§60.5392c. What GHG standards apply to centrifugal compressor designated facilities?
40 C.F.R. § 60.5392c
(1) Seal or part thereof supplies had been sufficiently stocked but are depleted at the time of the required repair.
(2) The required replacement seal or part must be ordered no later than 10 calendar days after the centrifugal compressor is added to the delay of repair list due to parts unavailability. The repair must be completed as soon as practicable, but no later than 30 calendar days after receipt of the replacement seal or part, unless the repair requires a compressor station shutdown. If the repair requires a compressor station shutdown, the repair must be completed in accordance with the timeframe specified in paragraph (a)(1)(iv)(A) of this section.
Notes, amendments, and revision history
Amendments
[89 FR 17043, Mar. 8, 2024, as amended at 89 FR 62920, Aug. 1, 2024]
Source
Source: 89 FR 17140, Mar. 8, 2024, unless otherwise noted.
Authority
Authority: 42 U.S.C. 7401 et seq.
Source
Source: 36 FR 24877, Dec. 23, 1971, unless otherwise noted.
Amendments
[89 FR 17043, Mar. 8, 2024, as amended at 89 FR 62920, Aug. 1, 2024]