§61.136. Compliance provisions and alternative means of emission limitation. — Inbound Citations
40 C.F.R. § 61.136
Statutory Authority
Cited by 2 regulations in release Current.
Citations to §61.136(d)
-
(d) Authorities that will not be delegated to States: § 61.136(d).
-
(d) Each exhauster shall be monitored quarterly to detect leaks by the methods specified in § 61.245(b) except as provided in § 61.136(d) and paragraphs (e)-(g) of this section.(1) If an instrument reading of 10,000 ppm or greater is measured, a leak is detected.(2) When a leak is detected, it shall be repaired as soon as practicable, but no later than 15 calendar days after it is detected, except as provided in § 61.242-10 (a) and (b). A first attempt at repair shall be made no later than 5 calendar days after each leak is detected.