§63.2852. What is a startup, shutdown, and malfunction plan? — Inbound Citations

40 C.F.R. § 63.2852

Cited by 4 regulations in release Current.

Citations to 40 U.S.C. § 63.2852 as a whole

  • (e) For all vegetable oil production processes subject to this subpart, you must exclusively use solvent where the volume fraction of each HAP comprises 1 percent or less by volume of the solvent (low-HAP solvent) in each delivery, and you must meet the requirements in paragraphs (e)(1) through (5) of this section. Your vegetable oil production process is not subject to the requirements in §§ 63.2850 through 63.2870 unless specifically referenced in paragraphs (e)(1) through (5) of this section.
    (1) You shall determine the HAP content of your solvent in accordance with the specifications in § 63.2854(b)(1).
    (2) You shall maintain documentation of the HAP content determination for each delivery of the solvent at the facility at all times.
    (3) You must submit an initial notification for existing sources in accordance with § 63.2860(a).
    (4) You must submit an initial notification for new and reconstructed sources in accordance with § 63.2860(b).
    (5) You must submit an annual compliance certification in accordance with § 63.2861(a). The certification should only include the information required under § 63.2861(a)(1) and (2), and a certification indicating whether the source complied with all of the requirements in paragraph (e) of this section.
  • (3) Develop a written startup, shutdown and malfunction (SSM) plan in accordance with the provisions in § 63.2852. On and after September 15, 2020, an SSM plan is not required.
  • (i) The plan for demonstrating compliance (as described in § 63.2851) and SSM plan (as described in § 63.2852) are complete and available on-site for inspection.
  • (b) Before September 15, 2020, prepare a plan for demonstrating compliance (as described in § 63.2851) and a SSM plan (as described in § 63.2852). In these two plans, describe the procedures you will follow in obtaining and recording data, and determining compliance under normal operations or a SSM subject to the § 63.2850(c)(2) or (d)(2) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the compliance date for your source and keep them on-site and readily available as long as the source is operational. On and after September 15, 2020, the requirement to prepare a SSM plan no longer applies, and the plan for demonstrating compliance must only describe the procedures you develop according to the requirements of § 63.2851.