US Codex
C.F.R.
Browse by date
Notes

§60.6540. May I conduct continuous monitoring or sampling in lieu of stack testing? — Inbound Citations

40 C.F.R. § 60.6540

Cited by 37 regulations in release Current.

Citations to 40 U.S.C. § 60.6540 as a whole

Citations to §60.6540(c)(1)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(2)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(3)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(4)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(4)(i)

  • (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(c)(4)(ii)

  • (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(c)(4)(iii)

  • (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(c)(5)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(5)(i)(A)

  • (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and

Citations to §60.6540(c)(5)(i)(B)

  • (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and

Citations to §60.6540(c)(5)(i)(C)

  • (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and

Citations to §60.6540(c)(5)(i)(D)

  • (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and

Citations to §60.6540(c)(5)(i)(E)

  • (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and

Citations to §60.6540(c)(5)(i)(F)

  • (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and

Citations to §60.6540(c)(6)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(7)

  • (c) If you elect to install, calibrate, maintain, and operate a continuous emission monitoring system for cadmium, lead, mercury, or hydrogen chloride, develop and submit for approval by EPA, a site-specific mercury, cadmium, lead, or hydrogen chloride monitoring plan that addresses the elements and requirements in paragraphs (c)(1) through (7) of this section.
    (1) Installation of the continuous emission monitoring system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analyzer, and the data collection and reduction system.
    (3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).
    (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous emission monitoring systems as described in paragraphs (c)(5)(i) and (ii) of this section.
    (i) You must develop and, upon request, submit to EPA for approval a site-specific performance evaluation test plan for the continuous emission monitoring system performance evaluation required under paragraph (c)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (c)(5)(i)(A) through (c)(5)(i)(F) of this section.
    (A) Initial and any subsequent calibration of the continuous emission monitoring system;
    (B) Determination and adjustment of the calibration drift of the continuous emission monitoring system;
    (C) Preventive maintenance of the continuous emission monitoring system, including spare parts inventory;
    (D) Data recording, calculations, and reporting;
    (E) Accuracy audit procedures, including sampling and analysis methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program must include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous emission monitoring system performance, for example, plans for relative accuracy testing using the appropriate reference method in § 60.6475(c). The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous emission monitoring system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous emission monitoring system in continuous operation according to the site-specific monitoring plan and procedures 5 and 6 of appendix F of this part.

Citations to §60.6540(c)(iii)

  • (4) Provisions for periods when the continuous emission monitoring system is out of control, including the requirements described in paragraphs (c)(4)(i) through (iii) of this section:
    (i) A continuous emission monitoring system is out of control if either of the following conditions are met: the zero (low-level), mid-level (if applicable), or high-level calibration drift exceeds two times the applicable calibration drift specification in the applicable performance specification or in the relevant standard; or the continuous emission monitoring system fails a performance test audit (e.g., cylinder gas audit), relative accuracy audit, relative accuracy test audit, or linearity test audit.
    (ii) When the continuous emission monitoring system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The beginning of the out-of-control period is the hour you conduct a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established under this part. The end of the out-of-control period is the hour following the completion of corrective action and your successful demonstration that the system is within the allowable limits. You may not use recorded data from the period the continuous emission monitoring system is out of control in data averages and calculations or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous emission monitoring system, including start and end dates and hours and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(h)(1)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.

Citations to §60.6540(h)(2)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.

Citations to §60.6540(h)(3)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.

Citations to §60.6540(h)(4)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.

Citations to §60.6540(h)(4)(i)

  • (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(h)(4)(ii)

  • (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(h)(4)(iii)

  • (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).

Citations to §60.6540(h)(5)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.

Citations to §60.6540(h)(5)(i)(A)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(5)(i)(B)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(5)(i)(C)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(5)(i)(D)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(5)(i)(E)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(5)(i)(F)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(5)(i)(G)

  • (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and

Citations to §60.6540(h)(6)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.

Citations to §60.6540(h)(7)

  • (h) If you elect to install, calibrate, maintain, and operate a continuous automated sampling system for dioxins/furans or mercury, develop and submit for approval by EPA a site-specific monitoring plan that has sufficient detail to assure the validity of the continuous automated sampling system data and that addresses the elements and requirements in paragraphs (h)(1) through (7) of this section.
    (1) Installation of the continuous automated sampling system sampling probe or other interface at a measurement location relative to each municipal waste combustor such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).
    (2) Performance and equipment specifications for the sample interface, the pollutant concentration analytical method, and the data collection system.
    (4) Provisions for periods when the continuous automated sampling system is malfunctioning or is out of control, including the requirements described in paragraphs (h)(4)(i) through (iii) of this section.
    (i) The site-specific monitoring plan must identify criteria for determining that the continuous automated sampling system is out of control, including periods when the sampling system is not collecting a representative sample or is malfunctioning, or when the analytical method does not meet site-specific quality criteria established in paragraph (h)(5) of this section.
    (ii) When the continuous automated sampling system is out of control, take corrective action and repeat all necessary tests that indicate that the system is out of control until the performance requirements are within the applicable limits. The out-of-control period includes all hours that the sampling system was not collecting a representative sample or was malfunctioning, or hours represented by a sample for which the analysis did not meet the relevant quality criteria. You may not use emissions data from the period the continuous automated sampling system is out-of-control period to determine compliance with the emission limits or to meet any data availability requirements.
    (iii) You must submit all information concerning out-of-control periods for your continuous automated sampling system, including start and end dates and hours, estimates of emissions during the out-of-control period and the basis of the estimate, and descriptions of corrective actions taken, in the annual or semiannual compliance reports required in § 60.6645(d).
    (5) Ongoing data quality assurance procedures for continuous automated sampling systems as described in paragraphs (h)(5)(i) and (ii) of this section.
    (i) You must develop and submit to EPA for approval, upon request, a site-specific performance evaluation test plan for the continuous automated sampling system performance evaluation required in paragraph (h)(5)(ii) of this section. In addition, each quality control program shall include, at a minimum, a written protocol that describes procedures for each of the operations described in paragraphs (h)(5)(i)(A) through (G) of this section.
    (A) Correct placement, installation of the continuous automated sampling system such that the system is collecting a representative sample of gas;
    (B) Initial and subsequent calibration of flow such that the sample collection rate of the continuous automated sampling system is known and verifiable;
    (C) Procedures to assure representative (e.g., proportional or isokinetic) sampling;
    (D) Preventive maintenance of the continuous automated sampling system, including spare parts inventory and procedures for cleaning equipment, replacing sample collection media, or other servicing at the end of each sample collection period;
    (E) Data recording and reporting, including an automated indicator and recording device to show when the continuous automated monitoring system is operating and collecting data and when it is not collecting data;
    (F) Accuracy audit procedures for analytical methods; and
    (ii) Your performance evaluation test plan must include the evaluation program objectives, an evaluation program summary, the performance evaluation schedule, data quality objectives, and both an internal and external quality assurance program. Data quality objectives are the pre-evaluation expectations of precision, accuracy, and completeness of data. The internal quality assurance program shall include, at a minimum, the activities planned by routine operators and analysts to provide an assessment of continuous automated sampling system performance, for example, plans for relative accuracy testing using the appropriate reference method in paragraph (h)(3) of this section, and an assessment of quality of analysis results. The external quality assurance program shall include, at a minimum, systems audits that include the opportunity for on-site evaluation by the Administrator of instrument calibration, data validation, sample logging, and documentation of quality control data and field maintenance activities.
    (6) You must conduct a performance evaluation of each continuous automated sampling system in accordance with the site-specific monitoring plan.
    (7) You must operate and maintain the continuous automated sampling system in continuous operation according to the site-specific monitoring plan.