US Codex
C.F.R.
Browse by date
Notes

§60.5845b. What affected EGUs must I address in my State plan?

40 C.F.R. § 60.5845b

(a)
The EGUs that must be addressed by your State plan are:
(1)
Any affected EGUs that were in operation or had commenced construction on or before January 8, 2014;
(2)
Coal-fired steam generating units that commenced a modification on or before May 23, 2023.
(b)
An affected EGU is a steam generating unit that meets the relevant applicability conditions specified in paragraphs (b)(1) through (2) of this section, as applicable, except as provided in § 60.5850b.
(1)
Serves a generator capable of selling greater than 25 MW to a utility power distribution system; and
(2)
Has a base load rating (i.e., design heat input capacity) greater than 260 GJ/hr (250 MMBtu/hr) heat input of fossil fuel (either alone or in combination with any other fuel).
Notes, amendments, and revision history

Source

Source: 89 FR 40047, May 9, 2024, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 36 FR 24877, Dec. 23, 1971, unless otherwise noted.