§57.402. Elements of the supplementary control system. — Inbound Citations

40 C.F.R. § 57.402

Cited by 8 regulations in release Current.

Citations to §57.402(a)

Citations to §57.402(b)

Citations to §57.402(c)

Citations to §57.402(d)

Citations to §57.402(e)

  • (b) Operation in accordance with the revised provisions of an SCS operational manual (see § 57.402(e)) shall not be considered a violation of an NSO while the application for approval of those revisions as NSO amendments is pending before the issuing agency (or EPA) for approval: Provided, that:
    (1) No violations of NAAQS occur in the smelter's Designated Liability Area during that time; and
    (2) The smelter operator has not been informed by the issuing agency or EPA that its application is not adequately documented, unless such deficiency has been remedied promptly.
  • (3) Each NSO application shall include a specific plan for the development of a system fulfilling the requirements of § 57.402(a), (b), and (e) (covering air quality monitoring network, meteorological network, and the SCS operational manual).

Citations to §57.402(f)

  • (2) Each NSO application shall contain proposed NSO provisions for compliance with the requirements of §§ 57.401, 57.402 (c), (d), and (f), 57.403, 57.404, and 57.405 (b)(2).
  • Each NSO shall require the smelter owner to conduct an active program to continuously review the effectiveness of the fugitive emission control measures implemented pursuant to § 57.503 in maintaining the NAAQS and, if such measures are not sufficiently effective, to evaluate what additional measures should be taken to assure that the NAAQS will be maintained with a reasonably degree of reliability. The NSO shall also require submission of a semi-annual report to the issuing Agency detailing the results of this review and evaluation. Such a report may be submitted as part of the report required under § 57.402(f).