§60.2860. What are the emission limitations for air curtain incinerators?

40 C.F.R. § 60.2860

After the date the initial stack test is required or completed (whichever is earlier), you must meet the limitations in paragraphs (a) and (b) of this section:
(a)
Maintain opacity to less than or equal to 10 percent opacity (as determined by the average of three 1-hour blocks consisting of ten 6-minute average opacity values), except as described in paragraph (b) of this section; and
(b)
Maintain opacity to less than or equal to 35 percent opacity (as determined by the average of three 1-hour blocks consisting of ten 6-minute average opacity values) during the startup period that is within the first 30 minutes of operation.
Notes, amendments, and revision history

Source

Source: 84 FR 15884, Apr. 16, 2019, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.