(a) If you own or operate an affected source, you must comply with the applicable requirement by the compliance date specified in § 63.360(j). The standards of this section are summarized in tables 1 through 5 to this subpart.
-
(2) Complete the initial compliance demonstration within 180 days after the compliance date for the affected source as determined in § 63.360(j).
Citations to §63.360(j)(1)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(2)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(3)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(4)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(5)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(6)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(7)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(8)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(9)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(10)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(11)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(12)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(13)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(14)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(15)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(16)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.
Citations to §63.360(j)(17)
-
(j) You must comply with the provisions of this subpart no later than the dates specified in paragraphs (j)(1) through (17) of this section:(1) If you own or operate an existing affected source, you must comply with the applicable provisions of this subpart no later than the dates specified in tables 1 through 5 to this subpart, as applicable.(2) If you own or operate a new affected source, and the initial startup of your affected source is on or before April 5, 2024, you must comply with the provisions of this subpart no later than April 5, 2024.(3) If you own or operate a new affected source, and the initial startup is after April 5, 2024, you must comply with the provisions of this subpart upon startup of your affected source.(4) If existing SCV, ARV, or CEV or parts of an existing collection of Group 1 or Group 2 room air emissions are replaced such that the replacement meets the definition of reconstruction in § 63.2 and the reconstruction commenced after April 13, 2023, then the existing affected source becomes a new affected source. The reconstructed source must comply with the requirements for a new affected source upon initial startup of the reconstructed source or by April 5, 2024, whichever is later.(5) All existing SCVs at facilities that meet or exceed 1 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(6) All existing SCVs at facilities that do not exceed 1 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(7) All new SCVs at facilities that increase their EtO use over a year after startup such that the SCV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(8) All existing ARVs at facilities that meet or exceed 10 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(9) All existing ARVs at facilities that do not exceed 10 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use after thereafter, such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(10) All new ARVs at facilities that increase their EtO use over a year after startup such that the ARV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(11) All existing CEVs at facilities that do not exceed 60 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(12) All new CEVs at facilities that increase their EtO use over a year after startup such that the CEV becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(13) All existing collections of Group 1 room air emissions at facilities that do not exceed 40 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 1 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(14) All new Group 1 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 1 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(15) All existing collections of Group 2 room air emissions at facilities that meet or exceed 4 tpy of EtO use within any consecutive 12-month period after April 7, 2025, that increase their EtO use after April 6, 2026, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(16) All existing collections of Group 2 room air emissions at facilities that do not exceed 4 tpy of EtO use within any consecutive 12-month period after April 6, 2026, that increase their EtO use thereafter, such that the collection of Group 2 room air emissions becomes subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.(17) All new Group 2 room air emissions at facilities that increase their EtO use over a year after startup such that the Group 2 room air emissions become subject to a more stringent emission standard, immediately upon becoming subject to the more stringent emission standard.