§63.1102. Compliance schedule. — Inbound Citations
40 C.F.R. § 63.1102
Statutory Authority
Cited by 44 regulations in release Current.
Citations to 40 U.S.C. § 63.1102 as a whole
-
-
(i) The owner or operator of a new or reconstructed affected source that commences construction or reconstruction after the proposal date, and that has an initial startup before the effective date of standards for an affected source, shall comply with this subpart no later than the applicable effective date in Table 1 to § 63.1102 of this section.
-
(ii) The compliance schedule, for affected sources as defined in paragraph (b)(1)(i) of this section, is specified in § 63.1102.
-
-
(B) Any request under this paragraph for an extension of compliance with a relevant standard shall be submitted in writing to the appropriate authority not later than 12 months before the affected source's compliance date (as specified in § 63.1102) for sources that are not including emission points in an emissions average, or not later than 18 months before the affected source's compliance date (as specified in § 63.1102) for sources that are including emission points in an emissions average. Emission standards established under this part may specify alternative dates for the submittal of requests for an extension of compliance if alternatives are appropriate for the source categories affected by those standards, e.g., a compliance date specified by the standard is less than 12 (or 18) months after the standard's effective date.
Citations to §63.1102(a)
-
You must comply with the requirements of this subpart according to the schedule specified in § 63.1102(a). Each heat exchange system which is part of an ethylene production affected source also must comply with paragraph (a) of this section. Each waste stream which is part of an ethylene production affected source also must comply with paragraph (b) of this section.
-
(ii) The compliance schedule for affected sources as defined in paragraph (a)(1)(i) of this section is specified in § 63.1102(a).
Citations to §63.1102(b)
-
(iii) The compliance schedule for affected sources, as defined in paragraph (h)(1)(i) of this section, is specified in paragraph (b) of § 63.1102.
Citations to §63.1102(c)
-
(b) The following provisions of subpart A of this part (General Provisions), §§ 63.1 through 63.5, and §§ 63.12 through 63.15, apply to owners or operators of affected sources subject to this subpart. For sources that reclassify from major source to area source status, the applicable provisions of § 63.9(j) and (k) apply. Beginning no later than the compliance dates specified in § 63.1102(c), for ethylene production affected sources, §§ 63.7(a)(4), (c), (e)(4), and (g)(2), 63.9(k), and 63.10(b)(2)(vi) also apply.
-
(10) Beginning no later than the compliance dates specified in § 63.1102(c), for each storage vessel subject to paragraph (b) or (c) of table 7 to § 63.1103(e), the owner or operator must comply with paragraphs (e)(10)(i) through (iv) of this section during storage vessel shutdown operations (i.e., emptying and degassing of a storage vessel) until the vapor space concentration in the storage vessel is less than 10 percent of the LEL. The owner or operator must determine the concentration using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.(i) Remove liquids from the storage vessel as much as practicable;(A) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to a flare and meet the requirements of § 63.983 and paragraphs (e)(4) and (9) of this section.(B) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to any combination of non-flare control devices and meet the requirements specified in § 63.982(c)(1) and paragraph (e)(9) of this section.(C) Reduce emissions of total organic HAP by 98 weight-percent by routing emissions to a fuel gas system or process and meet the requirements specified in § 63.982(d) and paragraph (e)(9) of this section.(iii) Maintain records necessary to demonstrate compliance with the requirements in § 63.1108(a)(4)(ii) including, if appropriate, records of existing standard site procedures used to empty and degas (deinventory) equipment for safety purposes.(iv) For floating roof storage vessels, the storage vessel may be opened to set up equipment (e.g., making connections to a temporary control device) for the shutdown operations but must not be actively degassed during this time period.
-
(5) Beginning no later than the compliance dates specified in § 63.1102(c), if emissions are vented through a closed vent system to a flare at an ethylene production affected source, then the owner or operator must comply with the requirements specified in § 63.1103(e)(4) instead of the requirements in § 63.987 and the provisions regarding flare compliance assessments at § 63.997(a) through (c).
-
(h) Beginning no later than the compliance dates specified in § 63.1102(c), except as specified in paragraph (h)(4) of this section, owners or operators of ethylene production affected sources must comply with the requirements specified in paragraphs (h)(1) and (2) of this section for pressure relief devices, such as relief valves or rupture disks, in organic HAP gas or vapor service instead of the pressure relief device requirements of § 63.1030 of subpart UU or § 63.165 of subpart H. Beginning no later than the compliance dates specified in § 63.1102(c), except as specified in paragraphs (h)(4) and (5) of this section, the owner or operator must also comply with the requirements specified in paragraphs (h)(3) and (6) through (8) of this section for all pressure relief devices.(1) Except during a pressure release, operate each pressure relief device in organic HAP gas or vapor service with an instrument reading of less than 500 ppm above background as measured by the method in § 63.1023(b) of subpart UU or § 63.180(b) and (c) of subpart H.(2) For pressure relief devices in organic HAP gas or vapor service, the owner or operator must comply with the applicable requirements in paragraphs (h)(2)(i) through (iii) of this section following a pressure release.(i) If the pressure relief device does not consist of or include a rupture disk, conduct instrument monitoring, as specified in § 63.1023(b) of subpart UU or § 63.180(b) and (c) of subpart H, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.(ii) If the pressure relief device includes a rupture disk, either comply with the requirements in paragraph (h)(2)(i) of this section (and do not replace the rupture disk) or install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release.(iii) If the pressure relief device consists only of a rupture disk, install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release. The owner or operator must not initiate startup of the equipment served by the rupture disk until the rupture disc is replaced.(3) Except as specified in paragraphs (h)(4) and (5) of this section, the owner or operator must comply with the requirements specified in paragraphs (h)(3)(i) through (v) of this section for all pressure relief devices in organic HAP service.(i) The owner or operator must equip each affected pressure relief device with a device(s) or use a monitoring system that is capable of:(A) Identifying the pressure release;(B) Recording the time and duration of each pressure release; and(C) The device or monitoring system must be either specific to the pressure relief device itself or must be associated with the process system or piping, sufficient to indicate a pressure release to the atmosphere. Examples of these types of devices and systems include, but are not limited to, a rupture disk indicator, magnetic sensor, motion detector on the pressure relief valve stem, flow monitor, or pressure monitor.(ii) The owner or operator must apply at least three redundant prevention measures to each affected pressure relief device and document these measures. Examples of prevention measures include:(A) Flow, temperature, liquid level and pressure indicators with deadman switches, monitors, or automatic actuators. Independent, non-duplicative systems within this category count as separate redundant prevention measures.(B) Documented routine inspection and maintenance programs and/or operator training (maintenance programs and operator training may count as only one redundant prevention measure).(E) Staged relief system where the initial pressure relief device (with lower set release pressure) discharges to a flare or other closed vent system and control device.(iii) If any affected pressure relief device releases to atmosphere as a result of a pressure release event, the owner or operator must perform root cause analysis and corrective action analysis according to the requirement in paragraph (h)(6) of this section and implement corrective actions according to the requirements in paragraph (h)(7) of this section. The owner or operator must also calculate the quantity of organic HAP released during each pressure release event and report this quantity as required in § 63.1110(e)(8)(iii). Calculations may be based on data from the pressure relief device monitoring alone or in combination with process parameter monitoring data and process knowledge.(iv) The owner or operator must determine the total number of release events that occurred during the calendar year for each affected pressure relief device separately. Prior to June 3, 2024, the owner or operator must also determine the total number of release events for each pressure relief device for which the root cause analysis concluded that the root cause was a force majeure event, as defined in § 63.1103(e)(2).(v) Except for pressure relief devices described in paragraphs (h)(4) and (5) of this section, the following release events from an affected pressure relief device are a violation of the pressure release management work practice standards.(A) Any release event for which the root cause of the event was determined to be operator error or poor maintenance.(B) Prior to June 3, 2024, a second release event not including force majeure events from a single pressure relief device in a 3-calendar year period for the same root cause for the same equipment. On and after June 3, 2024, a second release event from a single pressure relief device in a 3-calendar year period for the same root cause for the same equipment.(C) Prior to June 3, 2024, a third release event not including force majeure events from a single pressure relief device in a 3-calendar year period for any reason. On and after June 3, 2024, a third release event from a single pressure relief device in a 3-calendar year period for any reason.(i) If all releases and potential leaks from a pressure relief device are routed through a closed vent system to a control device, back into the process, a fuel gas system, or drain system, then the owner or operator is not required to comply with paragraph (h)(1), (2), or (3) of this section.(ii) Before the compliance dates specified in § 63.1102(c), both the closed vent system and control device (if applicable) referenced in paragraph (h)(4)(i) of this section must meet the applicable requirements specified in § 63.982(b) and (c)(2). Beginning no later than the compliance dates specified in § 63.1102(c), both the closed vent system and control device (if applicable) referenced in paragraph (h)(4)(i) of this section must meet the applicable requirements specified in §§ 63.982(c)(2), 63.983, and 63.1103(e)(4). For purposes of compliance with this paragraph, the phrase “Except for equipment needed for safety purposes such as pressure relief devices” in § 63.983(a)(3) does not apply.(iii) The drain system (if applicable) referenced in paragraph (h)(4)(i) of this section must meet the applicable requirements specified in § 61.346 or § 63.136.(5) The following types of pressure relief devices are not subject to the pressure release management requirements in paragraph (h)(3) of this section.(i) Pressure relief devices in heavy liquid service, as defined in § 63.1020 of subpart UU.(iv) Pilot-operated pressure relief devices where the primary release valve is routed through a closed vent system to a control device or back into the process, a fuel gas system, or drain system.(v) Balanced bellows pressure relief devices where the primary release valve is routed through a closed vent system to a control device or back into the process, a fuel gas system, or drain system.(6) A root cause analysis and corrective action analysis must be completed as soon as possible, but no later than 45 days after a release event. Special circumstances affecting the number of root cause analyses and/or corrective action analyses are provided in paragraphs (h)(6)(i) through (iii) of this section.(i) You may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices that are installed on the same equipment to release.(ii) Prior to June 3, 2024, you may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices to release, regardless of the equipment served, if the root cause is reasonably expected to be a force majeure event, as defined in § 63.1103(e)(2).(iii) Except as provided in paragraphs (h)(6)(i) and (ii) of this section, if more than one pressure relief device has a release during the same time period, an initial root cause analysis must be conducted separately for each pressure relief device that had a release. If the initial root cause analysis indicates that the release events have the same root cause(s), the initial separate root cause analyses may be recorded as a single root cause analysis and a single corrective action analysis may be conducted.(7) Each owner or operator required to conduct a root cause analysis and corrective action analysis as specified in paragraphs (h)(3)(iii) and (6) of this section, must implement the corrective action(s) identified in the corrective action analysis in accordance with the applicable requirements in paragraphs (h)(7)(i) through (iii) of this section.(i) All corrective action(s) must be implemented within 45 days of the event for which the root cause and corrective action analyses were required or as soon thereafter as practicable. If an owner or operator concludes that no corrective action should be implemented, the owner or operator must record and explain the basis for that conclusion no later than 45 days following the event.(ii) For corrective actions that cannot be fully implemented within 45 days following the event for which the root cause and corrective action analyses were required, the owner or operator must develop an implementation schedule to complete the corrective action(s) as soon as practicable.(iii) No later than 45 days following the event for which a root cause and corrective action analyses were required, the owner or operator must record the corrective action(s) completed to date, and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(8) For ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, owners or operators are prohibited from installing a flowing pilot-operated pressure relief device or replacing any pressure relief device with a flowing pilot-operated pressure relief device after July 6, 2023. For ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, owners or operators are prohibited from installing and operating flowing pilot-operated pressure relief devices. For purpose of compliance with this paragraph, a flowing pilot-operated pressure relief device means the type of pilot-operated pressure relief device where the pilot discharge vent continuously releases emissions to the atmosphere when the pressure relief device is actuated.
-
(a) The requirements of paragraphs (a)(1), (2), and (5) of this section apply to all affected sources except acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources. The requirements of paragraph (a)(4) of this section apply only to acrylic and modacrylic fiber production affected sources, polycarbonate production affected sources and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources. The requirements of paragraphs (a)(3), (6), and (7) of this section apply to all affected sources.(1) Except as provided in paragraph (a)(2) of this section, the emission limitations and established parameter ranges of this part shall apply at all times except during periods of startup, shutdown, malfunction, or non-operation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies. However, if a startup, shutdown, malfunction or period of non-operation of one portion of an affected source does not affect the ability of a particular emission point to comply with the specific provisions to which it is subject, then that emission point shall still be required to comply with the applicable provisions of this subpart and any of the subparts that are referenced by this subpart during startup, shutdown, malfunction, or period of non-operation.(2) If equipment leak requirements are referenced by this subpart for a subject source category, such requirements shall apply at all times except during periods of startup, shutdown, or malfunction, process unit shutdown (as defined in § 63.1101), or non-operation of the affected source (or specific portion thereof) in which the lines are drained and depressurized resulting in cessation of the emissions to which the equipment leak requirements apply.(3) For batch unit operations, shutdown does not include the normal periods between batch cycles; and startup does not include the recharging of batch unit operations, or the transitional conditions due to changes in product.(i) For acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing, and specified in § 63.1102(e) for carbon black production affected sources, the emission limitations and established parameter ranges of this part shall apply at all times except during periods of non-operation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies. Equipment leak requirements shall apply at all times except during periods of non-operation of the affected source (or specific portion thereof) in which the lines are drained and depressurized resulting in cessation of the emissions to which the equipment leak requirements apply.(ii) At all times, the owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require the owner or operator to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator that may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the affected source.(5) During startups, shutdowns, and malfunctions when the emission standards of this subpart and the subparts referenced by this subpart do not apply pursuant to paragraphs (a)(1) through (3) of this section, the owner or operator shall implement, to the extent reasonably available, measures to prevent or minimize excess emissions. The measures to be taken shall be identified in the startup, shutdown, and malfunction plan (if applicable), and may include, but are not limited to, air pollution control technologies, recovery technologies, work practices, pollution prevention, monitoring, and/or changes in the manner of operation of the affected source. Back-up control devices are not required, but may be used if available. Compliance with an inadequate startup, shutdown, and malfunction plan developed pursuant to § 63.1111 is not a shield for failing to comply with good operation and maintenance requirements.(6) Malfunctions shall be corrected as soon as practical after their occurrence.(7) Operation and maintenance requirements established pursuant to section 112 of the Act are enforceable, independent of emissions limitations or other requirements in relevant standards.
-
(a) Each owner or operator of an affected source subject to this subpart shall submit the reports listed in paragraphs (a)(1) through (8) of this section, as applicable. Each owner or operator of an acrylic and modacrylic fiber production affected source or polycarbonate production affected source subject to this subpart shall also submit the reports listed in paragraph (a)(9) of this section in addition to the reports listed in paragraphs (a)(1) through (8) of this section, as applicable. Beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources, each owner or operator of an ethylene production affected source, cyanide chemicals manufacturing affected source, and carbon black production affected source subject to this subpart shall also submit the reports listed in paragraph (a)(10) of this section in addition to the reports listed in paragraphs (a)(1) through (8) of this section, as applicable.(3) [Reserved](6) Application for approval of construction or reconstruction described in § 63.5(d) of subpart A of this part.(7) Startup, Shutdown, and Malfunction Reports described in § 63.1111 (except for acrylic and modacrylic fiber production affected sources, carbon black production affected sources, cyanide chemicals manufacturing affected sources, ethylene production affected sources, and polycarbonate production affected sources).(8) Other reports shall be submitted as specified elsewhere in this subpart and subparts referenced by this subpart.(9) Within 60 days after the date of completing each performance test (as defined in § 63.2), the owner or operator must submit the results of the performance tests, including any associated fuel analyses, required by this subpart according to the methods specified in paragraph (a)(9)(i) or (ii) of this section.(i) For data collected using test methods supported by the EPA-provided software, the owner or operator shall submit the results of the performance test to the EPA by direct computer-to-computer electronic transfer via EPA-provided software, unless otherwise approved by the Administrator. Owners or operators, who claim that some of the information being submitted for performance tests is confidential business information (CBI), must submit a complete file using EPA-provided software that includes information claimed to be CBI on a compact disc, flash drive, or other commonly used electronic storage media to the EPA. The electronic media must be clearly marked as CBI and mailed to U.S. EPA/OAPQS/CORE CBI Office, Attention: WebFIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA by direct computer-to-computer electronic transfer via EPA-provided software.(ii) For any performance test conducted using test methods that are not compatible with the EPA-provided software, the owner or operator shall submit the results of the performance test to the Administrator at the appropriate address listed in § 60.4.(i) Beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources, within 60 days after the date of completing each performance test required by this subpart or applicability assessment required by § 63.1103(f)(3)(iv), the owner or operator must submit the results of the performance test or applicability assessment following the procedures specified in § 63.9(k). Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website. Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test must be included as an attachment in the ERT or alternate electronic file.(ii) Beginning no later than the compliance dates specified in § 63.1102(c) through (e), the owner or operator must submit all subsequent Notification of Compliance Status reports required under paragraph (a)(4) of this section in portable document format (PDF) format to the EPA following the procedure specified in § 63.9(k). All subsequent Periodic Reports required under paragraph (a)(5) of this section must be submitted to the EPA via CEDRI using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k) beginning no later than the compliance dates specified in § 63.1102(c) through (e) or once the report template has been available on the CEDRI website for 1 year, whichever date is later. The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports under §§ 63.9(i) and 63.10(a) of subpart A, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. Any medium submitted through mail under § 63.9(k) for a Notification of Compliance Status report or Periodic Report must be sent to the attention of the Ethylene Production Sector Lead, Cyanide Chemicals Manufacturing Sector Lead, or Carbon Black Production Sector Lead, as appropriate.(iii) Beginning no later than the compliance date specified in § 63.1102(c) or once the report template for this subpart has been available on the CEDRI website for six months, whichever date is later, the items in § 63.1110(e)(4)(iv) and § 63.1110(e)(8)(iii) must be submitted to the EPA via CEDRI as specified in § 63.9(k) using the appropriate electronic report template on the CEDRI website for reporting that information. The report submitted to CEDRI must also contain company identifier information (including the company name and address) and the beginning and ending dates of the time period covered by the report. Once you begin submitting Periodic Reports to CEDRI in accordance with paragraph (a)(10)(ii) of this section, the items in § 63.1110(e)(4)(iv) and § 63.1110(e)(8)(iii) must be included in those Periodic Reports instead of submitting the information using the separate template.
Citations to §63.1102(c)(1)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(2)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(3)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(4)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(5)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(6)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(7)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(8)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(9)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(10)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(11)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(12)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(c)(13)
-
(c) All ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup or July 6, 2023, whichever is later. All ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, must be in compliance with the requirements listed in paragraphs (c)(1) through (13) of this section upon initial startup, or July 6, 2020, whichever is later.(1) Overlap requirements specified in § 63.1100(g)(4)(iii) and (7), if applicable.(2) The storage vessel requirements specified in paragraphs (b)(1)(iii) and (c)(1)(ii) of Table 7 to § 63.1103(e), and the degassing requirements specified in § 63.1103(e)(10).(3) The ethylene process vent requirements specified in paragraph (d)(1)(ii) of Table 7 to § 63.1103(e).(4) The transfer rack requirements specified in § 63.1105(a)(5).(5) The equipment requirements specified in paragraph (f)(1)(ii) of Table 7 to § 63.1103(e) and § 63.1107(h).(6) The bypass line requirements specified in paragraph (i) of Table 7 to § 63.1103(e), and § 63.1103(e)(6).(7) The decoking requirements for ethylene cracking furnaces specified in paragraph (j) of Table 7 to § 63.1103(e), and § 63.1103(e)(7) and (8).(8) The flare requirements specified in § 63.1103(e)(4).(9) The maintenance vent requirements specified in § 63.1103(e)(5).(10) The requirements specified in § 63.1103(e)(9).(11) The requirements in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(12) The recordkeeping requirements specified in § 63.1109(e) through (i).(13) The reporting requirements specified in § 63.1110(a)(10), (d)(1)(iv) and (v), and (e)(4) through (8).
Citations to §63.1102(d)
-
(6) Beginning no later than the compliance dates specified in § 63.1102(d), the referenced provisions specified in paragraphs (g)(6)(i) through (xxiii) of this section do not apply when demonstrating compliance with paragraph (g)(3) of this section.(i) The second/last sentence of § 63.983(a)(5) (requirements for pressure relief devices in a transfer rack's closed vent system requirements) of subpart SS: “Pressure relief devices needed for safety purposes are not subject to this paragraph.”(ii) The phrase “except during periods of start-up, shutdown and malfunction as specified in the referencing subpart” in § 63.984(a) of subpart SS (equipment and operating requirements for fuel gas systems and processes requirements).(iii) The phrase “except during periods of start-up, shutdown and malfunction as specified in the referencing subpart” in § 63.985(a) of subpart SS (nonflare control device equipment and operating requirements).(iv) The phrase “other than start-ups, shutdowns, or malfunctions” in § 63.994(c)(1)(ii)(D) of subpart SS (halogen scrubber and other halogen reduction device monitoring requirements).(v) Section 63.996(c)(2)(ii) of subpart SS (operation and maintenance of continuous parameter monitoring systems) “(ii) If under the referencing subpart, an owner or operator has developed a start-up, shutdown, and malfunction plan, the plan is followed, and the CPMS is repaired immediately, this action shall be recorded as specified in § 63.998(c)(1)(ii)(E).”(vi) The last sentence of § 63.997(e)(1)(i) (performance test procedures) of subpart SS (general procedures for continuous unit operations): “Operations during periods of start-up, shutdown, and malfunction shall not constitute representative conditions for the purpose of a performance test.”(vii) Section 63.998(b)(2)(iii) (excluded data) of subpart SS: “(iii) Startups, shutdowns, and malfunctions, if the owner or operator operates the source during such periods in accordance with § 63.1111(a) and maintains the records specified in paragraph (d)(3) of this section.”(viii) The phrase “other than periods of startups, shutdowns, and malfunctions” from § 63.998(b)(5)(i)(A) (alternative recordkeeping) of subpart SS.(ix) The phrase “other than a start-up, shutdown, or malfunction” from § 63.998(b)(5)(i)(B)(3) (alternate recordkeeping) of subpart SS.(x) The phrase “other than periods of startups, shutdowns, and malfunctions” from § 63.998(b)(5)(i)(C) (alternate recordkeeping) of subpart SS.(xi) The phrase “other than a start-up, shutdown, or malfunction” from § 63.998(b)(5)(ii)(C) (alternate recordkeeping) of subpart SS.(xii) The phrase “except as provided in paragraphs (b)(6)(i)(A) and (B) of this section” from § 63.998(b)(6)(i) (alternative recordkeeping) of subpart SS.(xiii) The second sentence of § 63.998(b)(6)(ii) (alternative recordkeeping) of subpart SS. “If a source has developed a startup, shutdown and malfunction plan, and a monitored parameter is outside its established range or monitoring data are not collected during periods of startup, shutdown, or malfunction (and the source is operated during such periods in accordance with § 63.1111(a)) or during periods of nonoperation of the process unit or portion thereof (resulting in cessation of the emissions to which monitoring applies), then the excursion is not a violation and, in cases where continuous monitoring is required, the excursion does not count as the excused excursion for determining compliance.”(xiv) Section 63.998(c)(1)(ii)(D) through (G) (nonflare control and recovery device regulated source monitoring records) of subpart SS.(xv) Section 63.998(d)(3) (regulated source and control equipment start-up, shutdown and malfunction records) of subpart SS.(xvi) The phrase “may be included as part of the startup, shutdown, and malfunction plan, as required by the referencing subpart for the source, or” from § 63.1005(e)(4)(i) (leak repair records written procedures) of subpart TT.(xvii) The phrase “(except periods of startup, shutdown, or malfunction)” from § 63.1007(e)(1)(ii)(A) (dual mechanical seal system special provisions for pumps) of subpart TT.(xviii) The phrase “(except periods of startup, shutdown, or malfunction)” from § 63.1009(e)(1)(i)(A) (dual mechanical seal system special provisions for agitators) of subpart TT.(xix) The phrase “(except periods of startup, shutdown, or malfunction)” from § 63.1012(b)(1) (compressor seal system standard) of subpart TT.(xx) The phrase “may be included as part of the startup, shutdown, and malfunction plan, as required by the referencing subpart for the source, or” from § 63.1024(f)(4)(i) (leak repair records written procedures) of subpart UU.
-
(a) The requirements of paragraphs (a)(1), (2), and (5) of this section apply to all affected sources except acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources. The requirements of paragraph (a)(4) of this section apply only to acrylic and modacrylic fiber production affected sources, polycarbonate production affected sources and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources. The requirements of paragraphs (a)(3), (6), and (7) of this section apply to all affected sources.(1) Except as provided in paragraph (a)(2) of this section, the emission limitations and established parameter ranges of this part shall apply at all times except during periods of startup, shutdown, malfunction, or non-operation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies. However, if a startup, shutdown, malfunction or period of non-operation of one portion of an affected source does not affect the ability of a particular emission point to comply with the specific provisions to which it is subject, then that emission point shall still be required to comply with the applicable provisions of this subpart and any of the subparts that are referenced by this subpart during startup, shutdown, malfunction, or period of non-operation.(2) If equipment leak requirements are referenced by this subpart for a subject source category, such requirements shall apply at all times except during periods of startup, shutdown, or malfunction, process unit shutdown (as defined in § 63.1101), or non-operation of the affected source (or specific portion thereof) in which the lines are drained and depressurized resulting in cessation of the emissions to which the equipment leak requirements apply.(3) For batch unit operations, shutdown does not include the normal periods between batch cycles; and startup does not include the recharging of batch unit operations, or the transitional conditions due to changes in product.(i) For acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing, and specified in § 63.1102(e) for carbon black production affected sources, the emission limitations and established parameter ranges of this part shall apply at all times except during periods of non-operation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies. Equipment leak requirements shall apply at all times except during periods of non-operation of the affected source (or specific portion thereof) in which the lines are drained and depressurized resulting in cessation of the emissions to which the equipment leak requirements apply.(ii) At all times, the owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require the owner or operator to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator that may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the affected source.(5) During startups, shutdowns, and malfunctions when the emission standards of this subpart and the subparts referenced by this subpart do not apply pursuant to paragraphs (a)(1) through (3) of this section, the owner or operator shall implement, to the extent reasonably available, measures to prevent or minimize excess emissions. The measures to be taken shall be identified in the startup, shutdown, and malfunction plan (if applicable), and may include, but are not limited to, air pollution control technologies, recovery technologies, work practices, pollution prevention, monitoring, and/or changes in the manner of operation of the affected source. Back-up control devices are not required, but may be used if available. Compliance with an inadequate startup, shutdown, and malfunction plan developed pursuant to § 63.1111 is not a shield for failing to comply with good operation and maintenance requirements.(6) Malfunctions shall be corrected as soon as practical after their occurrence.(7) Operation and maintenance requirements established pursuant to section 112 of the Act are enforceable, independent of emissions limitations or other requirements in relevant standards.
-
(a) Each owner or operator of an affected source subject to this subpart shall submit the reports listed in paragraphs (a)(1) through (8) of this section, as applicable. Each owner or operator of an acrylic and modacrylic fiber production affected source or polycarbonate production affected source subject to this subpart shall also submit the reports listed in paragraph (a)(9) of this section in addition to the reports listed in paragraphs (a)(1) through (8) of this section, as applicable. Beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources, each owner or operator of an ethylene production affected source, cyanide chemicals manufacturing affected source, and carbon black production affected source subject to this subpart shall also submit the reports listed in paragraph (a)(10) of this section in addition to the reports listed in paragraphs (a)(1) through (8) of this section, as applicable.(3) [Reserved](6) Application for approval of construction or reconstruction described in § 63.5(d) of subpart A of this part.(7) Startup, Shutdown, and Malfunction Reports described in § 63.1111 (except for acrylic and modacrylic fiber production affected sources, carbon black production affected sources, cyanide chemicals manufacturing affected sources, ethylene production affected sources, and polycarbonate production affected sources).(8) Other reports shall be submitted as specified elsewhere in this subpart and subparts referenced by this subpart.(9) Within 60 days after the date of completing each performance test (as defined in § 63.2), the owner or operator must submit the results of the performance tests, including any associated fuel analyses, required by this subpart according to the methods specified in paragraph (a)(9)(i) or (ii) of this section.(i) For data collected using test methods supported by the EPA-provided software, the owner or operator shall submit the results of the performance test to the EPA by direct computer-to-computer electronic transfer via EPA-provided software, unless otherwise approved by the Administrator. Owners or operators, who claim that some of the information being submitted for performance tests is confidential business information (CBI), must submit a complete file using EPA-provided software that includes information claimed to be CBI on a compact disc, flash drive, or other commonly used electronic storage media to the EPA. The electronic media must be clearly marked as CBI and mailed to U.S. EPA/OAPQS/CORE CBI Office, Attention: WebFIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA by direct computer-to-computer electronic transfer via EPA-provided software.(ii) For any performance test conducted using test methods that are not compatible with the EPA-provided software, the owner or operator shall submit the results of the performance test to the Administrator at the appropriate address listed in § 60.4.(i) Beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources, within 60 days after the date of completing each performance test required by this subpart or applicability assessment required by § 63.1103(f)(3)(iv), the owner or operator must submit the results of the performance test or applicability assessment following the procedures specified in § 63.9(k). Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website. Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test must be included as an attachment in the ERT or alternate electronic file.(ii) Beginning no later than the compliance dates specified in § 63.1102(c) through (e), the owner or operator must submit all subsequent Notification of Compliance Status reports required under paragraph (a)(4) of this section in portable document format (PDF) format to the EPA following the procedure specified in § 63.9(k). All subsequent Periodic Reports required under paragraph (a)(5) of this section must be submitted to the EPA via CEDRI using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k) beginning no later than the compliance dates specified in § 63.1102(c) through (e) or once the report template has been available on the CEDRI website for 1 year, whichever date is later. The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports under §§ 63.9(i) and 63.10(a) of subpart A, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. Any medium submitted through mail under § 63.9(k) for a Notification of Compliance Status report or Periodic Report must be sent to the attention of the Ethylene Production Sector Lead, Cyanide Chemicals Manufacturing Sector Lead, or Carbon Black Production Sector Lead, as appropriate.(iii) Beginning no later than the compliance date specified in § 63.1102(c) or once the report template for this subpart has been available on the CEDRI website for six months, whichever date is later, the items in § 63.1110(e)(4)(iv) and § 63.1110(e)(8)(iii) must be submitted to the EPA via CEDRI as specified in § 63.9(k) using the appropriate electronic report template on the CEDRI website for reporting that information. The report submitted to CEDRI must also contain company identifier information (including the company name and address) and the beginning and ending dates of the time period covered by the report. Once you begin submitting Periodic Reports to CEDRI in accordance with paragraph (a)(10)(ii) of this section, the items in § 63.1110(e)(4)(iv) and § 63.1110(e)(8)(iii) must be included in those Periodic Reports instead of submitting the information using the separate template.
Citations to §63.1102(d)(2)(i)
-
(2) All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction on or before January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup or May 18, 2022, whichever is later. All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction after January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(g)(6) related to 40 part 63, subparts SS, TT, and UU startup, shutdown, and malfunction requirements.(ii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iii) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(d)(2)(ii)
-
(2) All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction on or before January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup or May 18, 2022, whichever is later. All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction after January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(g)(6) related to 40 part 63, subparts SS, TT, and UU startup, shutdown, and malfunction requirements.(ii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iii) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(d)(2)(iii)
-
(2) All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction on or before January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup or May 18, 2022, whichever is later. All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction after January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(g)(6) related to 40 part 63, subparts SS, TT, and UU startup, shutdown, and malfunction requirements.(ii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iii) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(d)(iii)
-
(2) All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction on or before January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup or May 18, 2022, whichever is later. All cyanide chemicals manufacturing affected sources that commenced construction or reconstruction after January 15, 2021, must be in compliance with the requirements listed in paragraphs (d)(2)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(g)(6) related to 40 part 63, subparts SS, TT, and UU startup, shutdown, and malfunction requirements.(ii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iii) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(e)
-
(iii) The boiler and process heater tune up requirements of paragraphs (f)(3)(iii)(A) through (F) of this section apply beginning no later than the compliance dates specified in § 63.1102(e) for carbon black production affected sources and as specified in Table 8 to § 63.1103(f), line entry (c).(A) Inspect the combustion device for damage, wear, and buildup of material that could impact effectiveness, and clean or replace any components of the burner as necessary. Units that produce electricity for sale may delay the combustion device inspection until the first outage after the annual inspection is required, not to exceed 36 months from the previous inspection. At units where entry into a piece of process equipment or into a storage vessel is required to complete the tune-up inspections, inspections are required only during planned entries into the storage vessel or process equipment;(B) When possible based upon the configuration of the burner, inspect the flame pattern and adjust the burner if needed to optimize the flame pattern. If manufacturer's specifications for an optimized flame pattern are available, the adjustment should be consistent with the manufacturer's specifications;(C) For any calibrated components ensure that it is correctly calibrated The annual inspection may be delayed until the next scheduled unit shutdown. Units that produce electricity for sale may delay the inspection until the first outage after the annual inspection is required, not to exceed 36 months from the previous inspection;(D) If manufacturer's specifications for optimization are available, this optimization should be consistent with the manufacturer's specifications and with any NOX requirement to which the unit is subject. If no manufacturer's specifications are available, the inspection and cleaning procedures of paragraph (f)(3)(iii)(A) fulfill the obligations of this paragraph;(E) Measure the concentrations in the effluent stream of CO in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made. Measurements may be taken using a portable CO analyzer and may be either on a dry or wet basis, as long as it is the same basis before and after the adjustments are made. If adjustments are not or cannot be made, make the measurements before and after the inspection and cleaning procedures specified in paragraph (f)(3)(iii)(A); and(F) Maintain on-site and submit, if requested by the Administrator, a report containing the information in paragraphs (f)(3)(iii)(F)(1) through (3) of this section,(1) The concentrations of CO in the effluent stream in parts per million by volume, and oxygen in volume percent, measured at high fire or typical operating load, before and after the tune-up of the boiler or process heater;(2) A description of any corrective actions taken as a part of the tune-up; and(3) The type and amount of fuel used over the 12 months prior to the tune-up, but only if the unit was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel used by each unit.
-
(a) The requirements of paragraphs (a)(1), (2), and (5) of this section apply to all affected sources except acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources. The requirements of paragraph (a)(4) of this section apply only to acrylic and modacrylic fiber production affected sources, polycarbonate production affected sources and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources. The requirements of paragraphs (a)(3), (6), and (7) of this section apply to all affected sources.(1) Except as provided in paragraph (a)(2) of this section, the emission limitations and established parameter ranges of this part shall apply at all times except during periods of startup, shutdown, malfunction, or non-operation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies. However, if a startup, shutdown, malfunction or period of non-operation of one portion of an affected source does not affect the ability of a particular emission point to comply with the specific provisions to which it is subject, then that emission point shall still be required to comply with the applicable provisions of this subpart and any of the subparts that are referenced by this subpart during startup, shutdown, malfunction, or period of non-operation.(2) If equipment leak requirements are referenced by this subpart for a subject source category, such requirements shall apply at all times except during periods of startup, shutdown, or malfunction, process unit shutdown (as defined in § 63.1101), or non-operation of the affected source (or specific portion thereof) in which the lines are drained and depressurized resulting in cessation of the emissions to which the equipment leak requirements apply.(3) For batch unit operations, shutdown does not include the normal periods between batch cycles; and startup does not include the recharging of batch unit operations, or the transitional conditions due to changes in product.(i) For acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, and beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing, and specified in § 63.1102(e) for carbon black production affected sources, the emission limitations and established parameter ranges of this part shall apply at all times except during periods of non-operation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies. Equipment leak requirements shall apply at all times except during periods of non-operation of the affected source (or specific portion thereof) in which the lines are drained and depressurized resulting in cessation of the emissions to which the equipment leak requirements apply.(ii) At all times, the owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require the owner or operator to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator that may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the affected source.(5) During startups, shutdowns, and malfunctions when the emission standards of this subpart and the subparts referenced by this subpart do not apply pursuant to paragraphs (a)(1) through (3) of this section, the owner or operator shall implement, to the extent reasonably available, measures to prevent or minimize excess emissions. The measures to be taken shall be identified in the startup, shutdown, and malfunction plan (if applicable), and may include, but are not limited to, air pollution control technologies, recovery technologies, work practices, pollution prevention, monitoring, and/or changes in the manner of operation of the affected source. Back-up control devices are not required, but may be used if available. Compliance with an inadequate startup, shutdown, and malfunction plan developed pursuant to § 63.1111 is not a shield for failing to comply with good operation and maintenance requirements.(6) Malfunctions shall be corrected as soon as practical after their occurrence.(7) Operation and maintenance requirements established pursuant to section 112 of the Act are enforceable, independent of emissions limitations or other requirements in relevant standards.
-
(a) Each owner or operator of an affected source subject to this subpart shall submit the reports listed in paragraphs (a)(1) through (8) of this section, as applicable. Each owner or operator of an acrylic and modacrylic fiber production affected source or polycarbonate production affected source subject to this subpart shall also submit the reports listed in paragraph (a)(9) of this section in addition to the reports listed in paragraphs (a)(1) through (8) of this section, as applicable. Beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources, each owner or operator of an ethylene production affected source, cyanide chemicals manufacturing affected source, and carbon black production affected source subject to this subpart shall also submit the reports listed in paragraph (a)(10) of this section in addition to the reports listed in paragraphs (a)(1) through (8) of this section, as applicable.(3) [Reserved](6) Application for approval of construction or reconstruction described in § 63.5(d) of subpart A of this part.(7) Startup, Shutdown, and Malfunction Reports described in § 63.1111 (except for acrylic and modacrylic fiber production affected sources, carbon black production affected sources, cyanide chemicals manufacturing affected sources, ethylene production affected sources, and polycarbonate production affected sources).(8) Other reports shall be submitted as specified elsewhere in this subpart and subparts referenced by this subpart.(9) Within 60 days after the date of completing each performance test (as defined in § 63.2), the owner or operator must submit the results of the performance tests, including any associated fuel analyses, required by this subpart according to the methods specified in paragraph (a)(9)(i) or (ii) of this section.(i) For data collected using test methods supported by the EPA-provided software, the owner or operator shall submit the results of the performance test to the EPA by direct computer-to-computer electronic transfer via EPA-provided software, unless otherwise approved by the Administrator. Owners or operators, who claim that some of the information being submitted for performance tests is confidential business information (CBI), must submit a complete file using EPA-provided software that includes information claimed to be CBI on a compact disc, flash drive, or other commonly used electronic storage media to the EPA. The electronic media must be clearly marked as CBI and mailed to U.S. EPA/OAPQS/CORE CBI Office, Attention: WebFIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA by direct computer-to-computer electronic transfer via EPA-provided software.(ii) For any performance test conducted using test methods that are not compatible with the EPA-provided software, the owner or operator shall submit the results of the performance test to the Administrator at the appropriate address listed in § 60.4.(i) Beginning no later than the compliance dates specified in § 63.1102(c) for ethylene production affected sources, specified in § 63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in § 63.1102(e) for carbon black production affected sources, within 60 days after the date of completing each performance test required by this subpart or applicability assessment required by § 63.1103(f)(3)(iv), the owner or operator must submit the results of the performance test or applicability assessment following the procedures specified in § 63.9(k). Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website. Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test must be included as an attachment in the ERT or alternate electronic file.(ii) Beginning no later than the compliance dates specified in § 63.1102(c) through (e), the owner or operator must submit all subsequent Notification of Compliance Status reports required under paragraph (a)(4) of this section in portable document format (PDF) format to the EPA following the procedure specified in § 63.9(k). All subsequent Periodic Reports required under paragraph (a)(5) of this section must be submitted to the EPA via CEDRI using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k) beginning no later than the compliance dates specified in § 63.1102(c) through (e) or once the report template has been available on the CEDRI website for 1 year, whichever date is later. The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports under §§ 63.9(i) and 63.10(a) of subpart A, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. Any medium submitted through mail under § 63.9(k) for a Notification of Compliance Status report or Periodic Report must be sent to the attention of the Ethylene Production Sector Lead, Cyanide Chemicals Manufacturing Sector Lead, or Carbon Black Production Sector Lead, as appropriate.(iii) Beginning no later than the compliance date specified in § 63.1102(c) or once the report template for this subpart has been available on the CEDRI website for six months, whichever date is later, the items in § 63.1110(e)(4)(iv) and § 63.1110(e)(8)(iii) must be submitted to the EPA via CEDRI as specified in § 63.9(k) using the appropriate electronic report template on the CEDRI website for reporting that information. The report submitted to CEDRI must also contain company identifier information (including the company name and address) and the beginning and ending dates of the time period covered by the report. Once you begin submitting Periodic Reports to CEDRI in accordance with paragraph (a)(10)(ii) of this section, the items in § 63.1110(e)(4)(iv) and § 63.1110(e)(8)(iii) must be included in those Periodic Reports instead of submitting the information using the separate template.
Citations to §63.1102(e)(1)(i)
-
(1) If applicable, all carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(1)(i) through (iii) of this section upon initial startup or November 20, 2022, whichever is later. If applicable, all carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(1)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The process vent applicability determination requirements specified in § 63.1103(f)(3)(iv).(ii) The performance test frequency requirements specified in § 63.1108(b)(4)(ii).(iii) The boiler and process heater tune up requirements specified in § 63.1103(f)(3)(iii).
Citations to §63.1102(e)(1)(ii)
-
(1) If applicable, all carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(1)(i) through (iii) of this section upon initial startup or November 20, 2022, whichever is later. If applicable, all carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(1)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The process vent applicability determination requirements specified in § 63.1103(f)(3)(iv).(ii) The performance test frequency requirements specified in § 63.1108(b)(4)(ii).(iii) The boiler and process heater tune up requirements specified in § 63.1103(f)(3)(iii).
Citations to §63.1102(e)(1)(iii)
-
(1) If applicable, all carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(1)(i) through (iii) of this section upon initial startup or November 20, 2022, whichever is later. If applicable, all carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(1)(i) through (iii) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The process vent applicability determination requirements specified in § 63.1103(f)(3)(iv).(ii) The performance test frequency requirements specified in § 63.1108(b)(4)(ii).(iii) The boiler and process heater tune up requirements specified in § 63.1103(f)(3)(iii).
Citations to §63.1102(e)(2)(i)
-
(2) All carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup or May 18, 2022, whichever is later. All carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(f)(4) related to 40 part 63, subpart SS, startup, shutdown, and malfunction requirements.(ii) The exception specified in § 63.1103(f)(5) related to the requirement that a closed vent system route the collected vapors to a control device when demonstrating compliance.(iii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iv) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(e)(2)(ii)
-
(2) All carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup or May 18, 2022, whichever is later. All carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(f)(4) related to 40 part 63, subpart SS, startup, shutdown, and malfunction requirements.(ii) The exception specified in § 63.1103(f)(5) related to the requirement that a closed vent system route the collected vapors to a control device when demonstrating compliance.(iii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iv) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(e)(2)(iii)
-
(2) All carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup or May 18, 2022, whichever is later. All carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(f)(4) related to 40 part 63, subpart SS, startup, shutdown, and malfunction requirements.(ii) The exception specified in § 63.1103(f)(5) related to the requirement that a closed vent system route the collected vapors to a control device when demonstrating compliance.(iii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iv) The electronic reporting requirements specified in § 63.1110(a)(10).
Citations to §63.1102(e)(2)(iv)
-
(2) All carbon black production affected sources that commenced construction or reconstruction on or before January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup or May 18, 2022, whichever is later. All carbon black production affected sources that commenced construction or reconstruction after January 14, 2021, must be in compliance with the requirements listed in paragraphs (e)(2)(i) through (iv) of this section upon initial startup, or November 19, 2021, whichever is later.(i) The exceptions specified in § 63.1103(f)(4) related to 40 part 63, subpart SS, startup, shutdown, and malfunction requirements.(ii) The exception specified in § 63.1103(f)(5) related to the requirement that a closed vent system route the collected vapors to a control device when demonstrating compliance.(iii) The compliance requirements specified in § 63.1108(a)(4), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).(iv) The electronic reporting requirements specified in § 63.1110(a)(10).