§60.504a. Monitoring requirements. — Inbound Citations

40 C.F.R. § 60.504a

Cited by 48 regulations in release Current.

Citations to §60.504a(a)

  • (8) Monitor the temperature in the combustion zone using the continuous parameter monitoring system (CPMS) required in § 60.504a(a) and determine the operating limit for the combustion device using the following procedures:
    (ii) Using only the 5-minute periods in which liquid product is loaded into gasoline cargo tanks, determine the 1-hour average temperature for each hour of the performance test. If you do not know the previous contents of the cargo tank, you must assume liquid product loading is performed in gasoline cargo tanks such that you use all 5-minute periods in which liquid product is loaded into gasoline cargo tanks when determining the 1-hour average temperature for each hour of the performance test.
    (iii) Starting at the end of the third hour of the performance test and at the end of each successive hour, calculate the 3-hour rolling average temperature using the 1-hour average values in paragraph (c)(8)(ii) of this section. For a 6-hour test, this would result in four 3-hour averages (averages for hours 1 through 3, 2 through 4, 3 through 5, and 4 through 6).
    (iv) Set the operating limit at the lowest 3-hour average temperature determined in paragraph (c)(8)(iii) of this section. New operating limits become effective on the date that the performance test report is submitted to the U.S. Environmental Protection Agency (EPA) Compliance and Emissions Data Reporting Interface (CEDRI), per the requirements of § 60.505a(b).
  • (i) Install, operate, and maintain a CPMS to measure the combustion zone temperature according to § 60.504a(a) of this chapter and maintain the 3-hour rolling average combustion zone temperature when gasoline cargo tanks are being loaded at or above the operating limit set during the most recent performance test following the procedures specified in § 60.503a(c)(8) of this chapter. Valid operating data must exclude periods when there is no liquid product being loaded. If previous contents of the cargo tanks are known, you may also exclude periods when liquid product is loaded but no gasoline cargo tanks are being loaded provided that you excluded these periods in the determination of the combustion zone temperature operating limit according to the provisions in § 60.503a(c)(8)(ii) of this chapter.
  • (c) Except as provided in paragraph (f) of this section, each owner or operator of a bulk gasoline terminal subject to the provisions in § 63.422(b)(2) shall install, calibrate, certify, operate, and maintain a CMS as specified in § 60.504a(a) through (d) of this chapter, as applicable. You may use the limited alternative monitoring methods as specified in § 60.504a(e) of this chapter, if applicable.

Citations to §60.504a(a)(1)

  • (a) Install, operate, and maintain a CPMS for measuring the combustion zone temperature as specified in paragraphs (a)(1) through (5) of this section.
    (1) Install the temperature CPMS in the combustion (flame) zone or in the exhaust gas stream as close as practical to the combustion burners in a position that provides a representative temperature of the combustion zone of the thermal oxidation system.
    (2) The temperature CPMS must be capable of measuring temperature with an accuracy of ±1 percent over the normal range of temperatures measured.
    (3) The temperature CPMS must be capable of recording the temperature at least once every 5 minutes and calculating hourly block averages that include only those 5-minute periods in which liquid product was loaded into gasoline cargo tanks.
    (4) At least quarterly, inspect all components for integrity and all electrical connections for continuity, oxidation, and galvanic corrosion, unless the CPMS has a redundant temperature sensor.
    (5) Conduct calibration checks at least annually and conduct calibration checks following any period of more than 24 hours throughout which the temperature exceeded the manufacturer's specified maximum rated temperature or install a new temperature sensor.

Citations to §60.504a(a)(2)

  • (a) Install, operate, and maintain a CPMS for measuring the combustion zone temperature as specified in paragraphs (a)(1) through (5) of this section.
    (1) Install the temperature CPMS in the combustion (flame) zone or in the exhaust gas stream as close as practical to the combustion burners in a position that provides a representative temperature of the combustion zone of the thermal oxidation system.
    (2) The temperature CPMS must be capable of measuring temperature with an accuracy of ±1 percent over the normal range of temperatures measured.
    (3) The temperature CPMS must be capable of recording the temperature at least once every 5 minutes and calculating hourly block averages that include only those 5-minute periods in which liquid product was loaded into gasoline cargo tanks.
    (4) At least quarterly, inspect all components for integrity and all electrical connections for continuity, oxidation, and galvanic corrosion, unless the CPMS has a redundant temperature sensor.
    (5) Conduct calibration checks at least annually and conduct calibration checks following any period of more than 24 hours throughout which the temperature exceeded the manufacturer's specified maximum rated temperature or install a new temperature sensor.

Citations to §60.504a(a)(3)

  • (a) Install, operate, and maintain a CPMS for measuring the combustion zone temperature as specified in paragraphs (a)(1) through (5) of this section.
    (1) Install the temperature CPMS in the combustion (flame) zone or in the exhaust gas stream as close as practical to the combustion burners in a position that provides a representative temperature of the combustion zone of the thermal oxidation system.
    (2) The temperature CPMS must be capable of measuring temperature with an accuracy of ±1 percent over the normal range of temperatures measured.
    (3) The temperature CPMS must be capable of recording the temperature at least once every 5 minutes and calculating hourly block averages that include only those 5-minute periods in which liquid product was loaded into gasoline cargo tanks.
    (4) At least quarterly, inspect all components for integrity and all electrical connections for continuity, oxidation, and galvanic corrosion, unless the CPMS has a redundant temperature sensor.
    (5) Conduct calibration checks at least annually and conduct calibration checks following any period of more than 24 hours throughout which the temperature exceeded the manufacturer's specified maximum rated temperature or install a new temperature sensor.

Citations to §60.504a(a)(4)

  • (a) Install, operate, and maintain a CPMS for measuring the combustion zone temperature as specified in paragraphs (a)(1) through (5) of this section.
    (1) Install the temperature CPMS in the combustion (flame) zone or in the exhaust gas stream as close as practical to the combustion burners in a position that provides a representative temperature of the combustion zone of the thermal oxidation system.
    (2) The temperature CPMS must be capable of measuring temperature with an accuracy of ±1 percent over the normal range of temperatures measured.
    (3) The temperature CPMS must be capable of recording the temperature at least once every 5 minutes and calculating hourly block averages that include only those 5-minute periods in which liquid product was loaded into gasoline cargo tanks.
    (4) At least quarterly, inspect all components for integrity and all electrical connections for continuity, oxidation, and galvanic corrosion, unless the CPMS has a redundant temperature sensor.
    (5) Conduct calibration checks at least annually and conduct calibration checks following any period of more than 24 hours throughout which the temperature exceeded the manufacturer's specified maximum rated temperature or install a new temperature sensor.

Citations to §60.504a(a)(5)

  • (a) Install, operate, and maintain a CPMS for measuring the combustion zone temperature as specified in paragraphs (a)(1) through (5) of this section.
    (1) Install the temperature CPMS in the combustion (flame) zone or in the exhaust gas stream as close as practical to the combustion burners in a position that provides a representative temperature of the combustion zone of the thermal oxidation system.
    (2) The temperature CPMS must be capable of measuring temperature with an accuracy of ±1 percent over the normal range of temperatures measured.
    (3) The temperature CPMS must be capable of recording the temperature at least once every 5 minutes and calculating hourly block averages that include only those 5-minute periods in which liquid product was loaded into gasoline cargo tanks.
    (4) At least quarterly, inspect all components for integrity and all electrical connections for continuity, oxidation, and galvanic corrosion, unless the CPMS has a redundant temperature sensor.
    (5) Conduct calibration checks at least annually and conduct calibration checks following any period of more than 24 hours throughout which the temperature exceeded the manufacturer's specified maximum rated temperature or install a new temperature sensor.

Citations to §60.504a(b)

  • (4) For each bulk gasoline terminal complying with the emission limitation in item 3 of table 3 to this subpart (carbon adsorption system, refrigerated condenser, or other vapor recovery system), install, operate, and maintain a continuous emission monitoring system (CEMS) to measure the total organic compounds (TOC) concentration according to § 60.504a(b) of this chapter and conduct performance evaluations as specified in § 60.503a(a) and (d) of this chapter. For periods of CEMS outages, you may use the limited alternative monitoring methods as specified in § 60.504a(e) of this chapter.
  • (c) Except as provided in paragraph (f) of this section, each owner or operator of a bulk gasoline terminal subject to the provisions in § 63.422(b)(2) shall install, calibrate, certify, operate, and maintain a CMS as specified in § 60.504a(a) through (d) of this chapter, as applicable. You may use the limited alternative monitoring methods as specified in § 60.504a(e) of this chapter, if applicable.

Citations to §60.504a(c)

Citations to §60.504a(c)(1)

  • (c) Install, operate, and maintain CPMS for flares used to comply with the emission limitations in § 60.502a(c)(3), including monitors used for gasoline and total liquid product loading rates, following the requirements specified in § 63.671 of this chapter as specified in paragraphs (c)(1) through (3) of this section and conduct visible emission observations as specified in paragraph (c)(4) of this section.
    (1) Substitute “pilot flame or flare flame” for each occurrence of “pilot flame.”
    (2) You may elect to determine compositional analysis for net heating value with a continuous process mass spectrometer without the use of a gas chromatograph. If you choose to determine compositional analysis for net heating value with a continuous process mass spectrometer, then you must comply with the requirements specified in paragraphs (c)(2)(i) through (vii) of this section.
    (i) You must meet the requirements in § 63.671(e)(2) of this chapter. You may augment the minimum list of calibration gas components found in § 63.671(e)(2) with compounds found during a pre-survey or known to be in the gas through process knowledge.
    (ii) Calibration gas cylinders must be certified to an accuracy of 2 percent and traceable to National Institute of Standards and Technology (NIST) standards.
    (iii) For unknown gas components that have similar analytical mass fragments to calibration compounds, you may report the unknowns as an increase in the overlapped calibration gas compound. For unknown compounds that produce mass fragments that do not overlap calibration compounds, you may use the response factor for the nearest molecular weight hydrocarbon in the calibration mix to quantify the unknown component's net heating value of flare vent gas (NHVvg).
    (iv) You may use the response factor for n-pentane to quantify any unknown components detected with a higher molecular weight than n-pentane.
    (v) You must perform an initial calibration to identify mass fragment overlap and response factors for the target compounds.
    (vi) You must meet applicable requirements in Performance Specification 9 of appendix B to this part for continuous monitoring system acceptance including, but not limited to, performing an initial multi-point calibration check at three concentrations following the procedure in section 10.1 of Performance Specification 9 and performing the periodic calibration requirements listed for gas chromatographs in table 13 to part 63, subpart CC, of this chapter, for the process mass spectrometer. You may use the alternative sampling line temperature allowed under Net Heating Value by Gas Chromatograph in table 13 to part 63, subpart CC.
    (vii) The average instrument calibration error (CE) for each calibration compound at any calibration concentration must not differ by more than 10 percent from the certified cylinder gas value. The CE for each component in the calibration blend must be calculated using the following equation:
    (3) If you use a gas chromatograph or mass spectrometer for compositional analysis for net heating value, then you may choose to use the CE of net heating value (NHV) measured versus the cylinder tag value NHV as the measure of agreement for daily calibration and quarterly audits in lieu of determining the compound-specific CE. The CE for NHV at any calibration level must not differ by more than 10 percent from the certified cylinder gas value. The CE for NHV must be calculated using the following equation:
    (4) If visible emissions are observed for more than one continuous minute during normal duties, visible emissions observation using Method 22 of appendix A-7 to this part must be conducted for 2 hours or until 5-minutes of visible emissions are observed.

Citations to §60.504a(c)(2)

  • (c) Install, operate, and maintain CPMS for flares used to comply with the emission limitations in § 60.502a(c)(3), including monitors used for gasoline and total liquid product loading rates, following the requirements specified in § 63.671 of this chapter as specified in paragraphs (c)(1) through (3) of this section and conduct visible emission observations as specified in paragraph (c)(4) of this section.
    (1) Substitute “pilot flame or flare flame” for each occurrence of “pilot flame.”
    (2) You may elect to determine compositional analysis for net heating value with a continuous process mass spectrometer without the use of a gas chromatograph. If you choose to determine compositional analysis for net heating value with a continuous process mass spectrometer, then you must comply with the requirements specified in paragraphs (c)(2)(i) through (vii) of this section.
    (i) You must meet the requirements in § 63.671(e)(2) of this chapter. You may augment the minimum list of calibration gas components found in § 63.671(e)(2) with compounds found during a pre-survey or known to be in the gas through process knowledge.
    (ii) Calibration gas cylinders must be certified to an accuracy of 2 percent and traceable to National Institute of Standards and Technology (NIST) standards.
    (iii) For unknown gas components that have similar analytical mass fragments to calibration compounds, you may report the unknowns as an increase in the overlapped calibration gas compound. For unknown compounds that produce mass fragments that do not overlap calibration compounds, you may use the response factor for the nearest molecular weight hydrocarbon in the calibration mix to quantify the unknown component's net heating value of flare vent gas (NHVvg).
    (iv) You may use the response factor for n-pentane to quantify any unknown components detected with a higher molecular weight than n-pentane.
    (v) You must perform an initial calibration to identify mass fragment overlap and response factors for the target compounds.
    (vi) You must meet applicable requirements in Performance Specification 9 of appendix B to this part for continuous monitoring system acceptance including, but not limited to, performing an initial multi-point calibration check at three concentrations following the procedure in section 10.1 of Performance Specification 9 and performing the periodic calibration requirements listed for gas chromatographs in table 13 to part 63, subpart CC, of this chapter, for the process mass spectrometer. You may use the alternative sampling line temperature allowed under Net Heating Value by Gas Chromatograph in table 13 to part 63, subpart CC.
    (vii) The average instrument calibration error (CE) for each calibration compound at any calibration concentration must not differ by more than 10 percent from the certified cylinder gas value. The CE for each component in the calibration blend must be calculated using the following equation:
    (3) If you use a gas chromatograph or mass spectrometer for compositional analysis for net heating value, then you may choose to use the CE of net heating value (NHV) measured versus the cylinder tag value NHV as the measure of agreement for daily calibration and quarterly audits in lieu of determining the compound-specific CE. The CE for NHV at any calibration level must not differ by more than 10 percent from the certified cylinder gas value. The CE for NHV must be calculated using the following equation:
    (4) If visible emissions are observed for more than one continuous minute during normal duties, visible emissions observation using Method 22 of appendix A-7 to this part must be conducted for 2 hours or until 5-minutes of visible emissions are observed.

Citations to §60.504a(c)(2)(i)

  • (2) You may elect to determine compositional analysis for net heating value with a continuous process mass spectrometer without the use of a gas chromatograph. If you choose to determine compositional analysis for net heating value with a continuous process mass spectrometer, then you must comply with the requirements specified in paragraphs (c)(2)(i) through (vii) of this section.
    (i) You must meet the requirements in § 63.671(e)(2) of this chapter. You may augment the minimum list of calibration gas components found in § 63.671(e)(2) with compounds found during a pre-survey or known to be in the gas through process knowledge.
    (ii) Calibration gas cylinders must be certified to an accuracy of 2 percent and traceable to National Institute of Standards and Technology (NIST) standards.
    (iii) For unknown gas components that have similar analytical mass fragments to calibration compounds, you may report the unknowns as an increase in the overlapped calibration gas compound. For unknown compounds that produce mass fragments that do not overlap calibration compounds, you may use the response factor for the nearest molecular weight hydrocarbon in the calibration mix to quantify the unknown component's net heating value of flare vent gas (NHVvg).
    (iv) You may use the response factor for n-pentane to quantify any unknown components detected with a higher molecular weight than n-pentane.
    (v) You must perform an initial calibration to identify mass fragment overlap and response factors for the target compounds.
    (vi) You must meet applicable requirements in Performance Specification 9 of appendix B to this part for continuous monitoring system acceptance including, but not limited to, performing an initial multi-point calibration check at three concentrations following the procedure in section 10.1 of Performance Specification 9 and performing the periodic calibration requirements listed for gas chromatographs in table 13 to part 63, subpart CC, of this chapter, for the process mass spectrometer. You may use the alternative sampling line temperature allowed under Net Heating Value by Gas Chromatograph in table 13 to part 63, subpart CC.
    (vii) The average instrument calibration error (CE) for each calibration compound at any calibration concentration must not differ by more than 10 percent from the certified cylinder gas value. The CE for each component in the calibration blend must be calculated using the following equation:

Citations to §60.504a(c)(3)

  • (c) Install, operate, and maintain CPMS for flares used to comply with the emission limitations in § 60.502a(c)(3), including monitors used for gasoline and total liquid product loading rates, following the requirements specified in § 63.671 of this chapter as specified in paragraphs (c)(1) through (3) of this section and conduct visible emission observations as specified in paragraph (c)(4) of this section.
    (1) Substitute “pilot flame or flare flame” for each occurrence of “pilot flame.”
    (2) You may elect to determine compositional analysis for net heating value with a continuous process mass spectrometer without the use of a gas chromatograph. If you choose to determine compositional analysis for net heating value with a continuous process mass spectrometer, then you must comply with the requirements specified in paragraphs (c)(2)(i) through (vii) of this section.
    (i) You must meet the requirements in § 63.671(e)(2) of this chapter. You may augment the minimum list of calibration gas components found in § 63.671(e)(2) with compounds found during a pre-survey or known to be in the gas through process knowledge.
    (ii) Calibration gas cylinders must be certified to an accuracy of 2 percent and traceable to National Institute of Standards and Technology (NIST) standards.
    (iii) For unknown gas components that have similar analytical mass fragments to calibration compounds, you may report the unknowns as an increase in the overlapped calibration gas compound. For unknown compounds that produce mass fragments that do not overlap calibration compounds, you may use the response factor for the nearest molecular weight hydrocarbon in the calibration mix to quantify the unknown component's net heating value of flare vent gas (NHVvg).
    (iv) You may use the response factor for n-pentane to quantify any unknown components detected with a higher molecular weight than n-pentane.
    (v) You must perform an initial calibration to identify mass fragment overlap and response factors for the target compounds.
    (vi) You must meet applicable requirements in Performance Specification 9 of appendix B to this part for continuous monitoring system acceptance including, but not limited to, performing an initial multi-point calibration check at three concentrations following the procedure in section 10.1 of Performance Specification 9 and performing the periodic calibration requirements listed for gas chromatographs in table 13 to part 63, subpart CC, of this chapter, for the process mass spectrometer. You may use the alternative sampling line temperature allowed under Net Heating Value by Gas Chromatograph in table 13 to part 63, subpart CC.
    (vii) The average instrument calibration error (CE) for each calibration compound at any calibration concentration must not differ by more than 10 percent from the certified cylinder gas value. The CE for each component in the calibration blend must be calculated using the following equation:
    (3) If you use a gas chromatograph or mass spectrometer for compositional analysis for net heating value, then you may choose to use the CE of net heating value (NHV) measured versus the cylinder tag value NHV as the measure of agreement for daily calibration and quarterly audits in lieu of determining the compound-specific CE. The CE for NHV at any calibration level must not differ by more than 10 percent from the certified cylinder gas value. The CE for NHV must be calculated using the following equation:
    (4) If visible emissions are observed for more than one continuous minute during normal duties, visible emissions observation using Method 22 of appendix A-7 to this part must be conducted for 2 hours or until 5-minutes of visible emissions are observed.

Citations to §60.504a(c)(4)

Citations to §60.504a(c)(vii)

  • (2) You may elect to determine compositional analysis for net heating value with a continuous process mass spectrometer without the use of a gas chromatograph. If you choose to determine compositional analysis for net heating value with a continuous process mass spectrometer, then you must comply with the requirements specified in paragraphs (c)(2)(i) through (vii) of this section.
    (i) You must meet the requirements in § 63.671(e)(2) of this chapter. You may augment the minimum list of calibration gas components found in § 63.671(e)(2) with compounds found during a pre-survey or known to be in the gas through process knowledge.
    (ii) Calibration gas cylinders must be certified to an accuracy of 2 percent and traceable to National Institute of Standards and Technology (NIST) standards.
    (iii) For unknown gas components that have similar analytical mass fragments to calibration compounds, you may report the unknowns as an increase in the overlapped calibration gas compound. For unknown compounds that produce mass fragments that do not overlap calibration compounds, you may use the response factor for the nearest molecular weight hydrocarbon in the calibration mix to quantify the unknown component's net heating value of flare vent gas (NHVvg).
    (iv) You may use the response factor for n-pentane to quantify any unknown components detected with a higher molecular weight than n-pentane.
    (v) You must perform an initial calibration to identify mass fragment overlap and response factors for the target compounds.
    (vi) You must meet applicable requirements in Performance Specification 9 of appendix B to this part for continuous monitoring system acceptance including, but not limited to, performing an initial multi-point calibration check at three concentrations following the procedure in section 10.1 of Performance Specification 9 and performing the periodic calibration requirements listed for gas chromatographs in table 13 to part 63, subpart CC, of this chapter, for the process mass spectrometer. You may use the alternative sampling line temperature allowed under Net Heating Value by Gas Chromatograph in table 13 to part 63, subpart CC.
    (vii) The average instrument calibration error (CE) for each calibration compound at any calibration concentration must not differ by more than 10 percent from the certified cylinder gas value. The CE for each component in the calibration blend must be calculated using the following equation:

Citations to §60.504a(d)

  • (h) The vapor collection and liquid loading equipment for a gasoline loading rack affected facility shall be designed and operated to prevent gauge pressure in the gasoline cargo tank from exceeding 18 inches of water (460 millimeters (mm) of water) during product loading. This level is not to be exceeded and must be continuously monitored according to the procedures specified in § 60.504a(d).
  • (d) You must comply with the applicable testing and monitoring requirements specified in § 63.11092. As an alternative to the pressure monitoring requirements specified in § 60.504a(d) of this chapter, you may comply with the requirements specified in § 63.11092(h).
  • (h) As an alternative to the pressure monitoring requirements in § 60.504a(d) of this chapter, you may comply with the pressure monitoring requirements in § 60.503(d) of this chapter during any performance test or performance evaluation conducted under § 63.11092(e) to demonstrate compliance with the provisions in § 60.502a(h) of this chapter.
  • (2) Each owner or operator of loading racks at a bulk gasoline terminal subject to the provisions of this subpart shall comply with the requirements in § 60.502a of this chapter except for paragraphs (b) and (j) of that section and shall comply with the provisions in paragraphs (b) through (c) of this section. For purposes of this section, the term “gasoline loading rack affected facility” used in § 60.502a means “the loading racks that load gasoline cargo tanks at the bulk gasoline terminals subject to the provisions of this subpart.” For purposes of this subpart, the term “vapor-tight gasoline cargo tanks” used in § 60.502a(e) of this chapter shall have the meaning given in § 63.421. As an alternative to the pressure monitoring requirements in § 60.504a(d) of this chapter, you may comply with the requirements specified in § 63.427(f).
  • (c) Except as provided in paragraph (f) of this section, each owner or operator of a bulk gasoline terminal subject to the provisions in § 63.422(b)(2) shall install, calibrate, certify, operate, and maintain a CMS as specified in § 60.504a(a) through (d) of this chapter, as applicable. You may use the limited alternative monitoring methods as specified in § 60.504a(e) of this chapter, if applicable.

Citations to §60.504a(d)(1)

  • (d) The owner or operator shall install, operate, and maintain a CPMS to measure the pressure of the vapor collection system to determine compliance with the standard in § 60.502a(h) as specified in paragraphs (d)(1) through (4) of this section.
    (1) Install a pressure CPMS (liquid manometer, magnehelic gauge, or equivalent instrument), capable of measuring up to 500 mm of water gauge pressure with ±2.5 mm of water precision on the terminal's vapor collection system at a pressure tap located as close as possible to the connection with the gasoline cargo tank. If necessary to obtain representative loading pressures, install pressure CPMS for each loading rack.
    (2) Check the calibration of the pressure CPMS following any period of more than 24 hours throughout which the pressure exceeded the manufacturer's specified maximum rated pressure or install a new pressure sensor.
    (3) At least quarterly, visually inspect components of the pressure CPMS for integrity, oxidation and galvanic corrosion, unless the system has a redundant pressure sensor.
    (4) The output of the pressure CPMS must be reviewed each operating day to ensure that the pressure readings fluctuate as expected during loading of gasoline cargo tanks to verify the pressure taps are not plugged. Plugged pressure taps must be unplugged or otherwise repaired within 24 hours or prior to the next gasoline cargo tank loading, whichever time period is longer.

Citations to §60.504a(d)(2)

  • (d) The owner or operator shall install, operate, and maintain a CPMS to measure the pressure of the vapor collection system to determine compliance with the standard in § 60.502a(h) as specified in paragraphs (d)(1) through (4) of this section.
    (1) Install a pressure CPMS (liquid manometer, magnehelic gauge, or equivalent instrument), capable of measuring up to 500 mm of water gauge pressure with ±2.5 mm of water precision on the terminal's vapor collection system at a pressure tap located as close as possible to the connection with the gasoline cargo tank. If necessary to obtain representative loading pressures, install pressure CPMS for each loading rack.
    (2) Check the calibration of the pressure CPMS following any period of more than 24 hours throughout which the pressure exceeded the manufacturer's specified maximum rated pressure or install a new pressure sensor.
    (3) At least quarterly, visually inspect components of the pressure CPMS for integrity, oxidation and galvanic corrosion, unless the system has a redundant pressure sensor.
    (4) The output of the pressure CPMS must be reviewed each operating day to ensure that the pressure readings fluctuate as expected during loading of gasoline cargo tanks to verify the pressure taps are not plugged. Plugged pressure taps must be unplugged or otherwise repaired within 24 hours or prior to the next gasoline cargo tank loading, whichever time period is longer.

Citations to §60.504a(d)(3)

  • (d) The owner or operator shall install, operate, and maintain a CPMS to measure the pressure of the vapor collection system to determine compliance with the standard in § 60.502a(h) as specified in paragraphs (d)(1) through (4) of this section.
    (1) Install a pressure CPMS (liquid manometer, magnehelic gauge, or equivalent instrument), capable of measuring up to 500 mm of water gauge pressure with ±2.5 mm of water precision on the terminal's vapor collection system at a pressure tap located as close as possible to the connection with the gasoline cargo tank. If necessary to obtain representative loading pressures, install pressure CPMS for each loading rack.
    (2) Check the calibration of the pressure CPMS following any period of more than 24 hours throughout which the pressure exceeded the manufacturer's specified maximum rated pressure or install a new pressure sensor.
    (3) At least quarterly, visually inspect components of the pressure CPMS for integrity, oxidation and galvanic corrosion, unless the system has a redundant pressure sensor.
    (4) The output of the pressure CPMS must be reviewed each operating day to ensure that the pressure readings fluctuate as expected during loading of gasoline cargo tanks to verify the pressure taps are not plugged. Plugged pressure taps must be unplugged or otherwise repaired within 24 hours or prior to the next gasoline cargo tank loading, whichever time period is longer.

Citations to §60.504a(d)(4)

  • (d) The owner or operator shall install, operate, and maintain a CPMS to measure the pressure of the vapor collection system to determine compliance with the standard in § 60.502a(h) as specified in paragraphs (d)(1) through (4) of this section.
    (1) Install a pressure CPMS (liquid manometer, magnehelic gauge, or equivalent instrument), capable of measuring up to 500 mm of water gauge pressure with ±2.5 mm of water precision on the terminal's vapor collection system at a pressure tap located as close as possible to the connection with the gasoline cargo tank. If necessary to obtain representative loading pressures, install pressure CPMS for each loading rack.
    (2) Check the calibration of the pressure CPMS following any period of more than 24 hours throughout which the pressure exceeded the manufacturer's specified maximum rated pressure or install a new pressure sensor.
    (3) At least quarterly, visually inspect components of the pressure CPMS for integrity, oxidation and galvanic corrosion, unless the system has a redundant pressure sensor.
    (4) The output of the pressure CPMS must be reviewed each operating day to ensure that the pressure readings fluctuate as expected during loading of gasoline cargo tanks to verify the pressure taps are not plugged. Plugged pressure taps must be unplugged or otherwise repaired within 24 hours or prior to the next gasoline cargo tank loading, whichever time period is longer.

Citations to §60.504a(e)

  • (iv) For each period when there was a CMS outage or the CMS was out of control, the start date and time, duration, cause, and the corrective action taken. For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) is used, the corrective action taken shall include an indication of the use of the limited alternative for vapor recovery systems in § 60.504a(e).
  • (4) For each bulk gasoline terminal complying with the emission limitation in item 3 of table 3 to this subpart (carbon adsorption system, refrigerated condenser, or other vapor recovery system), install, operate, and maintain a continuous emission monitoring system (CEMS) to measure the total organic compounds (TOC) concentration according to § 60.504a(b) of this chapter and conduct performance evaluations as specified in § 60.503a(a) and (d) of this chapter. For periods of CEMS outages, you may use the limited alternative monitoring methods as specified in § 60.504a(e) of this chapter.
  • (iv) For each period when there was a CMS outage or the CMS was out of control, the start date and time, duration, cause, and the corrective action taken. For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, the corrective action taken shall include an indication of the use of the limited alternative for vapor recovery systems in § 60.504a(e).
  • (E) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, the corrective action taken shall include an indication of the use of the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter.
  • (c) Except as provided in paragraph (f) of this section, each owner or operator of a bulk gasoline terminal subject to the provisions in § 63.422(b)(2) shall install, calibrate, certify, operate, and maintain a CMS as specified in § 60.504a(a) through (d) of this chapter, as applicable. You may use the limited alternative monitoring methods as specified in § 60.504a(e) of this chapter, if applicable.
  • (iv) For each period when there was a CMS outage or the CMS was out of control, the start date and time, duration, cause, and the corrective action taken. For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, the corrective action taken shall include an indication of the use of the limited alternative for vapor recovery systems in § 60.504a(e).

Citations to §60.504a(e)(1)

  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1). Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i). Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii). Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii). Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter.
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.

Citations to §60.504a(e)(2)(i)

  • (2) Determine the vacuum pressure, purge gas quantities, and duration of the vacuum/purge cycles used for the past 10 desorption cycles prior to the CEMS going off-line. You must operate vapor recovery system desorption cycles as specified in paragraphs (e)(2)(i) through (iii) of this section.
    (i) The vacuum pressure for each desorption cycle must be at or above the average vacuum pressure from the past 10 desorption cycles. Note: a higher vacuum means a lower absolute pressure.
    (ii) Purge gas quantity used for each desorption cycle must be at or above the average quantity of purge gas used from the past 10 desorption cycles.
    (iii) Duration of the vacuum/purge cycle for each desorption cycle must be at or above the average duration of the vacuum/purge cycle used from the past 10 desorption cycles.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1). Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i). Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii). Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii). Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter.
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.

Citations to §60.504a(e)(2)(ii)

  • (2) Determine the vacuum pressure, purge gas quantities, and duration of the vacuum/purge cycles used for the past 10 desorption cycles prior to the CEMS going off-line. You must operate vapor recovery system desorption cycles as specified in paragraphs (e)(2)(i) through (iii) of this section.
    (i) The vacuum pressure for each desorption cycle must be at or above the average vacuum pressure from the past 10 desorption cycles. Note: a higher vacuum means a lower absolute pressure.
    (ii) Purge gas quantity used for each desorption cycle must be at or above the average quantity of purge gas used from the past 10 desorption cycles.
    (iii) Duration of the vacuum/purge cycle for each desorption cycle must be at or above the average duration of the vacuum/purge cycle used from the past 10 desorption cycles.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1). Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i). Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii). Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii). Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter.
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.

Citations to §60.504a(e)(2)(iii)

  • (2) Determine the vacuum pressure, purge gas quantities, and duration of the vacuum/purge cycles used for the past 10 desorption cycles prior to the CEMS going off-line. You must operate vapor recovery system desorption cycles as specified in paragraphs (e)(2)(i) through (iii) of this section.
    (i) The vacuum pressure for each desorption cycle must be at or above the average vacuum pressure from the past 10 desorption cycles. Note: a higher vacuum means a lower absolute pressure.
    (ii) Purge gas quantity used for each desorption cycle must be at or above the average quantity of purge gas used from the past 10 desorption cycles.
    (iii) Duration of the vacuum/purge cycle for each desorption cycle must be at or above the average duration of the vacuum/purge cycle used from the past 10 desorption cycles.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1). Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i). Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii). Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii). Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter.
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.
  • (F) For TOC CEMS outages where the limited alternative for vapor recovery systems in § 60.504a(e) of this chapter is used, report either an indication that there were no deviations from the operating limits when using the limited alternative or report the number of each of the following types of deviations that occurred during the use of the limited alternative for vapor recovery systems in § 60.504a(e).
    (1) The number of adsorption cycles when the quantity of liquid product loaded in gasoline cargo tanks exceeded the operating limit established in § 60.504a(e)(1) of this chapter. Enter 0 if no deviations of this type.
    (2) The number of desorption cycles when the vacuum pressure was below the average vacuum pressure as specified in § 60.504a(e)(2)(i) of this chapter. Enter 0 if no deviations of this type.
    (3) The number of desorption cycles when the quantity of purge gas used was below the average quantity of purge gas as specified in § 60.504a(e)(2)(ii) of this chapter. Enter 0 if no deviations of this type.
    (4) The number of desorption cycles when the duration of the vacuum/purge cycle was less than the average duration as specified in § 60.504a(e)(2)(iii) of this chapter. Enter 0 if no deviations of this type.