US Codex
C.F.R.
Browse by date
Notes

§63.1221. What are the replacement standards for hazardous waste burning lightweight aggregate kilns? — Inbound Citations

40 C.F.R. § 63.1221

Cited by 24 regulations in release Current.

Citations to 40 C.F.R. § 63.1221 as a whole

  • (1) The date that your source begins to comply with § 63.1221 by placing a Documentation of Compliance in the operating record pursuant to § 63.1211(c);
  • (A) (1) You must comply with the emission standards under §§ 63.1219 through 63.1221, except for emission standards for hydrogen fluoride and hydrogen cyanide, and the other requirements of this subpart no later than the compliance date, October 14, 2008, unless the Administrator grants you an extension of time under § 63.6(i) or § 63.1213.
    (2) You must comply with the emission standards under §§ 63.1219 through 63.1221 for hydrogen fluoride and hydrogen cyanide no later than June 3, 2029 unless the Administrator grants you an extension of time under § 63.6(i) or § 63.1213.
  • (3) For solid fuel boilers and hydrochloric acid production furnaces, for lightweight aggregate kilns that are not subject to a numerical dioxin/furan emission standard under § 63.1221, and liquid fuel boilers that are not subject to a numerical dioxin/furan emission standard under § 63.1217, you must conduct a one-time emission test for dioxin/furan under feed and operating conditions that are most likely to reflect daily maximum operating variability, similar to a dioxin/furan comprehensive performance test.
    (i) You must conduct the dioxin/furan emissions test no later than the deadline for conducting the initial comprehensive performance test.
    (ii) You may use dioxin/furan emissions data from previous testing to meet this requirement, provided that:
    (A) The testing was conducted under feed and operating conditions that are most likely to reflect daily maximum operating variability, similar to a dioxin/furan compliance test;
    (B) You have not changed the design or operation of the source in a manner that could significantly affect stack gas dioxin/furan emission concentrations; and
    (C) The data meet quality assurance objectives that may be determined on a site-specific basis.
    (iii) You may use dioxin/furan emissions data from a source to represent emissions from another on-site source in lieu of testing (i.e., data in lieu of testing) if the design and operation, including hazardous waste feed and other feedstreams, of the sources are identical.
    (iv) You must include the results of the one-time dioxin/furan emissions test with the results of the initial comprehensive performance test in the Notification of Compliance.
    (v) You must repeat the dioxin/furan emissions test if you change the design or operation of the source in a manner that may increase dioxin/furan emissions.
    (vi) Sources that are required to perform the one-time dioxin/furan test pursuant to paragraph (b)(3) of this section are not required to perform confirmatory performance tests.
  • (iv) § 63.1221. (A) When complying with the emission standards under § 63.1221(a)(3)(i), (a)(4)(i), (b)(3)(i), and (b)(4)(i), you must establish 12-hour rolling average feedrate limits for semivolatile and low volatile metals as the thermal concentration of semivolatile metals or low volatile metals in all hazardous waste feedstreams as specified in paragraphs (n)(2)(iii)(A) of this section.
    (B) When complying with the emission standards under § 63.1221(a)(3)(ii), (a)(4)(ii), (b)(3)(ii), and (b)(4)(ii), you must establish 12-hour rolling average limits for the total feedrate of semivolatile and low volatile metals in all feedstreams as the average of the test run averages.
  • (b) These procedures apply to sources that have not previously complied with the requirements of paragraphs (b) and (c) of this section, and to sources that previously complied with the NIC requirements of §§ 63.1210 and 63.1212(a), which were in effect prior to October 11, 2000, that must make a technology change requiring a Class 1 permit modification to meet the standards of §§ 63.1219, 63.1220, and 63.1221.
    (1) You must prepare a Notification of Intent to Comply that includes all of the following information:
    (A) The name and address of the owner/operator and the source;
    (B) Whether the source is a major or an area source;
    (C) Waste minimization and emission control technique(s) being considered;
    (D) Emission monitoring technique(s) you are considering;
    (E) Waste minimization and emission control technique(s) effectiveness;
    (F) A description of the evaluation criteria used or to be used to select waste minimization and/or emission control technique(s); and
    (ii) As applicable to each source, information on key activities and estimated dates for these activities that will bring the source into compliance with emission control requirements of this subpart. You must include all of the following key activities and dates in your NIC:
    (A) The dates by which you anticipate you will develop engineering designs for emission control systems or process changes for emissions;
    (B) The date by which you anticipate you will commit internal or external resources for installing emission control systems or making process changes for emission control, or the date by which you will issue orders for the purchase of component parts to accomplish emission control or process changes.
    (C) The date by which you anticipate you will submit construction applications;
    (D) The date by which you anticipate you will initiate on-site construction, installation of emission control equipment, or process change;
    (E) The date by which you anticipate you will complete on-site construction, installation of emission control equipment, or process change; and
    (F) The date by which you anticipate you will achieve final compliance. The individual dates and milestones listed in paragraphs (b)(1)(ii)(A) through (F) of this section as part of the NIC are not requirements and therefore are not enforceable deadlines; the requirements of paragraphs (b)(1)(ii)(A) through (F) of this section must be included as part of the NIC only to inform the public of how you intend to comply with the emission standards of this subpart.
    (iii) A summary of the public meeting required under paragraph (c) of this section;
    (iv) If you intend to cease burning hazardous waste prior to or on the compliance date, the requirements of paragraphs (b)(1)(ii) and (b)(1)(iii) of this section do not apply. You must include in your NIC a schedule of key dates for the steps to be taken to stop hazardous waste activity at your combustion unit. Key dates include the date for submittal of RCRA closure documents required under subpart G, part 264 or subpart G, part 265 of this chapter.
    (2) You must make a draft of the NIC available for public review no later than 30 days prior to the public meeting required under paragraph (c)(1) of this section or no later than 9 months after the effective date of the rule if you intend to cease burning hazardous waste prior to or on the compliance date.
    (3) You must submit the final NIC to the Administrator:
    (i) No later than one year following the effective date of the emission standards of this subpart; or
    (ii) No later than 60 days following the informal public meeting.
    (iii) Beginning August 3, 2026, submit the final NIC as a portable document format (PDF) upload according to § 63.1211(g).
  • (1) Approval of alternatives to requirements in §§ 63.1200, 63.1203, 63.1204, 63.1205, 63.1206(a), 63.1215, 63.1216, 63.1217, 63.1218, 63.1219, 63.1220, and 63.1221.
  • (1) You may establish and comply with health-based compliance alternatives for total chlorine under the procedures prescribed in this section for your hazardous waste combustors other than hydrochloric acid production furnaces. You may comply with these health-based compliance alternatives in lieu of the emission standards for total chlorine provided under §§ 63.1216, 63.1217, and 63.1219 through 63.1221. To identify and comply with the limits, you must:
    (i) Identify a total chlorine emission concentration (ppmv) expressed as chloride (Cl−) equivalent for each on site hazardous waste combustor. You may select total chlorine emission concentrations as you choose to demonstrate eligibility for the risk-based limits under this section, except as provided by paragraph (b)(7) of this section;
    (ii) Apportion the total chlorine emission concentration between HCl and Cl2 according to paragraph (b)(6)(i) of this section, and calculate HCl and Cl2 emission rates (lb/hr) using the gas flowrate and other parameters from the most recent regulatory compliance test.
    (iii) Calculate the annual average HCl-equivalent emission rate as prescribed in paragraph (b)(2) of this section.
    (iv) Perform an eligibility demonstration to determine if your HCl-equivalent emission rate meets the national exposure standard and thus is below the annual average HCl-equivalent emission rate limit, as prescribed by paragraph (c) of this section;
    (v) Submit your eligibility demonstration for review and approval, as prescribed by paragraph (e) of this section, which must include information to ensure that the 1-hour average HCl-equivalent emission rate limit is not exceeded, as prescribed by paragraph (d) of this section;
    (vi) Demonstrate compliance with the annual average HCl-equivalent emission rate limit during the comprehensive performance test, as prescribed by the testing and monitoring requirements under paragraph (e) of this section;
    (vii) Comply with compliance monitoring requirements, including establishing feedrate limits on total chlorine and chloride, and operating parameter limits on emission control equipment, as prescribed by paragraph (f) of this section; and
  • (2) Facility owners or operators must comply with the Notification of Intent to Comply (NIC) requirements of 40 CFR 63.1210(b) and 63.1212(a) before a permit modification can be requested under this section for the purpose of technology changes needed to meet the 40 CFR 63.1215, 63.1216, 63.1217, 63.1218, 63.1219, 63.1220, and 63.1221 standards promulgated on October 12, 2005.

Citations to §63.1221(a)(2)(i)

Citations to §63.1221(a)(2)(ii)

  • (B) Except as provided by paragraph (l)(1)(iv)(C) of this section, when complying with the hazardous waste feedrate corresponding to a maximum theoretical emission concentration (MTEC) under § 63.1221(a)(2)(ii) and (b)(2)(ii), you must:
    (1) Comply with the MTEC operating requirement on a twelve-hour rolling average;
    (2) Monitor and record the feedrate of mercury for each hazardous waste feedstream according to § 63.1209(c);
    (3) Monitor with a CMS and record in the operating record the gas flowrate (either directly or by monitoring a surrogate parameter that you have correlated to gas flowrate);
    (4) Continuously calculate and record in the operating record a MTEC assuming mercury from all hazardous waste feedstreams is emitted;
    (5) Initiate an automatic waste feed cutoff that immediately and automatically cuts off the hazardous waste feed when the MTEC operating requirement is exceeded;

Citations to §63.1221(a)(3)(i)

Citations to §63.1221(a)(3)(ii)

Citations to §63.1221(a)(4)(i)

Citations to §63.1221(a)(4)(ii)

Citations to §63.1221(b)(2)(i)

Citations to §63.1221(b)(2)(ii)

  • (B) Except as provided by paragraph (l)(1)(iv)(C) of this section, when complying with the hazardous waste feedrate corresponding to a maximum theoretical emission concentration (MTEC) under § 63.1221(a)(2)(ii) and (b)(2)(ii), you must:
    (1) Comply with the MTEC operating requirement on a twelve-hour rolling average;
    (2) Monitor and record the feedrate of mercury for each hazardous waste feedstream according to § 63.1209(c);
    (3) Monitor with a CMS and record in the operating record the gas flowrate (either directly or by monitoring a surrogate parameter that you have correlated to gas flowrate);
    (4) Continuously calculate and record in the operating record a MTEC assuming mercury from all hazardous waste feedstreams is emitted;
    (5) Initiate an automatic waste feed cutoff that immediately and automatically cuts off the hazardous waste feed when the MTEC operating requirement is exceeded;

Citations to §63.1221(b)(3)(i)

Citations to §63.1221(b)(3)(ii)

Citations to §63.1221(b)(4)(i)

Citations to §63.1221(b)(4)(ii)