§60.4331a. What are the requirements for operating a stationary temporary combustion turbine? — Inbound Citations

40 C.F.R. § 60.4331a

Cited by 7 regulations in release Current.

Citations to §60.4331a(b)

  • (a) Notwithstanding any other provision of this subpart, owners or operators of a small- or medium-size stationary combustion turbine (i.e., a combustion turbine with a base load rating less than or equal to 850 MMBtu/h) at a single location for up to 24 consecutive months, may elect to be a temporary combustion turbine and comply with the requirements in paragraphs (b) through (e) of this section as an alternative to the otherwise applicable emission standards and monitoring, recordkeeping, and reporting requirements of this subpart.

Citations to §60.4331a(c)

  • (a) Notwithstanding any other provision of this subpart, owners or operators of a small- or medium-size stationary combustion turbine (i.e., a combustion turbine with a base load rating less than or equal to 850 MMBtu/h) at a single location for up to 24 consecutive months, may elect to be a temporary combustion turbine and comply with the requirements in paragraphs (b) through (e) of this section as an alternative to the otherwise applicable emission standards and monitoring, recordkeeping, and reporting requirements of this subpart.

Citations to §60.4331a(d)

  • (a) Notwithstanding any other provision of this subpart, owners or operators of a small- or medium-size stationary combustion turbine (i.e., a combustion turbine with a base load rating less than or equal to 850 MMBtu/h) at a single location for up to 24 consecutive months, may elect to be a temporary combustion turbine and comply with the requirements in paragraphs (b) through (e) of this section as an alternative to the otherwise applicable emission standards and monitoring, recordkeeping, and reporting requirements of this subpart.

Citations to §60.4331a(e)

  • (a) Notwithstanding any other provision of this subpart, owners or operators of a small- or medium-size stationary combustion turbine (i.e., a combustion turbine with a base load rating less than or equal to 850 MMBtu/h) at a single location for up to 24 consecutive months, may elect to be a temporary combustion turbine and comply with the requirements in paragraphs (b) through (e) of this section as an alternative to the otherwise applicable emission standards and monitoring, recordkeeping, and reporting requirements of this subpart.

Citations to §60.4331a(e)(1)

  • (e) The conditions in paragraphs (e)(1) through (3) of this section apply in determining whether your stationary combustion turbine qualifies as a stationary temporary combustion turbine.
    (1) The combustion turbine may only be located at the same stationary source (or group of stationary sources located within a contiguous area and under common control) for a total period of 24 consecutive months. This is the total period of residence time allowed after the turbine commences operation at the location, regardless of whether the turbine is in operation for the entire 24-consecutive-month period.
    (2) Any temporary combustion turbine that replaces a temporary combustion turbine at a location and performs the same or similar function will be included in calculating the consecutive time period.
    (3) The relocation of a stationary temporary combustion turbine within a single stationary source (or group of stationary sources located within a contiguous area and under common control) while performing the same or similar function (i.e., serving the same electric, mechanical, or thermal load) does not restart the 24-calendar month residence time period.

Citations to §60.4331a(e)(2)

  • (e) The conditions in paragraphs (e)(1) through (3) of this section apply in determining whether your stationary combustion turbine qualifies as a stationary temporary combustion turbine.
    (1) The combustion turbine may only be located at the same stationary source (or group of stationary sources located within a contiguous area and under common control) for a total period of 24 consecutive months. This is the total period of residence time allowed after the turbine commences operation at the location, regardless of whether the turbine is in operation for the entire 24-consecutive-month period.
    (2) Any temporary combustion turbine that replaces a temporary combustion turbine at a location and performs the same or similar function will be included in calculating the consecutive time period.
    (3) The relocation of a stationary temporary combustion turbine within a single stationary source (or group of stationary sources located within a contiguous area and under common control) while performing the same or similar function (i.e., serving the same electric, mechanical, or thermal load) does not restart the 24-calendar month residence time period.

Citations to §60.4331a(e)(3)

  • (e) The conditions in paragraphs (e)(1) through (3) of this section apply in determining whether your stationary combustion turbine qualifies as a stationary temporary combustion turbine.
    (1) The combustion turbine may only be located at the same stationary source (or group of stationary sources located within a contiguous area and under common control) for a total period of 24 consecutive months. This is the total period of residence time allowed after the turbine commences operation at the location, regardless of whether the turbine is in operation for the entire 24-consecutive-month period.
    (2) Any temporary combustion turbine that replaces a temporary combustion turbine at a location and performs the same or similar function will be included in calculating the consecutive time period.
    (3) The relocation of a stationary temporary combustion turbine within a single stationary source (or group of stationary sources located within a contiguous area and under common control) while performing the same or similar function (i.e., serving the same electric, mechanical, or thermal load) does not restart the 24-calendar month residence time period.