§60.472. Standards for particulate matter. — Inbound Citations
40 C.F.R. § 60.472
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 40 U.S.C. § 60.472 as a whole
-
(c) The owner or operator shall determine compliance with the particulate matter standards in § 60.472 as follows:(1) The emission rate (E) of particulate matter shall be computed for each run using the following equation:(2) Method 5A shall be used to determine the particulate matter concentration (cs) and volumetric flow rate (Qsd) of the effluent gas. For a saturator, the sampling time and sample volume for each run shall be at least 120 minutes and 3.00 dscm (106 dscf), and for the blowing still, at least 90 minutes or the duration of the coating blow or non-coating blow, whichever is greater, and 2.25 dscm (79.4 dscf).(3) For the saturator, the asphalt roofing production rate (P) for each run shall be determined as follows: The amount of asphalt roofing produced on the shingle or saturated felt process lines shall be obtained by direct measurement. The asphalt roofing production rate is the amount produced divided by the time taken for the run.(4) For the blowing still, the asphalt charging rate (P) shall be computed for each run using the following equation:(i) The volume (V) of asphalt charged shall be measured by any means accurate to within 10 percent.(ii) The density (d) of the asphalt shall be computed using the following equation:(5) Method 9 and the procedures in § 60.11 shall be used to determine opacity.
Citations to §60.472(a)
-
(f) If at a later date the owner or operator believes that the emission limits in § 60.472(a) and (b) are being met even though one of the conditions listed in this paragraph exist, he may submit a written request to the Administrator to repeat the performance test and procedure outlined in paragraph (c) of this section.(1) The temperature measured in accordance with § 60.473(a) is exceeding that measured during the performance test.(2) The temperature measured in accordance with § 60.473(b) is lower than that measured during the performance test.
Citations to §60.472(a)(1)
-
(a) The owner or operator subject to the provisions of this subpart, and using either an electrostatic precipitator or a high velocity air filter to meet the emission limit in § 60.472(a)(1) and/or (b)(1) shall continuously monitor and record the temperature of the gas at the inlet of the control device. The temperature monitoring instrument shall have an accuracy of ±15 °C (±25 °F) over its range.
Citations to §60.472(a)(3)
-
(d) The Administrator will determine compliance with the standards in § 60.472(a)(3) by using Method 22, modified so that readings are recorded every 15 seconds for a period of consecutive observations during representative conditions (in accordance with § 60.8(c)) totaling 60 minutes. A performance test shall consist of one run.
Citations to §60.472(b)
-
(f) If at a later date the owner or operator believes that the emission limits in § 60.472(a) and (b) are being met even though one of the conditions listed in this paragraph exist, he may submit a written request to the Administrator to repeat the performance test and procedure outlined in paragraph (c) of this section.(1) The temperature measured in accordance with § 60.473(a) is exceeding that measured during the performance test.(2) The temperature measured in accordance with § 60.473(b) is lower than that measured during the performance test.