US Codex
C.F.R.
Browse by date
Notes

§57.601. General requirements. — Inbound Citations

40 C.F.R. § 57.601

Cited by 1 regulation in release Current.

Citations to 40 U.S.C. § 57.601 as a whole

  • (a) The smelter owner's NSO application shall include a proposed NSO provision for implementing the requirement of § 57.601, a fully documented supporting analysis of the proposed program, and an evaluation of the consistency of the proposed program with the criteria listed in § 57.603. The application shall also specify:
    (1) The design and substantive elements of the research and development program, including the expected amount of time required for their implementation;
    (2) The annual expected capital, operating, and other costs of each element in the program;
    (3) The smelter's current production processes, pollution control equipment, and emissions which are likely to be affected by the program;
    (4) Potential or expected benefits of the program;
    (5) The basis upon which the results of the program will be evaluated; and
    (6) The names, positions, and qualifications of the individuals responsible for conducting and supervising the project.