US Codex
C.F.R.
Browse by date
Notes

§60.372a. Standards for lead. — Inbound Citations

40 C.F.R. § 60.372a

Cited by 24 regulations in release Current.

Citations to 40 U.S.C. § 60.372a as a whole

  • (b) After the initial performance test required in § 60.8(a), you must conduct subsequent performance tests to demonstrate compliance with the lead and opacity standards in § 60.372a. Performance testing must be conducted for each affected source subject to lead and opacity standards in § 60.372a, that has not had a performance test within the last 5 years, except as described in paragraph (c) of this section. Thereafter, subsequent performance tests for each affected source must be completed no less frequently than every 5 years from the date the emissions source was last tested.

Citations to §60.372a(a)

  • (4) Conduct a visible emissions observation using EPA Method 9 (6 minutes) or EPA Method 22 (5 minutes) of appendix A to this part while the process is in operation to verify that no visible emissions are occurring at the discharge point to the atmosphere from any emissions source subject to the requirements of § 60.372a(a) or (b). The visible emissions observation must be conducted at least twice daily (at least 6 hours apart) if the results of the most recent performance test indicate that emissions are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The visible emissions observation must be conducted at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If visible emissions are detected, you must record the incident and submit this information in an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c) and take immediate corrective action. You must also record the corrective actions taken. These corrective actions may include, but are not limited to, those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(a)(1)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).
  • (3) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions from the facility are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but not be limited to those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(a)(2)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).
  • (3) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions from the facility are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but not be limited to those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(a)(3)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).
  • (3) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions from the facility are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but not be limited to those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(a)(4)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).
  • (3) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions from the facility are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but not be limited to those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(a)(5)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).
  • (3) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions from the facility are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but not be limited to those provided in paragraphs (b)(3)(i) through (iv) of this section.
  • (4) The owner or operator of lead oxide manufacturing facility must determine compliance with the lead standard in § 60.372a(a)(5) as follows:
    (i) The emission rate (E) from lead oxide manufacturing facility must be computed for each run using equation 2 to this paragraph (d)(4)(i) as follows:
    (ii) The average lead feed rate (P) must be determined for each run using equation 3 to this paragraph (d)(4)(ii) as follows:

Citations to §60.372a(a)(6)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).
  • (3) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions from the facility are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but not be limited to those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(a)(7)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).

Citations to §60.372a(a)(8)

  • (a) On and after the date on which the performance test required to be conducted by § 60.8 is completed, no owner or operator subject to the provisions of this subpart may cause the emissions listed in paragraphs (a)(1) through (8) of this section to be discharged into the atmosphere. The emission limitations and opacity limitations listed in paragraphs (a)(1) through (8) of this section apply at all times, including periods of startup, shutdown and malfunction. As provided in § 60.11(f), this paragraph (a) supersedes the exemptions for periods of startup, shutdown, and malfunction in the general provisions in subpart A of this part. You must also comply with the requirements in paragraphs (b) and (c) of this section.
    (1) From any grid casting facility, any gases that contain lead in excess of 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf).
    (2) From any paste mixing facility, any gases that contain in excess of 0.10 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf) or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing sources. If a facility is complying with the 0.9 gram of lead per hour, you must sum the emission rate from all the paste mixing sources.
    (3) From any three-process operation facility, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (4) From any lead oxide manufacturing facility, any gases that contain in excess of 5.0 milligrams of lead per kilogram of lead feed (0.010 lb/ton).
    (5) From any lead reclamation facility, any gases that contain in excess of 0.45 milligrams of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf).
    (6) From any other lead-emitting operation, any gases that contain in excess of 1.00 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf).
    (7) From any affected facility other than a lead reclamation facility, any gases with greater than 0 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage or measured according to EPA Method 22 of appendix A to this part).
    (8) From any lead reclamation facility, any gases with greater than 5 percent opacity (measured according to EPA Method 9 of appendix A to this part and rounded to the nearest whole percentage).

Citations to §60.372a(b)

  • (4) Conduct a visible emissions observation using EPA Method 9 (6 minutes) or EPA Method 22 (5 minutes) of appendix A to this part while the process is in operation to verify that no visible emissions are occurring at the discharge point to the atmosphere from any emissions source subject to the requirements of § 60.372a(a) or (b). The visible emissions observation must be conducted at least twice daily (at least 6 hours apart) if the results of the most recent performance test indicate that emissions are greater than 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). The visible emissions observation must be conducted at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the applicable lead emissions limit in § 60.372a(a)(1) through (6). If visible emissions are detected, you must record the incident and submit this information in an excess emissions and continuous monitoring system performance report and summary report required under § 60.375a(c) and take immediate corrective action. You must also record the corrective actions taken. These corrective actions may include, but are not limited to, those provided in paragraphs (b)(3)(i) through (iv) of this section.

Citations to §60.372a(c)

Citations to §60.372a(c)(2)(i)

  • (2) The fugitive dust mitigation plan must at a minimum include the requirements specified in paragraphs (c)(2)(i) through (iv) of this section.
    (i) Surfaces used for vehicular material transfer activity must be cleaned at least once per month, by wet wash or a vacuum equipped with a filter rated by the manufacturer to achieve 99.97 percent capture efficiency for 0.3 micron particles in a manner that does not generate fugitive lead dust, except when sand or a similar material has been spread on the area to provide traction on ice or snow.
    (ii) For any leak or spill that occurs during the unloading and storage process, complete washing or vacuuming the area to remove all spilled or leaked lead bearing material within 2 hours of the leak or spill occurrence.
    (iii) Dust forming materials (that contain lead or lead compounds) must be stored in sealed, leak-proof containers or in a total enclosure.
    (iv) The fugitive dust mitigation plan must specify that records be maintained of all cleaning performed under paragraph (c)(2)(i) and (ii) of this section.

Citations to §60.372a(c)(2)(ii)

  • (2) The fugitive dust mitigation plan must at a minimum include the requirements specified in paragraphs (c)(2)(i) through (iv) of this section.
    (i) Surfaces used for vehicular material transfer activity must be cleaned at least once per month, by wet wash or a vacuum equipped with a filter rated by the manufacturer to achieve 99.97 percent capture efficiency for 0.3 micron particles in a manner that does not generate fugitive lead dust, except when sand or a similar material has been spread on the area to provide traction on ice or snow.
    (ii) For any leak or spill that occurs during the unloading and storage process, complete washing or vacuuming the area to remove all spilled or leaked lead bearing material within 2 hours of the leak or spill occurrence.
    (iii) Dust forming materials (that contain lead or lead compounds) must be stored in sealed, leak-proof containers or in a total enclosure.
    (iv) The fugitive dust mitigation plan must specify that records be maintained of all cleaning performed under paragraph (c)(2)(i) and (ii) of this section.

Citations to §60.372a(c)(2)(iii)

  • (2) The fugitive dust mitigation plan must at a minimum include the requirements specified in paragraphs (c)(2)(i) through (iv) of this section.
    (i) Surfaces used for vehicular material transfer activity must be cleaned at least once per month, by wet wash or a vacuum equipped with a filter rated by the manufacturer to achieve 99.97 percent capture efficiency for 0.3 micron particles in a manner that does not generate fugitive lead dust, except when sand or a similar material has been spread on the area to provide traction on ice or snow.
    (ii) For any leak or spill that occurs during the unloading and storage process, complete washing or vacuuming the area to remove all spilled or leaked lead bearing material within 2 hours of the leak or spill occurrence.
    (iii) Dust forming materials (that contain lead or lead compounds) must be stored in sealed, leak-proof containers or in a total enclosure.
    (iv) The fugitive dust mitigation plan must specify that records be maintained of all cleaning performed under paragraph (c)(2)(i) and (ii) of this section.

Citations to §60.372a(c)(2)(iv)

  • (2) The fugitive dust mitigation plan must at a minimum include the requirements specified in paragraphs (c)(2)(i) through (iv) of this section.
    (i) Surfaces used for vehicular material transfer activity must be cleaned at least once per month, by wet wash or a vacuum equipped with a filter rated by the manufacturer to achieve 99.97 percent capture efficiency for 0.3 micron particles in a manner that does not generate fugitive lead dust, except when sand or a similar material has been spread on the area to provide traction on ice or snow.
    (ii) For any leak or spill that occurs during the unloading and storage process, complete washing or vacuuming the area to remove all spilled or leaked lead bearing material within 2 hours of the leak or spill occurrence.
    (iii) Dust forming materials (that contain lead or lead compounds) must be stored in sealed, leak-proof containers or in a total enclosure.
    (iv) The fugitive dust mitigation plan must specify that records be maintained of all cleaning performed under paragraph (c)(2)(i) and (ii) of this section.

Citations to §60.372a(c)(iv)

  • (2) The fugitive dust mitigation plan must at a minimum include the requirements specified in paragraphs (c)(2)(i) through (iv) of this section.
    (i) Surfaces used for vehicular material transfer activity must be cleaned at least once per month, by wet wash or a vacuum equipped with a filter rated by the manufacturer to achieve 99.97 percent capture efficiency for 0.3 micron particles in a manner that does not generate fugitive lead dust, except when sand or a similar material has been spread on the area to provide traction on ice or snow.
    (ii) For any leak or spill that occurs during the unloading and storage process, complete washing or vacuuming the area to remove all spilled or leaked lead bearing material within 2 hours of the leak or spill occurrence.
    (iii) Dust forming materials (that contain lead or lead compounds) must be stored in sealed, leak-proof containers or in a total enclosure.
    (iv) The fugitive dust mitigation plan must specify that records be maintained of all cleaning performed under paragraph (c)(2)(i) and (ii) of this section.