§60.334. Monitoring of operations. — Inbound Citations

40 C.F.R. § 60.334

Cited by 21 regulations in release Current.

Citations to §60.334(a)

  • (4) If water or steam injection is used to control NOX with no additional post-combustion NOX control and the owner or operator chooses to monitor the steam or water to fuel ratio in accordance with § 60.334(a), then that monitoring system must be operated concurrently with each EPA Method 20, ASTM D6522-00 (incorporated by reference, see § 60.17), or EPA Method 7E run and shall be used to determine the fuel consumption and the steam or water to fuel ratio necessary to comply with the applicable § 60.332 NOX emission limit.

Citations to §60.334(b)

Citations to §60.334(b)(3)(ii)

  • (C) Each report shall include the average steam or water to fuel ratio, average fuel consumption, ambient conditions (temperature, pressure, and humidity), gas turbine load, and (if applicable) the nitrogen content of the fuel during each excess emission. You do not have to report ambient conditions if you opt to use the worst case ISO correction factor as specified in § 60.334(b)(3)(ii), or if you are not using the ISO correction equation under the provisions of § 60.335(b)(1).

Citations to §60.334(e)

  • (7) If the owner or operator elects to install and certify a NOX CEMS under § 60.334(e), then the initial performance test required under § 60.8 may be done in the following alternative manner:
    (i) Perform a minimum of 9 reference method runs, with a minimum time per run of 21 minutes, at a single load level, between 90 and 100 percent of peak (or the highest physically achievable) load while the source is combusting the fuel that is a normal primary fuel for that source.
    (ii) Use the test data both to demonstrate compliance with the applicable NOX emission limit under § 60.332 and to provide the required reference method data for the RATA of the CEMS described under § 60.334(b).

Citations to §60.334(f)

  • (8) If the owner or operator elects under § 60.334(f) to monitor combustion parameters or parameters indicative of proper operation of NOX emission controls, the appropriate parameters shall be continuously monitored and recorded during each run of the initial performance test, to establish acceptable operating ranges, for purposes of the parameter monitoring plan for the affected unit, as specified in § 60.334(g).

Citations to §60.334(g)

  • (8) If the owner or operator elects under § 60.334(f) to monitor combustion parameters or parameters indicative of proper operation of NOX emission controls, the appropriate parameters shall be continuously monitored and recorded during each run of the initial performance test, to establish acceptable operating ranges, for purposes of the parameter monitoring plan for the affected unit, as specified in § 60.334(g).

Citations to §60.334(h)

Citations to §60.334(i)(1)

  • (10) If the owner or operator is required under § 60.334(i)(1) or (3) to periodically determine the sulfur content of the fuel combusted in the turbine, a minimum of three fuel samples shall be collected during the performance test. Analyze the samples for the total sulfur content of the fuel using:
    (i) For liquid fuels, ASTM D129-00, D2622-98, D4294-02, D1266-98, D5453-00 or D1552-01 (all of which are incorporated by reference, see § 60.17); or
    (ii) For gaseous fuels, ASTM D1072-80, D1072-90 (Reapproved 1994); D3246-81, D3246-92, D3246-96; D4468-85 (Reapproved 2000); or D6667-01 (all of which are incorporated by reference, see § 60.17). The applicable ranges of some ASTM methods mentioned above are not adequate to measure the levels of sulfur in some fuel gases. Dilution of samples before analysis (with verification of the dilution ratio) may be used, subject to the prior approval of the Administrator.

Citations to §60.334(i)(3)

  • (10) If the owner or operator is required under § 60.334(i)(1) or (3) to periodically determine the sulfur content of the fuel combusted in the turbine, a minimum of three fuel samples shall be collected during the performance test. Analyze the samples for the total sulfur content of the fuel using:
    (i) For liquid fuels, ASTM D129-00, D2622-98, D4294-02, D1266-98, D5453-00 or D1552-01 (all of which are incorporated by reference, see § 60.17); or
    (ii) For gaseous fuels, ASTM D1072-80, D1072-90 (Reapproved 1994); D3246-81, D3246-92, D3246-96; D4468-85 (Reapproved 2000); or D6667-01 (all of which are incorporated by reference, see § 60.17). The applicable ranges of some ASTM methods mentioned above are not adequate to measure the levels of sulfur in some fuel gases. Dilution of samples before analysis (with verification of the dilution ratio) may be used, subject to the prior approval of the Administrator.

Citations to §60.334(k)(5)(i)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(5)(ii)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(5)(iii)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(5)(iv)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(5)(v)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(5)(vi)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(5)(vii)

  • (5) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with that reporting requirement. To assert a claim of EPA system outage, you must meet the requirements outlined in paragraphs (k)(5)(i) through (vii) of this section.
    (i) You must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.
    (ii) The outage must have occurred within the period of time beginning 5 business days prior to the date that the submission is due.
    (iii) The outage may be planned or unplanned.
    (iv) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (v) You must provide to the Administrator a written description identifying:
    (A) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (vi) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (vii) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

Citations to §60.334(k)(6)(i)

  • (6) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (k)(6)(i) through (v) of this section.
    (i) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (ii) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (iii) You must provide to the Administrator:
    (A) A written description of the force majeure event;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (iv) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (v) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.334(k)(6)(ii)

  • (6) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (k)(6)(i) through (v) of this section.
    (i) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (ii) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (iii) You must provide to the Administrator:
    (A) A written description of the force majeure event;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (iv) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (v) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.334(k)(6)(iii)

  • (6) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (k)(6)(i) through (v) of this section.
    (i) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (ii) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (iii) You must provide to the Administrator:
    (A) A written description of the force majeure event;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (iv) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (v) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.334(k)(6)(iv)

  • (6) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (k)(6)(i) through (v) of this section.
    (i) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (ii) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (iii) You must provide to the Administrator:
    (A) A written description of the force majeure event;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (iv) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (v) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

Citations to §60.334(k)(6)(v)

  • (6) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with that reporting requirement. To assert a claim of force majeure, you must meet the requirements outlined in paragraphs (k)(6)(i) through (v) of this section.
    (i) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this section, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).
    (ii) You must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.
    (iii) You must provide to the Administrator:
    (A) A written description of the force majeure event;
    (B) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;
    (C) A description of measures taken or to be taken to minimize the delay in reporting; and
    (D) The date by which you propose to report, or if you have already met the reporting requirement at the time of notification, the date you reported.
    (iv) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.
    (v) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.