMS was used to demonstrate continuous compliance, you must report the information specified in paragraphs (b)(5)(i) through (vi) of this section.
Citations to §63.366(b)(5)(v)
-
(5) If an EtO CEMS was used to demonstrate continuous compliance, you must report the information specified in paragraphs (b)(5)(i) through (vi) of this section.
Citations to §63.366(b)(5)(vi)
-
(5) If an EtO CEMS was used to demonstrate continuous compliance, you must report the information specified in paragraphs (b)(5)(i) through (vi) of this section.
Citations to §63.366(b)(8)(i)
-
(8) If you own or operate an existing collection of Group 2 room air emissions at an area source facility and facility EtO use is less than 4 tpy, you must report the ID for any room where Group 2 room air emissions have ceased since end of the period covered by the previous compliance report. If a room has had Group 2 room air emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(8)(i) through (iv) of this section has changed for a room where there are Group 2 room air emissions that were included in the previous compliance report, you must report the information in paragraphs (b)(8)(i) through (iv) of this section for each room where there are Group 2 room air emissions.
Citations to §63.366(b)(8)(ii)
-
(8) If you own or operate an existing collection of Group 2 room air emissions at an area source facility and facility EtO use is less than 4 tpy, you must report the ID for any room where Group 2 room air emissions have ceased since end of the period covered by the previous compliance report. If a room has had Group 2 room air emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(8)(i) through (iv) of this section has changed for a room where there are Group 2 room air emissions that were included in the previous compliance report, you must report the information in paragraphs (b)(8)(i) through (iv) of this section for each room where there are Group 2 room air emissions.
Citations to §63.366(b)(8)(iii)
-
(8) If you own or operate an existing collection of Group 2 room air emissions at an area source facility and facility EtO use is less than 4 tpy, you must report the ID for any room where Group 2 room air emissions have ceased since end of the period covered by the previous compliance report. If a room has had Group 2 room air emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(8)(i) through (iv) of this section has changed for a room where there are Group 2 room air emissions that were included in the previous compliance report, you must report the information in paragraphs (b)(8)(i) through (iv) of this section for each room where there are Group 2 room air emissions.
Citations to §63.366(b)(8)(iv)
-
(8) If you own or operate an existing collection of Group 2 room air emissions at an area source facility and facility EtO use is less than 4 tpy, you must report the ID for any room where Group 2 room air emissions have ceased since end of the period covered by the previous compliance report. If a room has had Group 2 room air emissions since the end of the period covered by the previous compliance report, or if any of the information in paragraphs (b)(8)(i) through (iv) of this section has changed for a room where there are Group 2 room air emissions that were included in the previous compliance report, you must report the information in paragraphs (b)(8)(i) through (iv) of this section for each room where there are Group 2 room air emissions.
Citations to §63.366(c)
Citations to §63.366(f)(1)
-
(f) Beginning on June 4, 2024, within 60 days after the date of completing each performance test required by this subpart, you must submit the results of the performance test following the procedures specified in paragraphs (f)(1) through (3) of this section.(1) Submit the results of the performance test to the EPA via the CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The data must be submitted in a file format generated using the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.(2) The results of the performance test must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.(3) Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim for some of the information submitted under paragraph (f)(1)(i) or (ii) of this section, you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated using the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (f)(1)(i) and (ii) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.
Citations to §63.366(f)(2)
-
(f) Beginning on June 4, 2024, within 60 days after the date of completing each performance test required by this subpart, you must submit the results of the performance test following the procedures specified in paragraphs (f)(1) through (3) of this section.(1) Submit the results of the performance test to the EPA via the CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The data must be submitted in a file format generated using the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.(2) The results of the performance test must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.(3) Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim for some of the information submitted under paragraph (f)(1)(i) or (ii) of this section, you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated using the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (f)(1)(i) and (ii) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.
Citations to §63.366(f)(3)
-
(f) Beginning on June 4, 2024, within 60 days after the date of completing each performance test required by this subpart, you must submit the results of the performance test following the procedures specified in paragraphs (f)(1) through (3) of this section.(1) Submit the results of the performance test to the EPA via the CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The data must be submitted in a file format generated using the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.(2) The results of the performance test must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.(3) Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim for some of the information submitted under paragraph (f)(1)(i) or (ii) of this section, you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated using the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (f)(1)(i) and (ii) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.
Citations to §63.366(g)(1)
-
(g) Beginning on June 4, 2024, within 60 days after the date of completing each CEMS performance evaluation (as defined in § 63.2), you must submit the results of the performance evaluation following the procedures specified in paragraphs (g)(1) through (3) of this section.(1) Submit the results of the performance evaluation to the EPA via CEDRI, which can be accessed through the EPA's CDX. The data must be submitted in a file format generated using the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.(2) The results of the performance evaluation must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.(3) Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim for some of the information submitted under paragraph (g)(1)(i) or (ii) of this section, you must submit a complete file, including information claimed to be CBI, to the EPA. The CBI file must be generated using the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the CBI file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (g)(1)(i) and (ii) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.
Citations to §63.366(g)(2)
-
(g) Beginning on June 4, 2024, within 60 days after the date of completing each CEMS performance evaluation (as defined in § 63.2), you must submit the results of the performance evaluation following the procedures specified in paragraphs (g)(1) through (3) of this section.(1) Submit the results of the performance evaluation to the EPA via CEDRI, which can be accessed through the EPA's CDX. The data must be submitted in a file format generated using the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.(2) The results of the performance evaluation must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.(3) Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim for some of the information submitted under paragraph (g)(1)(i) or (ii) of this section, you must submit a complete file, including information claimed to be CBI, to the EPA. The CBI file must be generated using the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the CBI file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (g)(1)(i) and (ii) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.
Citations to §63.366(g)(3)
-
(g) Beginning on June 4, 2024, within 60 days after the date of completing each CEMS performance evaluation (as defined in § 63.2), you must submit the results of the performance evaluation following the procedures specified in paragraphs (g)(1) through (3) of this section.(1) Submit the results of the performance evaluation to the EPA via CEDRI, which can be accessed through the EPA's CDX. The data must be submitted in a file format generated using the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.(2) The results of the performance evaluation must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.(3) Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim for some of the information submitted under paragraph (g)(1)(i) or (ii) of this section, you must submit a complete file, including information claimed to be CBI, to the EPA. The CBI file must be generated using the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the CBI file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (g)(1)(i) and (ii) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.
Citations to §63.366(h)(1)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.
Citations to §63.366(h)(2)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.
Citations to §63.366(h)(3)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.
Citations to §63.366(h)(4)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.
Citations to §63.366(h)(5)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.
Citations to §63.366(h)(6)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.
Citations to §63.366(h)(7)
-
(h) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (h)(1) through (7) of this section.(1) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.(2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.(3) The outage may be planned or unplanned.(4) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(5) You must provide to the Administrator a written description identifying:(i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.(i) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (i)(1) through (5) of this section.(1) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).(2) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.(3) You must provide to the Administrator:(i) A written description of the force majeure event;(ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;(iii) A description of measures taken or to be taken to minimize the delay in reporting; and(iv) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.(4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.(5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.