§60.4875. By what date must I conduct the initial air pollution control device inspection and make any necessary repairs? — Inbound Citations
40 C.F.R. § 60.4875
Statutory Authority
Cited by 2 regulations in release Current.
Citations to 40 C.F.R. § 60.4875 as a whole
-
(d) Records of the results of initial and annual air pollution control device inspections conducted as specified in §§ 60.4875 and 60.4900(c), including any required maintenance and any repairs not completed within 10 days of an inspection or the timeframe established by the Administrator.
-
(8) The results of the initial air pollution control device inspection required in § 60.4875, including a description of repairs.