§60.615. Reporting and recordkeeping requirements. — Inbound Citations

40 C.F.R. § 60.615

Cited by 29 regulations in release Current.

Citations to 40 C.F.R. § 60.615 as a whole

Citations to §60.615(b)(2)(i)

  • (b) Each owner or operator subject to the provisions of this subpart shall keep up-to-date, readily accessible records of the following data measured during each performance test, and also include the following data in the report of the initial performance test required under § 60.8. Where a boiler or process heater with a design heat input capacity of 44 MW (150 million Btu/hour) or greater is used to comply with § 60.612(a), a report containing performance test data need not be submitted, but a report containing the information of § 60.615(b)(2)(i) is required. The same data specified in this section shall be submitted in the reports of all subsequently required performance tests where either the emission control efficiency of a control device, outlet concentration of TOC, or the TRE index value of a vent stream from a recovery system is determined. Beginning on July 15, 2024, owners and operators must submit the performance test report following the procedures specified in paragraph (m) of this section. Data collected using test methods that are supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test must be submitted in a file format generated using the EPA's ERT. Alternatively, the owner or operator may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website. Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test must be included as an attachment in the ERT or an alternate electronic file.
    (1) Where an owner or operator subject to this subpart seeks to demonstrate compliance with § 60.612(a) through use of either a thermal or catalytic incinerator:
    (i) The average firebox temperature of the incinerator (or the average temperature upstream and downstream of the catalyst bed for a catalytic incinerator), measured at least every 15 minutes and averaged over the same time period of the performance testing, and
    (ii) The percent reduction of TOC determined as specified in § 60.614(b) achieved by the incinerator, or the concentration of TOC (ppmv, by compound) determined as specified in § 60.614(b) at the outlet of the control device on a dry basis corrected to 3 percent oxygen.
    (2) Where an owner or operator subject to the provisions of this subpart seeks to demonstrate compliance with § 60.612(a) through use of a boiler or process heater:
    (i) A description of the location at which the vent stream is introduced into the boiler or process heater, and
    (ii) The average combustion temperature of the boiler or process heater with a design heat input capacity of less than 44 MW (150 million Btu/hr) measured at least every 15 minutes and averaged over the same time period of the performance testing.
    (3) Where an owner or operator subject to the provisions of this subpart seeks to comply with § 60.612(b) through the use of a smokeless flare, flare design (i.e., steam-assisted, air-assisted, or nonassisted), all visible emission readings, heat content determinations, flow rate measurements, and exit velocity determinations made during the performance test, continuous records of the flare pilot flame monitoring, and records of all periods of operations during which the pilot flame is absent.
    (4) Where an owner or operator seeks to demonstrate compliance with § 60.612(c):
    (i) Where an absorber is the final recovery device in a recovery system, the exit specific gravity (or alternative parameter which is a measure of the degree of absorbing liquid saturation, if approved by the Administrator), and average exit temperature of the absorbing liquid, measured at least every 15 minutes and averaged over the same time period of the performance testing (both measured while the vent stream is normally routed and constituted), or
    (ii) Where a condenser is the final recovery device in a recovery system, the average exit (product side) temperature, measured at least every 15 minutes and average over the same time period of the performance testing while the vent stream is normally routed and constituted.
    (iii) Where a carbon adsorber is the final recovery device in a recovery system, the total steam mass flow measured at least every 15 minutes and averaged over the same time period of the performance test (full carbon bed cycle), temperature of the carbon bed after regeneration (and within 15 minutes of completion of any cooling cycle(s), and duration of the carbon bed steaming cycle (all measured while the vent stream is normally routed and constituted), or
    (iv) As an alternative to § 60.615(b)(4)(i), (ii) or (iii), the concentration level or reading indicated by the organic monitoring device at the outlet of the absorber, condenser, or carbon adsorber measured at least every 15 minutes and averaged over the same time period of the performance testing while the vent stream is normally routed and constituted.

Citations to §60.615(b)(4)

Citations to §60.615(b)(4)(i)

  • (iv) As an alternative to § 60.615(b)(4)(i), (ii) or (iii), the concentration level or reading indicated by the organic monitoring device at the outlet of the absorber, condenser, or carbon adsorber measured at least every 15 minutes and averaged over the same time period of the performance testing while the vent stream is normally routed and constituted.

Citations to §60.615(b)(4)(ii)

  • (iv) As an alternative to § 60.615(b)(4)(i), (ii) or (iii), the concentration level or reading indicated by the organic monitoring device at the outlet of the absorber, condenser, or carbon adsorber measured at least every 15 minutes and averaged over the same time period of the performance testing while the vent stream is normally routed and constituted.

Citations to §60.615(b)(4)(iii)

  • (iv) As an alternative to § 60.615(b)(4)(i), (ii) or (iii), the concentration level or reading indicated by the organic monitoring device at the outlet of the absorber, condenser, or carbon adsorber measured at least every 15 minutes and averaged over the same time period of the performance testing while the vent stream is normally routed and constituted.

Citations to §60.615(c)

Citations to §60.615(d)

Citations to §60.615(e)

Citations to §60.615(f)

Citations to §60.615(g)

Citations to §60.615(g)(4)

Citations to §60.615(h)

Citations to §60.615(j)

  • (k) The requirements of § 60.615(j) remain in force until and unless EPA, in delegating enforcement authority to a State under section 111(c) of the Act, approves reporting requirements or an alternative means of compliance surveillance adopted by such State. In that event, affected sources within the State will be relieved of the obligation to comply with § 60.615(j), provided that they comply with the requirements established by the State. The EPA will not approve a waiver of electronic reporting to the EPA in delegating enforcement authority. Thus, electronic reporting to the EPA cannot be waived, and as such, the provisions of this paragraph cannot be used to relieve owners or operators of affected facilities of the requirement to submit the electronic reports required in this section to the EPA.

Citations to §60.615(l)

Citations to §60.615(n)(1)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(n)(2)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(n)(3)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(n)(4)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(n)(5)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(n)(6)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(n)(7)

  • (n) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX may assert a claim of EPA system outage for failure to timely comply with the electronic submittal requirement. To assert a claim of EPA system outage, owners and operators must meet the requirements outlined in paragraphs (n)(1) through (7) of this section.
    (1) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (2) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.
    (3) The outage may be planned or unplanned.
    (4) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (5) The owner or operator must provide to the Administrator a written description identifying:
    (i) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (6) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (7) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.615(o)(1)

  • (o) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX, owners and operators may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (o)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.615(o)(2)

  • (o) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX, owners and operators may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (o)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.615(o)(3)

  • (o) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX, owners and operators may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (o)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.615(o)(4)

  • (o) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX, owners and operators may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (o)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.615(o)(5)

  • (o) Owners and operators required to electronically submit notifications or reports through CEDRI in the EPA's CDX, owners and operators may assert a claim of force majeure for failure to timely comply with the electronic submittal requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (o)(1) through (5) of this section.
    (1) An owner or operator may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (2) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date the owner or operator first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (3) The owner or operator must provide to the Administrator:
    (i) A written description of the force majeure event;
    (ii) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (iii) A description of measures taken or to be taken to minimize the delay in reporting; and
    (iv) The date by which the owner or operator proposes to report, or if the owner or operator has already met the reporting requirement at the time of the notification, the date the report was submitted.
    (4) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (5) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.