§60.397a. Emission capture system efficiency. — Inbound Citations

40 C.F.R. § 60.397a

Cited by 27 regulations in release Current.

Citations to 40 C.F.R. § 60.397a as a whole

  • (ii) You must determine the mass of VOC emissions and volume of coating solids deposited in the initial compliance period. The initial compliance demonstration includes the results of emission capture system and add-on control device performance tests conducted according to §§ 60.396a and 60.397a; supporting documentation showing that during the initial compliance period the VOC emission rate was equal to or less than the emission limit in § 60.392a; the operating limits established during the performance tests and the results of the continuous parameter monitoring required by § 60.394a; and documentation of whether you developed and implemented the work practice plans required by § 60.392(b) and (c).
  • (f) For each capture device that is not part of a permanent total enclosure (PTE) that meets the criteria of § 60.397a and that is not capturing emissions from a downdraft spray booth or from a flash-off area or bake oven associated with a downdraft spray booth, establish an operating limit for either the gas volumetric flow rate or duct static pressure, as specified in paragraphs (f)(1) and (2) of this section. The operating limit for a PTE is specified in table 1 to this subpart.
    (1) During the capture efficiency determination required by § 60.393a and described in § 60.397a, you must monitor and record either the gas volumetric flow rate or the duct static pressure for each separate capture device in your emission capture system at least once every 15 minutes during each of the test runs at a point in the duct between the capture device and the add-on control device inlet.
    (2) Calculate and record the average gas volumetric flow rate or duct static pressure for the three test runs for each capture device, using all valid data. This average gas volumetric flow rate or duct static pressure is the minimum operating limit for that specific capture device.
  • (iv) The capture efficiency as required by § 60.397a and a description of the method used to establish the capture efficiency for the affected facility; and

Citations to §60.397a(a)

Citations to §60.397a(b)

  • (7) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in § 60.397a(b) through (g), including the records specified in paragraphs (k)(7)(i) through (iv) of this section that apply to you.
    (i) Records for a liquid-to-uncaptured-gas protocol using a temporary total enclosure or building enclosure. Records of the mass of total VOC, as measured by Method 204A or F of appendix M to 40 CFR part 51, for each material used in the coating operation, and the total VOC for all materials used during each capture efficiency test run, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (ii) Records of the mass of VOC emissions captured by the emission capture system, as measured by Method 204B or C of appendix M to 40 CFR part 51, at the inlet to the add-on control device, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (iii) Records needed to document a capture efficiency determination using a panel test as described in § 60.397a(e) and (g), including a copy of the test report and calculations performed to convert the panel test results to percent capture efficiency values.
    (iv) Records needed to document a capture efficiency determination using an alternative method or protocol, as specified in § 60.397a(f), if applicable.

Citations to §60.397a(c)

  • (7) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in § 60.397a(b) through (g), including the records specified in paragraphs (k)(7)(i) through (iv) of this section that apply to you.
    (i) Records for a liquid-to-uncaptured-gas protocol using a temporary total enclosure or building enclosure. Records of the mass of total VOC, as measured by Method 204A or F of appendix M to 40 CFR part 51, for each material used in the coating operation, and the total VOC for all materials used during each capture efficiency test run, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (ii) Records of the mass of VOC emissions captured by the emission capture system, as measured by Method 204B or C of appendix M to 40 CFR part 51, at the inlet to the add-on control device, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (iii) Records needed to document a capture efficiency determination using a panel test as described in § 60.397a(e) and (g), including a copy of the test report and calculations performed to convert the panel test results to percent capture efficiency values.
    (iv) Records needed to document a capture efficiency determination using an alternative method or protocol, as specified in § 60.397a(f), if applicable.
  • (b) If the capture system does not meet both of the criteria in paragraphs (a)(1) and (2) of this section, then you must use one of the five procedures described in paragraphs (c) through (g) of this section to measure capture efficiency. For the protocols in paragraphs (c) and (d) of this section, the capture efficiency measurement must consist of three test runs. Each test run must be at least 3 hours duration or the length of a production run, whichever is longer, up to 8 hours. For the purposes of this test, a production run means the time required for a single part to go from the beginning to the end of production, which includes surface preparation activities and drying or curing time.

Citations to §60.397a(c)(1)

  • (c) The liquid-to-uncaptured-gas protocol compares the mass of liquid VOC in materials used in the coating operation to the mass of VOC emissions not captured by the emission capture system. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (6) of this section to measure emission capture system efficiency using the liquid-to-uncaptured-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions for routing to an add-on control device, such as the entrance and exit areas of an oven or spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204A or F of appendix M to 40 CFR part 51 to determine the mass fraction of VOC liquid input from each coating and thinner used in the coating operation during each capture efficiency test run.
    (3) Use Equation 1 of this section to calculate the total mass of VOC liquid input (VOCused) from all the coatings and thinners used in the coating operation during each capture efficiency test run.
    (4) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (5) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 2 of this section:
    (6) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(c)(2)

  • (c) The liquid-to-uncaptured-gas protocol compares the mass of liquid VOC in materials used in the coating operation to the mass of VOC emissions not captured by the emission capture system. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (6) of this section to measure emission capture system efficiency using the liquid-to-uncaptured-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions for routing to an add-on control device, such as the entrance and exit areas of an oven or spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204A or F of appendix M to 40 CFR part 51 to determine the mass fraction of VOC liquid input from each coating and thinner used in the coating operation during each capture efficiency test run.
    (3) Use Equation 1 of this section to calculate the total mass of VOC liquid input (VOCused) from all the coatings and thinners used in the coating operation during each capture efficiency test run.
    (4) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (5) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 2 of this section:
    (6) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(c)(3)

  • (c) The liquid-to-uncaptured-gas protocol compares the mass of liquid VOC in materials used in the coating operation to the mass of VOC emissions not captured by the emission capture system. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (6) of this section to measure emission capture system efficiency using the liquid-to-uncaptured-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions for routing to an add-on control device, such as the entrance and exit areas of an oven or spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204A or F of appendix M to 40 CFR part 51 to determine the mass fraction of VOC liquid input from each coating and thinner used in the coating operation during each capture efficiency test run.
    (3) Use Equation 1 of this section to calculate the total mass of VOC liquid input (VOCused) from all the coatings and thinners used in the coating operation during each capture efficiency test run.
    (4) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (5) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 2 of this section:
    (6) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(c)(4)

  • (c) The liquid-to-uncaptured-gas protocol compares the mass of liquid VOC in materials used in the coating operation to the mass of VOC emissions not captured by the emission capture system. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (6) of this section to measure emission capture system efficiency using the liquid-to-uncaptured-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions for routing to an add-on control device, such as the entrance and exit areas of an oven or spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204A or F of appendix M to 40 CFR part 51 to determine the mass fraction of VOC liquid input from each coating and thinner used in the coating operation during each capture efficiency test run.
    (3) Use Equation 1 of this section to calculate the total mass of VOC liquid input (VOCused) from all the coatings and thinners used in the coating operation during each capture efficiency test run.
    (4) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (5) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 2 of this section:
    (6) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(c)(5)

  • (c) The liquid-to-uncaptured-gas protocol compares the mass of liquid VOC in materials used in the coating operation to the mass of VOC emissions not captured by the emission capture system. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (6) of this section to measure emission capture system efficiency using the liquid-to-uncaptured-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions for routing to an add-on control device, such as the entrance and exit areas of an oven or spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204A or F of appendix M to 40 CFR part 51 to determine the mass fraction of VOC liquid input from each coating and thinner used in the coating operation during each capture efficiency test run.
    (3) Use Equation 1 of this section to calculate the total mass of VOC liquid input (VOCused) from all the coatings and thinners used in the coating operation during each capture efficiency test run.
    (4) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (5) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 2 of this section:
    (6) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(c)(6)

  • (c) The liquid-to-uncaptured-gas protocol compares the mass of liquid VOC in materials used in the coating operation to the mass of VOC emissions not captured by the emission capture system. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (6) of this section to measure emission capture system efficiency using the liquid-to-uncaptured-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions for routing to an add-on control device, such as the entrance and exit areas of an oven or spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204A or F of appendix M to 40 CFR part 51 to determine the mass fraction of VOC liquid input from each coating and thinner used in the coating operation during each capture efficiency test run.
    (3) Use Equation 1 of this section to calculate the total mass of VOC liquid input (VOCused) from all the coatings and thinners used in the coating operation during each capture efficiency test run.
    (4) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (5) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 2 of this section:
    (6) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(d)

  • (7) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in § 60.397a(b) through (g), including the records specified in paragraphs (k)(7)(i) through (iv) of this section that apply to you.
    (i) Records for a liquid-to-uncaptured-gas protocol using a temporary total enclosure or building enclosure. Records of the mass of total VOC, as measured by Method 204A or F of appendix M to 40 CFR part 51, for each material used in the coating operation, and the total VOC for all materials used during each capture efficiency test run, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (ii) Records of the mass of VOC emissions captured by the emission capture system, as measured by Method 204B or C of appendix M to 40 CFR part 51, at the inlet to the add-on control device, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (iii) Records needed to document a capture efficiency determination using a panel test as described in § 60.397a(e) and (g), including a copy of the test report and calculations performed to convert the panel test results to percent capture efficiency values.
    (iv) Records needed to document a capture efficiency determination using an alternative method or protocol, as specified in § 60.397a(f), if applicable.
  • (b) If the capture system does not meet both of the criteria in paragraphs (a)(1) and (2) of this section, then you must use one of the five procedures described in paragraphs (c) through (g) of this section to measure capture efficiency. For the protocols in paragraphs (c) and (d) of this section, the capture efficiency measurement must consist of three test runs. Each test run must be at least 3 hours duration or the length of a production run, whichever is longer, up to 8 hours. For the purposes of this test, a production run means the time required for a single part to go from the beginning to the end of production, which includes surface preparation activities and drying or curing time.

Citations to §60.397a(d)(1)

  • (d) The gas-to-gas protocol compares the mass of VOC emissions captured by the emission capture system to the mass of VOC emissions not captured. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (d)(1) through (5) of this section to measure emission capture system efficiency using the gas-to-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions generated by the coating operation for routing to an add-on control device, such as the entrance and exit areas of an oven or a spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204B or C of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions captured by the emission capture system during each capture efficiency test run as measured at the inlet to the add-on control device.
    (i) The sampling points for the Method 204B or C measurement must be upstream from the add-on control device and must represent total emissions routed from the capture system and entering the add-on control device.
    (ii) If multiple emission streams from the capture system enter the add-on control device without a single common duct, then the emissions entering the add-on control device must be simultaneously or sequentially measured in each duct, and the total emissions entering the add-on control device must be determined.
    (3) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run. To make the measurement, substitute VOC for each occurrence of the term VOC in the methods.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (4) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 3 of this section:
    (5) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(d)(2)

  • (d) The gas-to-gas protocol compares the mass of VOC emissions captured by the emission capture system to the mass of VOC emissions not captured. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (d)(1) through (5) of this section to measure emission capture system efficiency using the gas-to-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions generated by the coating operation for routing to an add-on control device, such as the entrance and exit areas of an oven or a spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204B or C of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions captured by the emission capture system during each capture efficiency test run as measured at the inlet to the add-on control device.
    (i) The sampling points for the Method 204B or C measurement must be upstream from the add-on control device and must represent total emissions routed from the capture system and entering the add-on control device.
    (ii) If multiple emission streams from the capture system enter the add-on control device without a single common duct, then the emissions entering the add-on control device must be simultaneously or sequentially measured in each duct, and the total emissions entering the add-on control device must be determined.
    (3) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run. To make the measurement, substitute VOC for each occurrence of the term VOC in the methods.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (4) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 3 of this section:
    (5) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(d)(3)

  • (d) The gas-to-gas protocol compares the mass of VOC emissions captured by the emission capture system to the mass of VOC emissions not captured. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (d)(1) through (5) of this section to measure emission capture system efficiency using the gas-to-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions generated by the coating operation for routing to an add-on control device, such as the entrance and exit areas of an oven or a spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204B or C of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions captured by the emission capture system during each capture efficiency test run as measured at the inlet to the add-on control device.
    (i) The sampling points for the Method 204B or C measurement must be upstream from the add-on control device and must represent total emissions routed from the capture system and entering the add-on control device.
    (ii) If multiple emission streams from the capture system enter the add-on control device without a single common duct, then the emissions entering the add-on control device must be simultaneously or sequentially measured in each duct, and the total emissions entering the add-on control device must be determined.
    (3) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run. To make the measurement, substitute VOC for each occurrence of the term VOC in the methods.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (4) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 3 of this section:
    (5) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(d)(4)

  • (d) The gas-to-gas protocol compares the mass of VOC emissions captured by the emission capture system to the mass of VOC emissions not captured. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (d)(1) through (5) of this section to measure emission capture system efficiency using the gas-to-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions generated by the coating operation for routing to an add-on control device, such as the entrance and exit areas of an oven or a spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204B or C of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions captured by the emission capture system during each capture efficiency test run as measured at the inlet to the add-on control device.
    (i) The sampling points for the Method 204B or C measurement must be upstream from the add-on control device and must represent total emissions routed from the capture system and entering the add-on control device.
    (ii) If multiple emission streams from the capture system enter the add-on control device without a single common duct, then the emissions entering the add-on control device must be simultaneously or sequentially measured in each duct, and the total emissions entering the add-on control device must be determined.
    (3) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run. To make the measurement, substitute VOC for each occurrence of the term VOC in the methods.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (4) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 3 of this section:
    (5) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(d)(5)

  • (d) The gas-to-gas protocol compares the mass of VOC emissions captured by the emission capture system to the mass of VOC emissions not captured. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (d)(1) through (5) of this section to measure emission capture system efficiency using the gas-to-gas protocol.
    (1) Either use a building enclosure or construct an enclosure around the coating operation where coatings and thinners are applied, and all areas where emissions from these applied coatings and thinners subsequently occur, such as flash-off, curing, and drying areas. The areas of the coating operation where capture devices collect emissions generated by the coating operation for routing to an add-on control device, such as the entrance and exit areas of an oven or a spray booth, must also be inside the enclosure. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.
    (2) Use Method 204B or C of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions captured by the emission capture system during each capture efficiency test run as measured at the inlet to the add-on control device.
    (i) The sampling points for the Method 204B or C measurement must be upstream from the add-on control device and must represent total emissions routed from the capture system and entering the add-on control device.
    (ii) If multiple emission streams from the capture system enter the add-on control device without a single common duct, then the emissions entering the add-on control device must be simultaneously or sequentially measured in each duct, and the total emissions entering the add-on control device must be determined.
    (3) Use Method 204D or E of appendix M to 40 CFR part 51 to measure the total mass, kg, of VOC emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run. To make the measurement, substitute VOC for each occurrence of the term VOC in the methods.
    (ii) During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the coating operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.
    (4) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 3 of this section:
    (5) Determine the capture efficiency of the emission capture system as the average of the capture efficiencies measured in the three test runs.

Citations to §60.397a(e)

  • (178) ASTM D5087-02 (Reapproved 2021), Standard Test Method for Determining Amount of Volatile Organic Compound (VOC) Released from Solventborne Automotive Coatings and Available for Removal in a VOC Control Device (Abatement), approved February 1, 2021; IBR approved for § 60.397a(e) and appendix A to subpart MMa.
  • (7) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in § 60.397a(b) through (g), including the records specified in paragraphs (k)(7)(i) through (iv) of this section that apply to you.
    (i) Records for a liquid-to-uncaptured-gas protocol using a temporary total enclosure or building enclosure. Records of the mass of total VOC, as measured by Method 204A or F of appendix M to 40 CFR part 51, for each material used in the coating operation, and the total VOC for all materials used during each capture efficiency test run, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (ii) Records of the mass of VOC emissions captured by the emission capture system, as measured by Method 204B or C of appendix M to 40 CFR part 51, at the inlet to the add-on control device, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (iii) Records needed to document a capture efficiency determination using a panel test as described in § 60.397a(e) and (g), including a copy of the test report and calculations performed to convert the panel test results to percent capture efficiency values.
    (iv) Records needed to document a capture efficiency determination using an alternative method or protocol, as specified in § 60.397a(f), if applicable.
  • (b) If the capture system does not meet both of the criteria in paragraphs (a)(1) and (2) of this section, then you must use one of the five procedures described in paragraphs (c) through (g) of this section to measure capture efficiency. For the protocols in paragraphs (c) and (d) of this section, the capture efficiency measurement must consist of three test runs. Each test run must be at least 3 hours duration or the length of a production run, whichever is longer, up to 8 hours. For the purposes of this test, a production run means the time required for a single part to go from the beginning to the end of production, which includes surface preparation activities and drying or curing time.

Citations to §60.397a(f)

  • (7) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in § 60.397a(b) through (g), including the records specified in paragraphs (k)(7)(i) through (iv) of this section that apply to you.
    (i) Records for a liquid-to-uncaptured-gas protocol using a temporary total enclosure or building enclosure. Records of the mass of total VOC, as measured by Method 204A or F of appendix M to 40 CFR part 51, for each material used in the coating operation, and the total VOC for all materials used during each capture efficiency test run, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (ii) Records of the mass of VOC emissions captured by the emission capture system, as measured by Method 204B or C of appendix M to 40 CFR part 51, at the inlet to the add-on control device, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (iii) Records needed to document a capture efficiency determination using a panel test as described in § 60.397a(e) and (g), including a copy of the test report and calculations performed to convert the panel test results to percent capture efficiency values.
    (iv) Records needed to document a capture efficiency determination using an alternative method or protocol, as specified in § 60.397a(f), if applicable.
  • (b) If the capture system does not meet both of the criteria in paragraphs (a)(1) and (2) of this section, then you must use one of the five procedures described in paragraphs (c) through (g) of this section to measure capture efficiency. For the protocols in paragraphs (c) and (d) of this section, the capture efficiency measurement must consist of three test runs. Each test run must be at least 3 hours duration or the length of a production run, whichever is longer, up to 8 hours. For the purposes of this test, a production run means the time required for a single part to go from the beginning to the end of production, which includes surface preparation activities and drying or curing time.

Citations to §60.397a(g)

  • (7) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in § 60.397a(b) through (g), including the records specified in paragraphs (k)(7)(i) through (iv) of this section that apply to you.
    (i) Records for a liquid-to-uncaptured-gas protocol using a temporary total enclosure or building enclosure. Records of the mass of total VOC, as measured by Method 204A or F of appendix M to 40 CFR part 51, for each material used in the coating operation, and the total VOC for all materials used during each capture efficiency test run, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (ii) Records of the mass of VOC emissions captured by the emission capture system, as measured by Method 204B or C of appendix M to 40 CFR part 51, at the inlet to the add-on control device, including a copy of the test report. Records of the mass of VOC emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run, as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.
    (iii) Records needed to document a capture efficiency determination using a panel test as described in § 60.397a(e) and (g), including a copy of the test report and calculations performed to convert the panel test results to percent capture efficiency values.
    (iv) Records needed to document a capture efficiency determination using an alternative method or protocol, as specified in § 60.397a(f), if applicable.
  • (b) If the capture system does not meet both of the criteria in paragraphs (a)(1) and (2) of this section, then you must use one of the five procedures described in paragraphs (c) through (g) of this section to measure capture efficiency. For the protocols in paragraphs (c) and (d) of this section, the capture efficiency measurement must consist of three test runs. Each test run must be at least 3 hours duration or the length of a production run, whichever is longer, up to 8 hours. For the purposes of this test, a production run means the time required for a single part to go from the beginning to the end of production, which includes surface preparation activities and drying or curing time.