§63.109. Procedures for determining whether process vents, storage vessels, equipment, wastewater, and heat exchange systems are in ethylene oxide service. — Inbound Citations

40 C.F.R. § 63.109

Cited by 39 regulations in release Current.

Citations to 40 U.S.C. § 63.109 as a whole

Citations to §63.109(a)

  • This section applies beginning no later than the compliance dates specified in § 63.100(k)(11). To determine if process vents, storage vessels, equipment leaks, wastewater, and heat exchange systems are in ethylene oxide service, as defined in § 63.101, owners and operators must comply with the requirements in paragraphs (a) through (e) of this section, as applicable.
  • (89) ASTM D6348-12 (Reapproved 2020), Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy, Approved February 1, 2012, IBR approved for §§ 63.109(a); 63.365(b); 63.509(a); 63.7322(d), (e), and (g); 63.7825(g) and (h); table 5 to subpart AAAAA.

Citations to §63.109(a)(1)

  • (a) Except as specified in paragraph (a)(7) of this section, for each Group 1 and Group 2 process vent stream, owners and operators must measure the flow rate and concentration of ethylene oxide of each process vent as specified in paragraphs (a)(1) through (6) of this section.
    (1) Measurements must be made prior to any dilution of the vent streams.
    (2) Measurements may be made on the combined vent streams at a chemical manufacturing process unit or for each separate vent stream.
    (3) The sampling site shall be after the last recovery device (if any recovery devices are present) but prior to the inlet of any control device that is present and prior to release to the atmosphere. Method 1 or 1A of appendix A-1 to part 60 of this chapter, as appropriate, must be used for the selection of the sampling sites. For vents smaller than 0.10 meter in diameter, sample at one point at the center of the duct.
    (4) The gas volumetric flow rate must be determined using Method 2, 2A, 2C, 2D, 2F, or 2G of appendices A-1 and A-2 to part 60 of this chapter (respectively), as appropriate.
    (5) Except as specified in paragraph (a)(6) of this section, the concentration of ethylene oxide must be determined using Method 18 of appendix A-6 to part 60 of this chapter, or Method 320 of appendix A to this part.
    (6) You may elect to use ASTM D6348-12 (Reapproved 2020) (incorporated by reference, § 63.14) in lieu of Method 320 of appendix A to this part as specified in paragraph (a)(5) of this section. To comply with this paragraph, annexes Al through A8 to ASTM D6348-12 (Reapproved 2020) are mandatory; the percent (%) R must be determined for each target analyte using Equation A5.5 of ASTM D6348-12 (Reapproved 2020) Annex A5 (Analyte Spiking Technique); and in order for the test data to be acceptable for a compound, the %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, then the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the following equation:
    (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(2)

  • (a) Except as specified in paragraph (a)(7) of this section, for each Group 1 and Group 2 process vent stream, owners and operators must measure the flow rate and concentration of ethylene oxide of each process vent as specified in paragraphs (a)(1) through (6) of this section.
    (1) Measurements must be made prior to any dilution of the vent streams.
    (2) Measurements may be made on the combined vent streams at a chemical manufacturing process unit or for each separate vent stream.
    (3) The sampling site shall be after the last recovery device (if any recovery devices are present) but prior to the inlet of any control device that is present and prior to release to the atmosphere. Method 1 or 1A of appendix A-1 to part 60 of this chapter, as appropriate, must be used for the selection of the sampling sites. For vents smaller than 0.10 meter in diameter, sample at one point at the center of the duct.
    (4) The gas volumetric flow rate must be determined using Method 2, 2A, 2C, 2D, 2F, or 2G of appendices A-1 and A-2 to part 60 of this chapter (respectively), as appropriate.
    (5) Except as specified in paragraph (a)(6) of this section, the concentration of ethylene oxide must be determined using Method 18 of appendix A-6 to part 60 of this chapter, or Method 320 of appendix A to this part.
    (6) You may elect to use ASTM D6348-12 (Reapproved 2020) (incorporated by reference, § 63.14) in lieu of Method 320 of appendix A to this part as specified in paragraph (a)(5) of this section. To comply with this paragraph, annexes Al through A8 to ASTM D6348-12 (Reapproved 2020) are mandatory; the percent (%) R must be determined for each target analyte using Equation A5.5 of ASTM D6348-12 (Reapproved 2020) Annex A5 (Analyte Spiking Technique); and in order for the test data to be acceptable for a compound, the %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, then the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the following equation:
    (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(3)

  • (a) Except as specified in paragraph (a)(7) of this section, for each Group 1 and Group 2 process vent stream, owners and operators must measure the flow rate and concentration of ethylene oxide of each process vent as specified in paragraphs (a)(1) through (6) of this section.
    (1) Measurements must be made prior to any dilution of the vent streams.
    (2) Measurements may be made on the combined vent streams at a chemical manufacturing process unit or for each separate vent stream.
    (3) The sampling site shall be after the last recovery device (if any recovery devices are present) but prior to the inlet of any control device that is present and prior to release to the atmosphere. Method 1 or 1A of appendix A-1 to part 60 of this chapter, as appropriate, must be used for the selection of the sampling sites. For vents smaller than 0.10 meter in diameter, sample at one point at the center of the duct.
    (4) The gas volumetric flow rate must be determined using Method 2, 2A, 2C, 2D, 2F, or 2G of appendices A-1 and A-2 to part 60 of this chapter (respectively), as appropriate.
    (5) Except as specified in paragraph (a)(6) of this section, the concentration of ethylene oxide must be determined using Method 18 of appendix A-6 to part 60 of this chapter, or Method 320 of appendix A to this part.
    (6) You may elect to use ASTM D6348-12 (Reapproved 2020) (incorporated by reference, § 63.14) in lieu of Method 320 of appendix A to this part as specified in paragraph (a)(5) of this section. To comply with this paragraph, annexes Al through A8 to ASTM D6348-12 (Reapproved 2020) are mandatory; the percent (%) R must be determined for each target analyte using Equation A5.5 of ASTM D6348-12 (Reapproved 2020) Annex A5 (Analyte Spiking Technique); and in order for the test data to be acceptable for a compound, the %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, then the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the following equation:
    (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(4)

  • (a) Except as specified in paragraph (a)(7) of this section, for each Group 1 and Group 2 process vent stream, owners and operators must measure the flow rate and concentration of ethylene oxide of each process vent as specified in paragraphs (a)(1) through (6) of this section.
    (1) Measurements must be made prior to any dilution of the vent streams.
    (2) Measurements may be made on the combined vent streams at a chemical manufacturing process unit or for each separate vent stream.
    (3) The sampling site shall be after the last recovery device (if any recovery devices are present) but prior to the inlet of any control device that is present and prior to release to the atmosphere. Method 1 or 1A of appendix A-1 to part 60 of this chapter, as appropriate, must be used for the selection of the sampling sites. For vents smaller than 0.10 meter in diameter, sample at one point at the center of the duct.
    (4) The gas volumetric flow rate must be determined using Method 2, 2A, 2C, 2D, 2F, or 2G of appendices A-1 and A-2 to part 60 of this chapter (respectively), as appropriate.
    (5) Except as specified in paragraph (a)(6) of this section, the concentration of ethylene oxide must be determined using Method 18 of appendix A-6 to part 60 of this chapter, or Method 320 of appendix A to this part.
    (6) You may elect to use ASTM D6348-12 (Reapproved 2020) (incorporated by reference, § 63.14) in lieu of Method 320 of appendix A to this part as specified in paragraph (a)(5) of this section. To comply with this paragraph, annexes Al through A8 to ASTM D6348-12 (Reapproved 2020) are mandatory; the percent (%) R must be determined for each target analyte using Equation A5.5 of ASTM D6348-12 (Reapproved 2020) Annex A5 (Analyte Spiking Technique); and in order for the test data to be acceptable for a compound, the %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, then the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the following equation:
    (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(5)

  • (a) Except as specified in paragraph (a)(7) of this section, for each Group 1 and Group 2 process vent stream, owners and operators must measure the flow rate and concentration of ethylene oxide of each process vent as specified in paragraphs (a)(1) through (6) of this section.
    (1) Measurements must be made prior to any dilution of the vent streams.
    (2) Measurements may be made on the combined vent streams at a chemical manufacturing process unit or for each separate vent stream.
    (3) The sampling site shall be after the last recovery device (if any recovery devices are present) but prior to the inlet of any control device that is present and prior to release to the atmosphere. Method 1 or 1A of appendix A-1 to part 60 of this chapter, as appropriate, must be used for the selection of the sampling sites. For vents smaller than 0.10 meter in diameter, sample at one point at the center of the duct.
    (4) The gas volumetric flow rate must be determined using Method 2, 2A, 2C, 2D, 2F, or 2G of appendices A-1 and A-2 to part 60 of this chapter (respectively), as appropriate.
    (5) Except as specified in paragraph (a)(6) of this section, the concentration of ethylene oxide must be determined using Method 18 of appendix A-6 to part 60 of this chapter, or Method 320 of appendix A to this part.
    (6) You may elect to use ASTM D6348-12 (Reapproved 2020) (incorporated by reference, § 63.14) in lieu of Method 320 of appendix A to this part as specified in paragraph (a)(5) of this section. To comply with this paragraph, annexes Al through A8 to ASTM D6348-12 (Reapproved 2020) are mandatory; the percent (%) R must be determined for each target analyte using Equation A5.5 of ASTM D6348-12 (Reapproved 2020) Annex A5 (Analyte Spiking Technique); and in order for the test data to be acceptable for a compound, the %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, then the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the following equation:
    (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(6)

  • (a) Except as specified in paragraph (a)(7) of this section, for each Group 1 and Group 2 process vent stream, owners and operators must measure the flow rate and concentration of ethylene oxide of each process vent as specified in paragraphs (a)(1) through (6) of this section.
    (1) Measurements must be made prior to any dilution of the vent streams.
    (2) Measurements may be made on the combined vent streams at a chemical manufacturing process unit or for each separate vent stream.
    (3) The sampling site shall be after the last recovery device (if any recovery devices are present) but prior to the inlet of any control device that is present and prior to release to the atmosphere. Method 1 or 1A of appendix A-1 to part 60 of this chapter, as appropriate, must be used for the selection of the sampling sites. For vents smaller than 0.10 meter in diameter, sample at one point at the center of the duct.
    (4) The gas volumetric flow rate must be determined using Method 2, 2A, 2C, 2D, 2F, or 2G of appendices A-1 and A-2 to part 60 of this chapter (respectively), as appropriate.
    (5) Except as specified in paragraph (a)(6) of this section, the concentration of ethylene oxide must be determined using Method 18 of appendix A-6 to part 60 of this chapter, or Method 320 of appendix A to this part.
    (6) You may elect to use ASTM D6348-12 (Reapproved 2020) (incorporated by reference, § 63.14) in lieu of Method 320 of appendix A to this part as specified in paragraph (a)(5) of this section. To comply with this paragraph, annexes Al through A8 to ASTM D6348-12 (Reapproved 2020) are mandatory; the percent (%) R must be determined for each target analyte using Equation A5.5 of ASTM D6348-12 (Reapproved 2020) Annex A5 (Analyte Spiking Technique); and in order for the test data to be acceptable for a compound, the %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, then the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the following equation:
    (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (ii) Conduct the performance test according to the procedures in § 63.116(c). Except as specified in § 63.109(a)(6), use Method 18 of appendix A-6 to part 60 of this chapter or Method 320 of appendix A to this part to determine the ethylene oxide concentration. Use Method 1 or 1A of appendix A-1 to part 60 of this chapter to select the sampling sites at each sampling location. Determine the gas volumetric flowrate using Method 2, 2A, 2C, or 2D of appendix A-2 to part 60 of this chapter. Use Method 4 of appendix A-3 to part 60 of this chapter convert the volumetric flowrate to a dry basis.
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(7)(i)

  • (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(7)(ii)

  • (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(7)(iii)

  • (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and
  • (6) For paragraphs (1) through (5) of this definition, the following sentence in § 63.109 does not apply: “This section applies beginning no later than the compliance dates specified in § 63.100(k)(11).” Instead, § 63.109 applies beginning no later than the compliance dates specified in § 63.1422(h). Also, an owner or operator of an existing source is not required to comply with § 63.109(a)(1) through (6) for an initial measurement or initial performance test if a previously conducted measurement or performance test was completed on or after March 18, 2021 and the requirements specified in § 63.109(a)(7)(i) through (iii) are met.
    In organic hazardous air pollutant service or in organic HAP service means that a piece of equipment or heat exchange system either contains or contacts a fluid (liquid or gas) that is at least 5 percent by weight of total organic HAP (as defined in this section), as determined according to the provisions of § 63.180(d). The provisions of § 63.180(d) also specify how to determine that a piece of equipment is not in organic HAP service. For purposes of the definition of “heat exchange system,” the term “equipment” in § 63.180(d) includes heat exchange systems. Beginning March 18, 2029, any piece of equipment or heat exchange system that is in ethylene oxide service is also in organic HAP service.
    Initial start-up means the first time a new or reconstructed affected source begins production, or, for equipment added or changed as described in § 63.1420(g), the first time the equipment is put into operation to produce a polyether polyol. Initial start-up does not include operation solely for testing equipment. Initial start-up does not include subsequent start-ups of an affected source or portion thereof following malfunctions or shutdowns or following changes in product for flexible operation units. Further, for purposes of § 63.1422, initial start-up does not include subsequent start-ups of affected sources or portions thereof following malfunctions or process unit shutdowns.
    Maintenance wastewater is defined in § 63.101, except that the term “polyether polyol manufacturing process unit” shall apply whenever the term “chemical manufacturing process unit” is used. Further, the generation of wastewater from the routine rinsing or washing of equipment in batch operation between batches is not maintenance wastewater, but is considered to be process wastewater, for the purposes of this subpart.
    Make or modify the product means to produce the polyether polyol by polymerization of epoxides or other cyclic ethers with compounds having one or more reactive hydrogens, and to incorporate additives (e.g., preservatives, antioxidants, or diluents) in order to maintain the quality of the finished products before shipping. Making and modifying the product for this regulation does not include grafting, polymerizing the polyol, or reacting it with compounds other than EO or PO.
    Maximum true vapor pressure is defined in § 63.101, except before March 18, 2029, the terms “transfer” and “transferred” do not apply for the purposes of this subpart. On and after March 18, 2029, the terms “transfer” and “transferred” do apply for the purposes of this subpart.
    New process unit means a process unit for which the construction or reconstruction commenced after September 4, 1997.
    On-site or on site means, with respect to records required to be maintained by this subpart or required by another subpart referenced by this subpart, a location within the plant site where the affected source is located. On-site storage of records includes, but is not limited to, a location at the affected source or PMPU to which the records pertain or a location elsewhere at the plant site where the affected source is located.
    Operating day refers to the 24-hour period defined by the owner or operator in the Notification of Compliance Status required by § 63.1439(e)(5). That 24-hour period may be from midnight to midnight or another 24-hour period. The operating day is the 24-hour period for which daily average monitoring values are determined.
    Organic hazardous air pollutant(s) (organic HAP) means one or more of the chemicals listed in table 4 of this subpart, or any other chemical which:

Citations to §63.109(a)(7)(iv)

  • (7) The requirements specified in paragraphs (a)(1) through (6) of this section for an initial measurement or initial performance test do not apply if the conditions specified in paragraphs (a)(7)(i) through (iv) of this section are met for a previously conducted measurement or performance test.
    (i) No changes have been made to the process since the time of the measurement or performance test;
    (ii) The operating conditions and test methods used during measurement or performance test conform to the ethylene oxide related requirements of this subpart;
    (iii) The control device and process parameter values established during the previously conducted measurement or performance test are used to demonstrate continuous compliance with the ethylene oxide related requirements of this subpart; and

Citations to §63.109(b)

Citations to §63.109(b)(1)

  • (i) The owner or operator shall submit a standard operating procedure for obtaining the liquid sample, along with the test method used to determine the epoxide concentration. This information shall be submitted in the Precompliance Report. For ethylene oxide, the test method must be as described in § 63.109(b)(1) or another alternative approved by the Administrator in accordance with § 63.7(f).

Citations to §63.109(c)

Citations to §63.109(c)(1)

  • (c) For equipment leaks, owners and operators must comply with the requirements in paragraphs (c)(1) through (4) of this section.
    (1) Each piece of equipment within a chemical manufacturing process unit that can reasonably be expected to contain equipment in ethylene oxide service is presumed to be in ethylene oxide service unless the owner or operator demonstrates that the piece of equipment is not in ethylene oxide service. For a piece of equipment to be considered not in ethylene oxide service, it must be determined that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment can be reasonably expected to not exceed 0.1 percent by weight on an annual average basis. For purposes of determining the percent ethylene oxide content of the process fluid, owners and operators must use Method 18 of appendix A-6 to part 60 of this chapter, for gaseous process fluid, and Method 624.1 of appendix A to part 136 of this chapter, or preparation by Method SW-846-5031 and analysis by Method SW-846-8260D (both incorporated by reference, see § 63.14) for liquid process fluid. In lieu of preparation by Method SW-846-5031, owners and operators may use Method SW-846-5030B (incorporated by reference, see § 63.14), as long as: the owner or operator does not use a preservative in the collected sample; the owner or operator stores the sample with minimal headspace as cold as possible and at least below 4 degrees C; and the owner or operator analyzes the sample as soon as possible, but in no case longer than 7 days from the time the sample was collected.
    (2) Unless specified by the Administrator, owners and operators may use good engineering judgment rather than the procedures specified in paragraph (c)(1) of this section to determine that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment does not exceed 0.1 percent by weight.
    (3) Owners and operators may revise a determination for whether a piece of equipment is in ethylene oxide service by following the procedures in paragraph (c)(1) of this section, or by documenting that a change in the process or raw materials no longer causes the equipment to be in ethylene oxide service.
    (4) Samples used in determining the ethylene oxide content must be representative of the process fluid that is contained in or contacts the equipment.

Citations to §63.109(c)(2)

  • (c) For equipment leaks, owners and operators must comply with the requirements in paragraphs (c)(1) through (4) of this section.
    (1) Each piece of equipment within a chemical manufacturing process unit that can reasonably be expected to contain equipment in ethylene oxide service is presumed to be in ethylene oxide service unless the owner or operator demonstrates that the piece of equipment is not in ethylene oxide service. For a piece of equipment to be considered not in ethylene oxide service, it must be determined that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment can be reasonably expected to not exceed 0.1 percent by weight on an annual average basis. For purposes of determining the percent ethylene oxide content of the process fluid, owners and operators must use Method 18 of appendix A-6 to part 60 of this chapter, for gaseous process fluid, and Method 624.1 of appendix A to part 136 of this chapter, or preparation by Method SW-846-5031 and analysis by Method SW-846-8260D (both incorporated by reference, see § 63.14) for liquid process fluid. In lieu of preparation by Method SW-846-5031, owners and operators may use Method SW-846-5030B (incorporated by reference, see § 63.14), as long as: the owner or operator does not use a preservative in the collected sample; the owner or operator stores the sample with minimal headspace as cold as possible and at least below 4 degrees C; and the owner or operator analyzes the sample as soon as possible, but in no case longer than 7 days from the time the sample was collected.
    (2) Unless specified by the Administrator, owners and operators may use good engineering judgment rather than the procedures specified in paragraph (c)(1) of this section to determine that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment does not exceed 0.1 percent by weight.
    (3) Owners and operators may revise a determination for whether a piece of equipment is in ethylene oxide service by following the procedures in paragraph (c)(1) of this section, or by documenting that a change in the process or raw materials no longer causes the equipment to be in ethylene oxide service.
    (4) Samples used in determining the ethylene oxide content must be representative of the process fluid that is contained in or contacts the equipment.

Citations to §63.109(c)(3)

  • (c) For equipment leaks, owners and operators must comply with the requirements in paragraphs (c)(1) through (4) of this section.
    (1) Each piece of equipment within a chemical manufacturing process unit that can reasonably be expected to contain equipment in ethylene oxide service is presumed to be in ethylene oxide service unless the owner or operator demonstrates that the piece of equipment is not in ethylene oxide service. For a piece of equipment to be considered not in ethylene oxide service, it must be determined that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment can be reasonably expected to not exceed 0.1 percent by weight on an annual average basis. For purposes of determining the percent ethylene oxide content of the process fluid, owners and operators must use Method 18 of appendix A-6 to part 60 of this chapter, for gaseous process fluid, and Method 624.1 of appendix A to part 136 of this chapter, or preparation by Method SW-846-5031 and analysis by Method SW-846-8260D (both incorporated by reference, see § 63.14) for liquid process fluid. In lieu of preparation by Method SW-846-5031, owners and operators may use Method SW-846-5030B (incorporated by reference, see § 63.14), as long as: the owner or operator does not use a preservative in the collected sample; the owner or operator stores the sample with minimal headspace as cold as possible and at least below 4 degrees C; and the owner or operator analyzes the sample as soon as possible, but in no case longer than 7 days from the time the sample was collected.
    (2) Unless specified by the Administrator, owners and operators may use good engineering judgment rather than the procedures specified in paragraph (c)(1) of this section to determine that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment does not exceed 0.1 percent by weight.
    (3) Owners and operators may revise a determination for whether a piece of equipment is in ethylene oxide service by following the procedures in paragraph (c)(1) of this section, or by documenting that a change in the process or raw materials no longer causes the equipment to be in ethylene oxide service.
    (4) Samples used in determining the ethylene oxide content must be representative of the process fluid that is contained in or contacts the equipment.

Citations to §63.109(c)(4)

  • (c) For equipment leaks, owners and operators must comply with the requirements in paragraphs (c)(1) through (4) of this section.
    (1) Each piece of equipment within a chemical manufacturing process unit that can reasonably be expected to contain equipment in ethylene oxide service is presumed to be in ethylene oxide service unless the owner or operator demonstrates that the piece of equipment is not in ethylene oxide service. For a piece of equipment to be considered not in ethylene oxide service, it must be determined that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment can be reasonably expected to not exceed 0.1 percent by weight on an annual average basis. For purposes of determining the percent ethylene oxide content of the process fluid, owners and operators must use Method 18 of appendix A-6 to part 60 of this chapter, for gaseous process fluid, and Method 624.1 of appendix A to part 136 of this chapter, or preparation by Method SW-846-5031 and analysis by Method SW-846-8260D (both incorporated by reference, see § 63.14) for liquid process fluid. In lieu of preparation by Method SW-846-5031, owners and operators may use Method SW-846-5030B (incorporated by reference, see § 63.14), as long as: the owner or operator does not use a preservative in the collected sample; the owner or operator stores the sample with minimal headspace as cold as possible and at least below 4 degrees C; and the owner or operator analyzes the sample as soon as possible, but in no case longer than 7 days from the time the sample was collected.
    (2) Unless specified by the Administrator, owners and operators may use good engineering judgment rather than the procedures specified in paragraph (c)(1) of this section to determine that the percent ethylene oxide content of the process fluid that is contained in or contacts equipment does not exceed 0.1 percent by weight.
    (3) Owners and operators may revise a determination for whether a piece of equipment is in ethylene oxide service by following the procedures in paragraph (c)(1) of this section, or by documenting that a change in the process or raw materials no longer causes the equipment to be in ethylene oxide service.
    (4) Samples used in determining the ethylene oxide content must be representative of the process fluid that is contained in or contacts the equipment.

Citations to §63.109(d)

Citations to §63.109(e)