§63.309. Performance tests and procedures. — Inbound Citations

40 C.F.R. § 63.309

Cited by 24 regulations in release Current.

Citations to 40 C.F.R. § 63.309 as a whole

  • (1) Whenever the Administrator learns that a delegated agency has not fully carried out the inspections and performance tests required under § 63.309 for each applicable emission point of each battery each day, the Administrator shall immediately notify the agency. Unless the delegated agency demonstrates to the Administrator's satisfaction within 15 days of notification that the agency is consistently carrying out the inspections and performance tests required under § 63.309 in the manner specified in the preceding sentence, the Administrator shall notify the coke oven battery owner or operator that inspections and performance tests shall be carried out according to § 63.309(a)(5). When the Administrator determines that the delegated agency is prepared to consistently perform all the required inspections and performance tests each day, the Administrator shall give the coke oven battery owner or operator at least 15 days notice that implementation will revert to the previously delegated agency.

Citations to §63.309(a)(5)

  • (1) Whenever the Administrator learns that a delegated agency has not fully carried out the inspections and performance tests required under § 63.309 for each applicable emission point of each battery each day, the Administrator shall immediately notify the agency. Unless the delegated agency demonstrates to the Administrator's satisfaction within 15 days of notification that the agency is consistently carrying out the inspections and performance tests required under § 63.309 in the manner specified in the preceding sentence, the Administrator shall notify the coke oven battery owner or operator that inspections and performance tests shall be carried out according to § 63.309(a)(5). When the Administrator determines that the delegated agency is prepared to consistently perform all the required inspections and performance tests each day, the Administrator shall give the coke oven battery owner or operator at least 15 days notice that implementation will revert to the previously delegated agency.

Citations to §63.309(d)(1)

Citations to §63.309(d)(2)

Citations to §63.309(d)(4)

  • (7) The owner or operator of a by-product coke oven battery with fewer than 30 ovens may elect to comply with an emission limitation of 2 or fewer leaking coke oven doors, as determined by the procedures in § 63.309(d)(4), as an alternative to the emission limitation for coke oven doors in paragraphs (b)(2)(i), (b)(3) (i) through (ii), (b)(4)(i), (b)(5), and (b)(6) of this section.

Citations to §63.309(d)(5)

Citations to §63.309(f)

Citations to §63.309(h)(1)

  • (c) Each flare installed to meet the requirements of this section shall be operated with no visible emissions, as determined by the methods specified in § 63.309(h)(1), except for periods not to exceed a total of 5 minutes during any 2 consecutive hours.

Citations to §63.309(h)(2)

Citations to §63.309(j)

  • (1) The owner or operator shall not discharge or cause to be discharged to the atmosphere from charging operations any fugitive emissions that exhibit an opacity greater than 20 percent, as determined by the procedures in § 63.309(j).

Citations to §63.309(j)(1)

  • (j) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test once each week to demonstrate compliance with the opacity limit in § 63.303(d)(1). The owner or operator shall conduct each performance test according to the procedures and requirements in paragraphs (j)(1) through (3) of this section.
    (1) Using a certified observer, determine the average opacity of five consecutive charges per week for each charging emissions capture system if charges can be observed according to the requirements of Method 9 in appendix A-4 to 40 CFR part 60 or ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), except as specified in paragraphs (j)(1)(i) and (ii) of this section.
    (i) Instead of the procedures in section 2.4 of Method 9 in appendix A-4 to 40 CFR part 60 or section 8.4 of ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), record observations to the nearest 5 percent at 15-second intervals for at least five consecutive charges.
    (ii) Instead of the procedures in section 2.5 of Method 9 in appendix A-4 to 40 CFR part 60 or section 8.5 of ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), determine and record the highest 3-minute average opacity for each charge from the consecutive observations recorded at 15-second intervals.
    (2) Opacity observations are to start when the door is removed for charging and end when the door is replaced.
    (3) Using the observations recorded from each performance test, the certified observer shall compute and record the average of the highest 3-minute averages for five consecutive charges.

Citations to §63.309(j)(2)

  • (j) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test once each week to demonstrate compliance with the opacity limit in § 63.303(d)(1). The owner or operator shall conduct each performance test according to the procedures and requirements in paragraphs (j)(1) through (3) of this section.
    (1) Using a certified observer, determine the average opacity of five consecutive charges per week for each charging emissions capture system if charges can be observed according to the requirements of Method 9 in appendix A-4 to 40 CFR part 60 or ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), except as specified in paragraphs (j)(1)(i) and (ii) of this section.
    (i) Instead of the procedures in section 2.4 of Method 9 in appendix A-4 to 40 CFR part 60 or section 8.4 of ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), record observations to the nearest 5 percent at 15-second intervals for at least five consecutive charges.
    (ii) Instead of the procedures in section 2.5 of Method 9 in appendix A-4 to 40 CFR part 60 or section 8.5 of ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), determine and record the highest 3-minute average opacity for each charge from the consecutive observations recorded at 15-second intervals.
    (2) Opacity observations are to start when the door is removed for charging and end when the door is replaced.
    (3) Using the observations recorded from each performance test, the certified observer shall compute and record the average of the highest 3-minute averages for five consecutive charges.

Citations to §63.309(j)(3)

  • (j) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test once each week to demonstrate compliance with the opacity limit in § 63.303(d)(1). The owner or operator shall conduct each performance test according to the procedures and requirements in paragraphs (j)(1) through (3) of this section.
    (1) Using a certified observer, determine the average opacity of five consecutive charges per week for each charging emissions capture system if charges can be observed according to the requirements of Method 9 in appendix A-4 to 40 CFR part 60 or ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), except as specified in paragraphs (j)(1)(i) and (ii) of this section.
    (i) Instead of the procedures in section 2.4 of Method 9 in appendix A-4 to 40 CFR part 60 or section 8.4 of ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), record observations to the nearest 5 percent at 15-second intervals for at least five consecutive charges.
    (ii) Instead of the procedures in section 2.5 of Method 9 in appendix A-4 to 40 CFR part 60 or section 8.5 of ASTM D7520-16 (as applicable; incorporated by reference, see § 63.14), determine and record the highest 3-minute average opacity for each charge from the consecutive observations recorded at 15-second intervals.
    (2) Opacity observations are to start when the door is removed for charging and end when the door is replaced.
    (3) Using the observations recorded from each performance test, the certified observer shall compute and record the average of the highest 3-minute averages for five consecutive charges.

Citations to §63.309(k)

  • (2) The owner or operator shall not discharge or cause to be discharged to the atmosphere any emissions of particulate matter (PM) from a charging emissions control device that exceed 0.0081 pounds per ton (lbs/ton) of dry coal charged, as determined by the procedures in § 63.309(k).
  • (4) Statement, signed by the owner or operator, that all applicable emission limitations in § 63.303(d)(1) and (2) for a new nonrecovery coke oven battery have been met. The owner or operator shall also include the results of the PM performance test required in § 63.309(k).

Citations to §63.309(k)(1)

  • (k) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test to demonstrate initial compliance with the emission limitations for a charging emissions control device in § 63.303(d)(2) within 180 days of the compliance date that is specified for the affected source in § 63.300(a)(4) and report the results in the notification of compliance status. The owner or operator shall prepare a site-specific test plan according to the requirements in § 63.7(c) and shall conduct each performance test according to the requirements in paragraphs (a) and (k)(1) through (4) of this section.
    (1) Determine the concentration of PM according to the following test methods in appendices A-1 through A-3 to 40 CFR part 60
    (i) Sampling sites must be located at the outlet of the control device and prior to any releases to the atmosphere.
    (iii) You may also use as an alternative to Method 3B, the manual method (but not instrumental procedures) for measuring the oxygen, carbon dioxide, and carbon monoxide content of exhaust gas, ANSI/ASME PTC 19.10-1981 (incorporated by reference, see § 63.14).
    (2) During each PM test run, sample only during periods of actual charging when the capture system fan and control device are engaged. Collect a minimum sample volume of 30 dry standard cubic feet (dscf) during each test run. Three valid test runs are needed to comprise a performance test. Each run must start at the beginning of a charge and finish at the end of a charge (i.e., sample for an integral number of charges).
    (3) Determine and record the total combined weight of tons of dry coal charged during the duration of each test run.
    (4) Compute the process-weighted mass emissions (Ep) for each test run using Equation 1 of this section as follows:

Citations to §63.309(k)(2)

  • (k) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test to demonstrate initial compliance with the emission limitations for a charging emissions control device in § 63.303(d)(2) within 180 days of the compliance date that is specified for the affected source in § 63.300(a)(4) and report the results in the notification of compliance status. The owner or operator shall prepare a site-specific test plan according to the requirements in § 63.7(c) and shall conduct each performance test according to the requirements in paragraphs (a) and (k)(1) through (4) of this section.
    (1) Determine the concentration of PM according to the following test methods in appendices A-1 through A-3 to 40 CFR part 60
    (i) Sampling sites must be located at the outlet of the control device and prior to any releases to the atmosphere.
    (iii) You may also use as an alternative to Method 3B, the manual method (but not instrumental procedures) for measuring the oxygen, carbon dioxide, and carbon monoxide content of exhaust gas, ANSI/ASME PTC 19.10-1981 (incorporated by reference, see § 63.14).
    (2) During each PM test run, sample only during periods of actual charging when the capture system fan and control device are engaged. Collect a minimum sample volume of 30 dry standard cubic feet (dscf) during each test run. Three valid test runs are needed to comprise a performance test. Each run must start at the beginning of a charge and finish at the end of a charge (i.e., sample for an integral number of charges).
    (3) Determine and record the total combined weight of tons of dry coal charged during the duration of each test run.
    (4) Compute the process-weighted mass emissions (Ep) for each test run using Equation 1 of this section as follows:

Citations to §63.309(k)(3)

  • (k) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test to demonstrate initial compliance with the emission limitations for a charging emissions control device in § 63.303(d)(2) within 180 days of the compliance date that is specified for the affected source in § 63.300(a)(4) and report the results in the notification of compliance status. The owner or operator shall prepare a site-specific test plan according to the requirements in § 63.7(c) and shall conduct each performance test according to the requirements in paragraphs (a) and (k)(1) through (4) of this section.
    (1) Determine the concentration of PM according to the following test methods in appendices A-1 through A-3 to 40 CFR part 60
    (i) Sampling sites must be located at the outlet of the control device and prior to any releases to the atmosphere.
    (iii) You may also use as an alternative to Method 3B, the manual method (but not instrumental procedures) for measuring the oxygen, carbon dioxide, and carbon monoxide content of exhaust gas, ANSI/ASME PTC 19.10-1981 (incorporated by reference, see § 63.14).
    (2) During each PM test run, sample only during periods of actual charging when the capture system fan and control device are engaged. Collect a minimum sample volume of 30 dry standard cubic feet (dscf) during each test run. Three valid test runs are needed to comprise a performance test. Each run must start at the beginning of a charge and finish at the end of a charge (i.e., sample for an integral number of charges).
    (3) Determine and record the total combined weight of tons of dry coal charged during the duration of each test run.
    (4) Compute the process-weighted mass emissions (Ep) for each test run using Equation 1 of this section as follows:

Citations to §63.309(k)(4)

  • (k) The owner or operator of a new nonrecovery coke oven battery shall conduct a performance test to demonstrate initial compliance with the emission limitations for a charging emissions control device in § 63.303(d)(2) within 180 days of the compliance date that is specified for the affected source in § 63.300(a)(4) and report the results in the notification of compliance status. The owner or operator shall prepare a site-specific test plan according to the requirements in § 63.7(c) and shall conduct each performance test according to the requirements in paragraphs (a) and (k)(1) through (4) of this section.
    (1) Determine the concentration of PM according to the following test methods in appendices A-1 through A-3 to 40 CFR part 60
    (i) Sampling sites must be located at the outlet of the control device and prior to any releases to the atmosphere.
    (iii) You may also use as an alternative to Method 3B, the manual method (but not instrumental procedures) for measuring the oxygen, carbon dioxide, and carbon monoxide content of exhaust gas, ANSI/ASME PTC 19.10-1981 (incorporated by reference, see § 63.14).
    (2) During each PM test run, sample only during periods of actual charging when the capture system fan and control device are engaged. Collect a minimum sample volume of 30 dry standard cubic feet (dscf) during each test run. Three valid test runs are needed to comprise a performance test. Each run must start at the beginning of a charge and finish at the end of a charge (i.e., sample for an integral number of charges).
    (3) Determine and record the total combined weight of tons of dry coal charged during the duration of each test run.
    (4) Compute the process-weighted mass emissions (Ep) for each test run using Equation 1 of this section as follows:

Citations to §63.309(l)

  • (6) Before September 3, 2024, report the results of any PM performance test for a charging emissions control device for a new nonrecovery coke oven battery conducted during the reporting period as required in § 63.309(l). Beginning on September 3, 2024, report PM performance test results according to paragraph (i) of this section.

Citations to §63.309(m)