§63.1039. Reporting requirements. — Inbound Citations
40 C.F.R. § 63.1039
Statutory Authority
Cited by 41 regulations in release Current.
Citations to 40 U.S.C. § 63.1039 as a whole
-
(1) Any connector that is inaccessible or that is ceramic or ceramic-lined (e.g., porcelain, glass, or glass-lined), is exempt from the monitoring requirements of paragraphs (a) and (b) of this section, from the leak repair requirements of paragraph (d) of this section, and from the recordkeeping and reporting requirements of §§ 63.1038 and 63.1039. An inaccessible connector is one that meets any of the provisions specified in paragraphs (f)(1)(i) through (vi) of this section, as applicable:(i) Buried;(ii) Insulated in a manner that prevents access to the connector by a monitor probe;(iii) Obstructed by equipment or piping that prevents access to the connector by a monitor probe;(iv) Unable to be reached from a wheeled scissor-lift or hydraulic-type scaffold that would allow access to connectors up to 7.6 meters (25 feet) above the ground;(v) Inaccessible because it would require elevating the monitoring personnel more than 2 meters (7 feet) above a permanent support surface or would require the erection of scaffold; or(vi) Unsafe access includes, but is not limited to, the use of a wheeled scissor-lift on unstable or uneven terrain, the use of a motorized man-lift basket in areas where an ignition potential exists, or access would require near proximity to hazards such as electrical lines, or would risk damage to equipment.
-
(i) Any connector that is inaccessible or that is ceramic or ceramic-lined (e.g., porcelain, glass, or glass-lined), is exempt from the monitoring requirements of paragraphs (a) and (b) of this section, from the leak repair requirements of paragraph (d) of this section, and from the recordkeeping and reporting requirements of §§ 63.1038 and 63.1039. An inaccessible connector is one that meets any of the provisions specified in paragraphs (e)(2)(i)(A) through (e)(2)(i)(F) of this section, as applicable.(A) Buried;(B) Insulated in a manner that prevents access to the connector by a monitor probe;(C) Obstructed by equipment or piping that prevents access to the connector by a monitor probe;(D) Unable to be reached from a wheeled scissor-lift or hydraulic-type scaffold that would allow access to connectors up to 7.6 meters (25 feet) above the ground.(E) Inaccessible because it would require elevating the monitoring personnel more than 2 meters (7 feet) above a permanent support surface or would require the erection of scaffold;(F) Unsafe access includes, but is not limited to, the use of a wheeled scissor-lift on unstable or uneven terrain, the use of a motorized man-lift basket in areas where an ignition potential exists, or access would require near proximity to hazards such as electrical lines, or would risk damage to equipment.
-
(a) You must comply with §§ 63.1020 through 63.1025, 63.1027, 63.1029 through 63.1032, and 63.1034 through 63.1039 of subpart UU of this part.
-
(c) If you control equipment leaks according to the requirements under § 63.7920(b)(2), you must demonstrate continuous compliance by inspecting, monitoring, repairing, and maintaining records according to the requirements in §§ 63.1021 through 63.1039 that apply to your affected equipment.
Citations to §63.1039(a)
-
(2) You must include the information specified in § 63.1039(a) for equipment leaks.
-
(1) You have included the information required in § 63.1039(a) in your notification of compliance status report.
Citations to §63.1039(a)(1)
-
(a) Each owner or operator shall submit an Initial Compliance Status Report according to the procedures in the referencing subpart. The notification shall include the information listed in paragraphs (a)(1) through (a)(3) of this section, as applicable.(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).(2) The notification shall provide the information listed in paragraphs (a)(2)(i) and (a)(2)(ii) of this section for each process unit or affected facility subject to the requirements of § 63.1036(b).(i) Batch products or product codes subject to the provisions of this subpart, and(ii) Planned schedule for pressure testing when equipment is configured for production of products subject to the provisions of this subpart.(3) The notification shall provide the information listed in paragraphs (a)(3)(i) and (a)(3)(ii) of this section for each process unit or affected facility subject to the requirements in § 63.1037.(ii) A description of the system used to create a negative pressure in the enclosure and the control device used to comply with the requirements of § 63.1034 of this part.
-
(vi) The applicable information specified in § 63.1039(a)(1) through (3) for all pumps and valves subject to the work practice standards for equipment leak components in Table 4 to this subpart, item 4.
-
(vii) The information specified in § 63.1039(a)(1) through (3) for each process subject to the work practice standards for equipment leaks in Table 6 to this subpart.
Citations to §63.1039(a)(1)(i)
-
(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).
Citations to §63.1039(a)(1)(ii)
-
(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).
Citations to §63.1039(a)(1)(iii)
-
(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).
Citations to §63.1039(a)(1)(iv)
-
(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).
Citations to §63.1039(a)(2)
-
(a) Each owner or operator shall submit an Initial Compliance Status Report according to the procedures in the referencing subpart. The notification shall include the information listed in paragraphs (a)(1) through (a)(3) of this section, as applicable.(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).(2) The notification shall provide the information listed in paragraphs (a)(2)(i) and (a)(2)(ii) of this section for each process unit or affected facility subject to the requirements of § 63.1036(b).(i) Batch products or product codes subject to the provisions of this subpart, and(ii) Planned schedule for pressure testing when equipment is configured for production of products subject to the provisions of this subpart.(3) The notification shall provide the information listed in paragraphs (a)(3)(i) and (a)(3)(ii) of this section for each process unit or affected facility subject to the requirements in § 63.1037.(ii) A description of the system used to create a negative pressure in the enclosure and the control device used to comply with the requirements of § 63.1034 of this part.
-
(vi) The applicable information specified in § 63.1039(a)(1) through (3) for all pumps and valves subject to the work practice standards for equipment leak components in Table 4 to this subpart, item 4.
-
(vii) The information specified in § 63.1039(a)(1) through (3) for each process subject to the work practice standards for equipment leaks in Table 6 to this subpart.
Citations to §63.1039(a)(3)
-
(a) Each owner or operator shall submit an Initial Compliance Status Report according to the procedures in the referencing subpart. The notification shall include the information listed in paragraphs (a)(1) through (a)(3) of this section, as applicable.(1) The notification shall provide the information listed in paragraphs (a)(1)(i) through (a)(1)(iv) of this section for each process unit or affected facility subject to the requirements of this subpart.(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service.(iii) Method of compliance with the standard (e.g., “monthly leak detection and repair” or “equipped with dual mechanical seals”).(2) The notification shall provide the information listed in paragraphs (a)(2)(i) and (a)(2)(ii) of this section for each process unit or affected facility subject to the requirements of § 63.1036(b).(i) Batch products or product codes subject to the provisions of this subpart, and(ii) Planned schedule for pressure testing when equipment is configured for production of products subject to the provisions of this subpart.(3) The notification shall provide the information listed in paragraphs (a)(3)(i) and (a)(3)(ii) of this section for each process unit or affected facility subject to the requirements in § 63.1037.(ii) A description of the system used to create a negative pressure in the enclosure and the control device used to comply with the requirements of § 63.1034 of this part.
-
(vi) The applicable information specified in § 63.1039(a)(1) through (3) for all pumps and valves subject to the work practice standards for equipment leak components in Table 4 to this subpart, item 4.
-
(vii) The information specified in § 63.1039(a)(1) through (3) for each process subject to the work practice standards for equipment leaks in Table 6 to this subpart.
Citations to §63.1039(b)
-
(f) For owners or operators electing to meet the requirements of paragraph (b) of this section, the Periodic Report to be filed pursuant to § 63.1039(b) shall include the information listed in paragraphs (f)(1) through (f)(4) of this section for each process unit.(1) Batch product process equipment train identification;(2) The number of pressure tests conducted;(3) The number of pressure tests where the equipment train failed the pressure test; and
-
(2) You must include the information specified in § 63.1039(b) for equipment leaks, except for releases from pressure relief devices. For any releases from pressure relief devices, you must submit the report specified in paragraph (c)(7) of this section instead of the information specified in § 63.1039(b)(4) of subpart UU of this part.
-
(9) You must include the information on equipment leaks required in periodic reports by § 63.1018(a) or § 63.1039(b).
Citations to §63.1039(b)(1)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
Citations to §63.1039(b)(1)(i)
-
(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).
Citations to §63.1039(b)(1)(ii)
-
(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).
Citations to §63.1039(b)(1)(iii)
-
(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).
Citations to §63.1039(b)(1)(iv)
-
(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).
Citations to §63.1039(b)(1)(v)
-
(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).
Citations to §63.1039(b)(2)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
Citations to §63.1039(b)(3)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
Citations to §63.1039(b)(4)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
-
(2) You must include the information specified in § 63.1039(b) for equipment leaks, except for releases from pressure relief devices. For any releases from pressure relief devices, you must submit the report specified in paragraph (c)(7) of this section instead of the information specified in § 63.1039(b)(4) of subpart UU of this part.
-
(xiii) The information in § 63.1030(b) required to be reported under § 63.1039(b)(4) is now required to be reported under § 63.2520(e)(15)(i) and (ii).
Citations to §63.1039(b)(5)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
-
(1) You must include a copy of the inspection record specified in § 63.11990(b)(2) for each storage vessel when a defect, failure, or leak is detected. You must also include a copy of the applicable information specified in § 63.1039(b)(5) through (8) of subpart UU of this part for each pressure vessel.
Citations to §63.1039(b)(6)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
-
(1) You must include a copy of the inspection record specified in § 63.11990(b)(2) for each storage vessel when a defect, failure, or leak is detected. You must also include a copy of the applicable information specified in § 63.1039(b)(5) through (8) of subpart UU of this part for each pressure vessel.
Citations to §63.1039(b)(7)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
-
(1) You must include a copy of the inspection record specified in § 63.11990(b)(2) for each storage vessel when a defect, failure, or leak is detected. You must also include a copy of the applicable information specified in § 63.1039(b)(5) through (8) of subpart UU of this part for each pressure vessel.
Citations to §63.1039(b)(8)
-
(b) The owner or operator shall report the information specified in paragraphs (b)(1) through (b)(8) of this section, as applicable, in the Periodic Report specified in the referencing subpart.(1) For the equipment specified in paragraphs (b)(1)(i) through (b)(1)(v) of this section, report in a summary format by equipment type, the number of components for which leaks were detected and for valves, pumps and connectors show the percent leakers, and the total number of components monitored. Also include the number of leaking components that were not repaired as required by § 63.1024, and for valves and connectors, identify the number of components that are determined by § 63.1025(c)(3) to be nonrepairable.(i) Valves in gas and vapor service and in light liquid service pursuant to § 63.1025(b) and (c).(ii) Pumps in light liquid service pursuant to § 63.1026(b) and (c).(iii) Connectors in gas and vapor service and in light liquid service pursuant to § 63.1027(b) and (c).(iv) Agitators in gas and vapor service and in light liquid service pursuant to § 63.1028(c).(v) Compressors pursuant to § 63.1031(d).(2) Where any delay of repair is utilized pursuant to § 63.1024(d), report that delay of repair has occurred and report the number of instances of delay of repair.(3) If applicable, report the valve subgrouping information specified in § 63.1025(b)(4)(iv).(4) For pressure relief devices in gas and vapor service pursuant to § 63.1030(b) and for compressors pursuant to § 63.1031(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to § 63.1025(b)(3)(i).(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to § 63.1035.(7) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in § 63.1036(f).(8) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units or affected facilities with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
-
(1) You must include a copy of the inspection record specified in § 63.11990(b)(2) for each storage vessel when a defect, failure, or leak is detected. You must also include a copy of the applicable information specified in § 63.1039(b)(5) through (8) of subpart UU of this part for each pressure vessel.