§57.201. Where to apply. — Inbound Citations
40 C.F.R. § 57.201
Statutory Authority
Cited by 9 regulations in release Current.
Citations to 40 C.F.R. § 57.201 as a whole
-
(1) Within the period referred to in paragraph (a) of this section, the smelter owner shall submit its completed application pursuant to § 57.201. Receipt of all parts of a substantially complete application postmarked within the original or extended application period shall be deemed to continue the suspension of the SIP emission limitation for SO2 until the issuing agency issues or declines to issue an NSO. This suspension shall in all cases terminate, however, 90 days after receipt of the substantially completed application, unless extended for good cause at the discretion of the Administrator. If, in the Administrator's judgment, good faith effort has been made to submit a complete application, additional time may be granted to allow for correction of minor deficiencies.
Citations to §57.201(d)
-
(a) Each SIP Compliance Schedule required by § 57.201(d) (2) and (3) must contain the following elements:(1) Description of the overall design of the SO2 control system(s) to be installed;(2) Descriptions of specific process hardware to be used in achieving compliance with the SIP emission limitation including gas capacity values;(3) The date by which contracts will be let or purchase orders issued to accomplish any necessary performance improvements;(4) The date for initiating on-site construction or installation of necessary equipment;(5) The date by which on-site construction or installation of equipment is to be completed;(6) The date for achievement of final compliance with SIP emission limitations; and(7) Any other measures necessary to assure compliance with all SIP requirements as expeditiously as practicable.
Citations to §57.201(d)(1)
-
(3) The Administrator determines, based on a showing by the smelter owner, that no means of emission limitation applicable to the smelter which would enable it to comply with its SIP stack emission limitation for SO2 has been adequately demonstrated to be reasonably available (taking into account the cost of compliance, nonair quality health and environmental impact, and energy considerations) in accordance with § 57.201(d)(1).
Citations to §57.201(d)(2)
-
(1) A smelter desiring an NSO shall apply for an NSO by submitting an application under subpart B including the financial information required in appendix A and including the information necessary to make the determinations required by this subparagraph and § 57.201(d)(2). The issuing agency shall analyze the financial information according to the financial eligibility test prescribed by subpart A and described in appendix A. The issuing Agency shall then determine whether the smelter is able to comply with its SIP on or before the date required in the SIP by installing adequately demonstrated technology which is reasonably available. See also § 57.102(a)(3). If the test demonstrates that adequately demonstrated technology is not reasonably available to the smelter to allow it to comply with the SIP by the required compliance date, the smelter is eligible for an NSO.
-
(b) Each smelter owner shall make the showing required by § 57.102(a)(3) by completing and submitting appendix A to this part and any necessary supplemental information to the issuing agency as a part of its application. Each smelter shall also submit as part of its application the information which, in conjunction with the information required by appendix A, is necessary for the issuing agency to make the determination required by § 57.201(d)(2). Any smelter owner or State may, at its option, simultaneously submit this material to EPA for an advance eligibility determination.
-
(a) This section applies to all smelters which receive an NSO, but only to the extent this section is compatible with any SIP compliance schedule required by §§ 57.201(d)(2) and 57.705.
Citations to §57.201(d)(2)(ii)
-
(iii) If no adequately demonstrated technology is found to be reasonably available to enable a smelter to comply by January 1, 1988, it would be excused from the compliance schedule requirement in § 57.201(d)(2)(ii), but it would be subject to reevaluation of its ability to comply by that date at any time during the term of the NSO. (See § 57.201(d)(3)).
Citations to §57.201(d)(3)
-
(iii) If no adequately demonstrated technology is found to be reasonably available to enable a smelter to comply by January 1, 1988, it would be excused from the compliance schedule requirement in § 57.201(d)(2)(ii), but it would be subject to reevaluation of its ability to comply by that date at any time during the term of the NSO. (See § 57.201(d)(3)).
-
(b) Upon receipt of any supplementary information required under paragraph (a), the issuing agency shall promptly reevaluate the availability of the means of compliance with the new SIP limit under the NSO eligibility tests specified in § 57.102(b)(3). If the issuing agency determines that the demonstrated control technology necessary to attain the new SO2 SIP limit is adequately demonstrated to be reasonably available under the eligibility tests, so as to permit the smelter to comply with the new SIP limit on or before January 1, 1988, the NSO shall be amended within the time contemplated by § 57.202(a) after receipt of the supplementary information. Such amendment shall require compliance with the new SO2 SIP limit as expeditiously as practicable in accordance with § 57.201(d)(3). The issuing agency, if not EPA, shall promptly submit its determination and any necessary NSO amendments to EPA.