US Codex
C.F.R.
Browse by date
Notes

§60.705. Reporting and recordkeeping requirements. — Inbound Citations

40 C.F.R. § 60.705

Cited by 24 regulations in release Current.

Citations to 40 C.F.R. § 60.705 as a whole

Citations to §60.705(b)(4)

  • As used in this subpart, all terms not defined here shall have the meaning given them in the Act and in subpart A of part 60, and the following terms shall have the specific meanings given them.
  • (iv) As an alternative to § 60.705(b)(4) (i), (ii) or (iii), the concentration level or reading indicated by the organics monitoring device at the outlet of the absorber, condenser, or carbon adsorber, measured at least every 15 minutes and averaged over the same time period of the performance testing while the vent stream is normally routed and constituted.

Citations to §60.705(f)(4)

Citations to §60.705(i)

  • (3) Each affected facility in a process unit with a total design capacity for all chemicals produced within that unit of less than 1 gigagram per year (1,100 tons per year) is exempt from all provisions of this subpart except for the recordkeeping and reporting requirements in § 60.705 (i), (l)(5), and (n).

Citations to §60.705(j)

  • (8) Each affected facility operated with a concentration of total organic compounds (TOC) (less methane and ethane) in the vent stream less than 300 ppmv as measured by Method 18 of appendix A-6 to this part or ASTM D6420-18 (incorporated by reference, see § 60.17) as specified in § 60.704(b)(4), or a concentration of TOC in the vent stream less than 150 ppmv as measured by Method 25A of appendix A-7 to this part is exempt from all provisions of this subpart except for the test method and procedure and the reporting and recordkeeping requirements in §§ 60.704(h) and 60.705(j), (l)(8), and (p).

Citations to §60.705(l)(5)

  • (3) Each affected facility in a process unit with a total design capacity for all chemicals produced within that unit of less than 1 gigagram per year (1,100 tons per year) is exempt from all provisions of this subpart except for the recordkeeping and reporting requirements in § 60.705 (i), (l)(5), and (n).

Citations to §60.705(l)(8)

  • (8) Each affected facility operated with a concentration of total organic compounds (TOC) (less methane and ethane) in the vent stream less than 300 ppmv as measured by Method 18 of appendix A-6 to this part or ASTM D6420-18 (incorporated by reference, see § 60.17) as specified in § 60.704(b)(4), or a concentration of TOC in the vent stream less than 150 ppmv as measured by Method 25A of appendix A-7 to this part is exempt from all provisions of this subpart except for the test method and procedure and the reporting and recordkeeping requirements in §§ 60.704(h) and 60.705(j), (l)(8), and (p).

Citations to §60.705(l)(n)

  • (3) Each affected facility in a process unit with a total design capacity for all chemicals produced within that unit of less than 1 gigagram per year (1,100 tons per year) is exempt from all provisions of this subpart except for the recordkeeping and reporting requirements in § 60.705 (i), (l)(5), and (n).

Citations to §60.705(l)(p)

  • (8) Each affected facility operated with a concentration of total organic compounds (TOC) (less methane and ethane) in the vent stream less than 300 ppmv as measured by Method 18 of appendix A-6 to this part or ASTM D6420-18 (incorporated by reference, see § 60.17) as specified in § 60.704(b)(4), or a concentration of TOC in the vent stream less than 150 ppmv as measured by Method 25A of appendix A-7 to this part is exempt from all provisions of this subpart except for the test method and procedure and the reporting and recordkeeping requirements in §§ 60.704(h) and 60.705(j), (l)(8), and (p).

Citations to §60.705(r)

Citations to §60.705(v)(1)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(v)(2)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(v)(3)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(v)(4)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(v)(5)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(v)(6)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(v)(7)

  • (v) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (v)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.705(w)(1)

  • (w) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, owners and operators must meet the requirements outlined in paragraphs (w)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.705(w)(2)

  • (w) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, owners and operators must meet the requirements outlined in paragraphs (w)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.705(w)(3)

  • (w) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, owners and operators must meet the requirements outlined in paragraphs (w)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.705(w)(4)

  • (w) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, owners and operators must meet the requirements outlined in paragraphs (w)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.705(w)(5)

  • (w) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, owners and operators must meet the requirements outlined in paragraphs (w)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.