§52.285. Review of new sources and modifications—Mojave Desert Air Quality Management District. — Inbound Citations
40 C.F.R. § 52.285
Statutory Authority
Cited by 19 regulations in release Current.
Citations to §52.285(b)(1)
-
(b) For the purposes of the plan, the definitions in 40 CFR part 51, appendix S, paragraph II.A, and 40 CFR 51.100 apply, except for paragraphs (b)(1) through (6) of this section, which replace the corresponding definitions found in part 51, appendix S:(1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with paragraphs (b)(1)(i) and (ii) of this section, except that this paragraph (b)(1) shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under paragraph IV.K of 40 CFR part 51, appendix S. Instead, 40 CFR part 51, appendix S, paragraphs II.A.24 and 30, shall apply for those purposes.(i) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The reviewing authority shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.(ii) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.(2) Enforceable as a practical matter means that an emission limitation or other standard is both legally and practicably enforceable as follows:(i) An emission limitation or other standard is legally enforceable if the reviewing authority has the legal power to enforce it.(ii) Practical enforceability for an emission limitation or for other standards (design standards, equipment standards, work practices, operational standards, pollution prevention techniques) in a permit for a source is achieved if the permit's provisions specify:(A) A limitation or standard and the emissions units or activities at the source subject to the limitation or standard;(B) The time period for the limitation or standard (e.g., hourly, daily, monthly and/or annual limits such as rolling annual limits); and(C) The method to determine compliance, including appropriate monitoring, recordkeeping, reporting, and testing.(3) Environmental Appeals Board means the Board within the EPA described in 40 CFR 1.25(e).(4) Nonattainment pollutant means any regulated NSR pollutant for which the MDAQMD, or portion of the MDAQMD, has been designated as nonattainment, as codified in 40 CFR 81.305, as well as any precursor of such regulated NSR pollutant specified in 40 CFR part 51, appendix S, paragraph II.A.31.(ii)(b).(5) Reviewing authority means the Administrator of EPA Region IX, but it may include the MDAQMD if the Administrator delegates the power to administer the FIP under paragraph (g) of this section.(6) means, in reference to an emissions increase or a net emissions increase, and notwithstanding the definition of “significant” in 40 CFR part 51, appendix S, paragraph II.A.10, any increase in actual emissions of volatile organic compounds or oxides of nitrogen that would result from any physical change in, or change in the method of operation of, a major stationary source locating in a serious or severe ozone nonattainment area if such emissions increase of volatile organic compounds or oxides of nitrogen exceeds 25 tons per year when aggregated with all other net emissions increases from the source over any period of 5 consecutive calendar years that includes the calendar year in which such increase occurred.
Citations to §52.285(b)(2)
-
(b) For the purposes of the plan, the definitions in 40 CFR part 51, appendix S, paragraph II.A, and 40 CFR 51.100 apply, except for paragraphs (b)(1) through (6) of this section, which replace the corresponding definitions found in part 51, appendix S:(1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with paragraphs (b)(1)(i) and (ii) of this section, except that this paragraph (b)(1) shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under paragraph IV.K of 40 CFR part 51, appendix S. Instead, 40 CFR part 51, appendix S, paragraphs II.A.24 and 30, shall apply for those purposes.(i) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The reviewing authority shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.(ii) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.(2) Enforceable as a practical matter means that an emission limitation or other standard is both legally and practicably enforceable as follows:(i) An emission limitation or other standard is legally enforceable if the reviewing authority has the legal power to enforce it.(ii) Practical enforceability for an emission limitation or for other standards (design standards, equipment standards, work practices, operational standards, pollution prevention techniques) in a permit for a source is achieved if the permit's provisions specify:(A) A limitation or standard and the emissions units or activities at the source subject to the limitation or standard;(B) The time period for the limitation or standard (e.g., hourly, daily, monthly and/or annual limits such as rolling annual limits); and(C) The method to determine compliance, including appropriate monitoring, recordkeeping, reporting, and testing.(3) Environmental Appeals Board means the Board within the EPA described in 40 CFR 1.25(e).(4) Nonattainment pollutant means any regulated NSR pollutant for which the MDAQMD, or portion of the MDAQMD, has been designated as nonattainment, as codified in 40 CFR 81.305, as well as any precursor of such regulated NSR pollutant specified in 40 CFR part 51, appendix S, paragraph II.A.31.(ii)(b).(5) Reviewing authority means the Administrator of EPA Region IX, but it may include the MDAQMD if the Administrator delegates the power to administer the FIP under paragraph (g) of this section.(6) means, in reference to an emissions increase or a net emissions increase, and notwithstanding the definition of “significant” in 40 CFR part 51, appendix S, paragraph II.A.10, any increase in actual emissions of volatile organic compounds or oxides of nitrogen that would result from any physical change in, or change in the method of operation of, a major stationary source locating in a serious or severe ozone nonattainment area if such emissions increase of volatile organic compounds or oxides of nitrogen exceeds 25 tons per year when aggregated with all other net emissions increases from the source over any period of 5 consecutive calendar years that includes the calendar year in which such increase occurred.
Citations to §52.285(b)(3)
-
(b) For the purposes of the plan, the definitions in 40 CFR part 51, appendix S, paragraph II.A, and 40 CFR 51.100 apply, except for paragraphs (b)(1) through (6) of this section, which replace the corresponding definitions found in part 51, appendix S:(1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with paragraphs (b)(1)(i) and (ii) of this section, except that this paragraph (b)(1) shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under paragraph IV.K of 40 CFR part 51, appendix S. Instead, 40 CFR part 51, appendix S, paragraphs II.A.24 and 30, shall apply for those purposes.(i) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The reviewing authority shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.(ii) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.(2) Enforceable as a practical matter means that an emission limitation or other standard is both legally and practicably enforceable as follows:(i) An emission limitation or other standard is legally enforceable if the reviewing authority has the legal power to enforce it.(ii) Practical enforceability for an emission limitation or for other standards (design standards, equipment standards, work practices, operational standards, pollution prevention techniques) in a permit for a source is achieved if the permit's provisions specify:(A) A limitation or standard and the emissions units or activities at the source subject to the limitation or standard;(B) The time period for the limitation or standard (e.g., hourly, daily, monthly and/or annual limits such as rolling annual limits); and(C) The method to determine compliance, including appropriate monitoring, recordkeeping, reporting, and testing.(3) Environmental Appeals Board means the Board within the EPA described in 40 CFR 1.25(e).(4) Nonattainment pollutant means any regulated NSR pollutant for which the MDAQMD, or portion of the MDAQMD, has been designated as nonattainment, as codified in 40 CFR 81.305, as well as any precursor of such regulated NSR pollutant specified in 40 CFR part 51, appendix S, paragraph II.A.31.(ii)(b).(5) Reviewing authority means the Administrator of EPA Region IX, but it may include the MDAQMD if the Administrator delegates the power to administer the FIP under paragraph (g) of this section.(6) means, in reference to an emissions increase or a net emissions increase, and notwithstanding the definition of “significant” in 40 CFR part 51, appendix S, paragraph II.A.10, any increase in actual emissions of volatile organic compounds or oxides of nitrogen that would result from any physical change in, or change in the method of operation of, a major stationary source locating in a serious or severe ozone nonattainment area if such emissions increase of volatile organic compounds or oxides of nitrogen exceeds 25 tons per year when aggregated with all other net emissions increases from the source over any period of 5 consecutive calendar years that includes the calendar year in which such increase occurred.
Citations to §52.285(b)(4)
-
(b) For the purposes of the plan, the definitions in 40 CFR part 51, appendix S, paragraph II.A, and 40 CFR 51.100 apply, except for paragraphs (b)(1) through (6) of this section, which replace the corresponding definitions found in part 51, appendix S:(1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with paragraphs (b)(1)(i) and (ii) of this section, except that this paragraph (b)(1) shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under paragraph IV.K of 40 CFR part 51, appendix S. Instead, 40 CFR part 51, appendix S, paragraphs II.A.24 and 30, shall apply for those purposes.(i) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The reviewing authority shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.(ii) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.(2) Enforceable as a practical matter means that an emission limitation or other standard is both legally and practicably enforceable as follows:(i) An emission limitation or other standard is legally enforceable if the reviewing authority has the legal power to enforce it.(ii) Practical enforceability for an emission limitation or for other standards (design standards, equipment standards, work practices, operational standards, pollution prevention techniques) in a permit for a source is achieved if the permit's provisions specify:(A) A limitation or standard and the emissions units or activities at the source subject to the limitation or standard;(B) The time period for the limitation or standard (e.g., hourly, daily, monthly and/or annual limits such as rolling annual limits); and(C) The method to determine compliance, including appropriate monitoring, recordkeeping, reporting, and testing.(3) Environmental Appeals Board means the Board within the EPA described in 40 CFR 1.25(e).(4) Nonattainment pollutant means any regulated NSR pollutant for which the MDAQMD, or portion of the MDAQMD, has been designated as nonattainment, as codified in 40 CFR 81.305, as well as any precursor of such regulated NSR pollutant specified in 40 CFR part 51, appendix S, paragraph II.A.31.(ii)(b).(5) Reviewing authority means the Administrator of EPA Region IX, but it may include the MDAQMD if the Administrator delegates the power to administer the FIP under paragraph (g) of this section.(6) means, in reference to an emissions increase or a net emissions increase, and notwithstanding the definition of “significant” in 40 CFR part 51, appendix S, paragraph II.A.10, any increase in actual emissions of volatile organic compounds or oxides of nitrogen that would result from any physical change in, or change in the method of operation of, a major stationary source locating in a serious or severe ozone nonattainment area if such emissions increase of volatile organic compounds or oxides of nitrogen exceeds 25 tons per year when aggregated with all other net emissions increases from the source over any period of 5 consecutive calendar years that includes the calendar year in which such increase occurred.
Citations to §52.285(b)(5)
-
(b) For the purposes of the plan, the definitions in 40 CFR part 51, appendix S, paragraph II.A, and 40 CFR 51.100 apply, except for paragraphs (b)(1) through (6) of this section, which replace the corresponding definitions found in part 51, appendix S:(1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with paragraphs (b)(1)(i) and (ii) of this section, except that this paragraph (b)(1) shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under paragraph IV.K of 40 CFR part 51, appendix S. Instead, 40 CFR part 51, appendix S, paragraphs II.A.24 and 30, shall apply for those purposes.(i) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The reviewing authority shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.(ii) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.(2) Enforceable as a practical matter means that an emission limitation or other standard is both legally and practicably enforceable as follows:(i) An emission limitation or other standard is legally enforceable if the reviewing authority has the legal power to enforce it.(ii) Practical enforceability for an emission limitation or for other standards (design standards, equipment standards, work practices, operational standards, pollution prevention techniques) in a permit for a source is achieved if the permit's provisions specify:(A) A limitation or standard and the emissions units or activities at the source subject to the limitation or standard;(B) The time period for the limitation or standard (e.g., hourly, daily, monthly and/or annual limits such as rolling annual limits); and(C) The method to determine compliance, including appropriate monitoring, recordkeeping, reporting, and testing.(3) Environmental Appeals Board means the Board within the EPA described in 40 CFR 1.25(e).(4) Nonattainment pollutant means any regulated NSR pollutant for which the MDAQMD, or portion of the MDAQMD, has been designated as nonattainment, as codified in 40 CFR 81.305, as well as any precursor of such regulated NSR pollutant specified in 40 CFR part 51, appendix S, paragraph II.A.31.(ii)(b).(5) Reviewing authority means the Administrator of EPA Region IX, but it may include the MDAQMD if the Administrator delegates the power to administer the FIP under paragraph (g) of this section.(6) means, in reference to an emissions increase or a net emissions increase, and notwithstanding the definition of “significant” in 40 CFR part 51, appendix S, paragraph II.A.10, any increase in actual emissions of volatile organic compounds or oxides of nitrogen that would result from any physical change in, or change in the method of operation of, a major stationary source locating in a serious or severe ozone nonattainment area if such emissions increase of volatile organic compounds or oxides of nitrogen exceeds 25 tons per year when aggregated with all other net emissions increases from the source over any period of 5 consecutive calendar years that includes the calendar year in which such increase occurred.
Citations to §52.285(b)(6)
-
(b) For the purposes of the plan, the definitions in 40 CFR part 51, appendix S, paragraph II.A, and 40 CFR 51.100 apply, except for paragraphs (b)(1) through (6) of this section, which replace the corresponding definitions found in part 51, appendix S:(1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with paragraphs (b)(1)(i) and (ii) of this section, except that this paragraph (b)(1) shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under paragraph IV.K of 40 CFR part 51, appendix S. Instead, 40 CFR part 51, appendix S, paragraphs II.A.24 and 30, shall apply for those purposes.(i) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The reviewing authority shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.(ii) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.(2) Enforceable as a practical matter means that an emission limitation or other standard is both legally and practicably enforceable as follows:(i) An emission limitation or other standard is legally enforceable if the reviewing authority has the legal power to enforce it.(ii) Practical enforceability for an emission limitation or for other standards (design standards, equipment standards, work practices, operational standards, pollution prevention techniques) in a permit for a source is achieved if the permit's provisions specify:(A) A limitation or standard and the emissions units or activities at the source subject to the limitation or standard;(B) The time period for the limitation or standard (e.g., hourly, daily, monthly and/or annual limits such as rolling annual limits); and(C) The method to determine compliance, including appropriate monitoring, recordkeeping, reporting, and testing.(3) Environmental Appeals Board means the Board within the EPA described in 40 CFR 1.25(e).(4) Nonattainment pollutant means any regulated NSR pollutant for which the MDAQMD, or portion of the MDAQMD, has been designated as nonattainment, as codified in 40 CFR 81.305, as well as any precursor of such regulated NSR pollutant specified in 40 CFR part 51, appendix S, paragraph II.A.31.(ii)(b).(5) Reviewing authority means the Administrator of EPA Region IX, but it may include the MDAQMD if the Administrator delegates the power to administer the FIP under paragraph (g) of this section.(6) means, in reference to an emissions increase or a net emissions increase, and notwithstanding the definition of “significant” in 40 CFR part 51, appendix S, paragraph II.A.10, any increase in actual emissions of volatile organic compounds or oxides of nitrogen that would result from any physical change in, or change in the method of operation of, a major stationary source locating in a serious or severe ozone nonattainment area if such emissions increase of volatile organic compounds or oxides of nitrogen exceeds 25 tons per year when aggregated with all other net emissions increases from the source over any period of 5 consecutive calendar years that includes the calendar year in which such increase occurred.
Citations to §52.285(d)(2)(i)
-
(3) The owner or operator of any proposed new major stationary source or major modification shall submit a complete application using EPA Region IX's electronic system, which is described in paragraph (d)(3)(ii) of this section. The application must include the information listed in this paragraph (d)(3) as well as the demonstrations to show compliance with paragraphs (d)(2)(i) through (iv) of this section. The reviewing authority's designation that an application is complete for purposes of permit processing does not preclude the reviewing authority from requesting or accepting any additional information.(C) Identification and description of all emission points, including information regarding all nonattainment pollutants emitted by all emissions units included in the new source or modification.(D) A process description of all activities, including design capacity, that may generate emissions of nonattainment pollutants, in sufficient detail to establish the basis for the applicability of standards.(E) A projected schedule for commencing construction and operation for all emissions units included in the new source or modification.(G) A determination as to whether the new source or modification will result in any secondary emissions.(H) The emission rates of all regulated NSR pollutants, including fugitive and secondary emission rates, if applicable. The emission rates must be described in tons per year (tpy). If necessary, shorter-term rates must be described to allow for compliance using the applicable standard reference test method or other methodology specified (i.e., grams/liter, parts per million volume (ppmv) or parts per million weight (ppmw), lbs/MMBtu).(I) The calculations on which the emission rate information is based, including fuel specifications, if applicable, and any other assumptions used to determine the emission rates (e.g., higher heating value (HHV), sulfur content of natural gas, VOC content).(J) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.I and IV.J, that are used to determine applicability of the plan, including the emission calculations (increases or decreases) for each project that occurred during the contemporaneous period, as applicable.(K) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.A, used to determine the quantity of offsets required for the new source or modification.(L) Identification of actual emission reductions that meet the offset integrity criteria of being real, surplus, quantifiable, permanent and federally enforceable.(M) If applicable, a description of how performance testing will be conducted, including test methods and a general description of testing protocols.(N) (1) May adversely affect federally-listed threatened or endangered species or the designated critical habitat of such species; or(2) Has the potential to cause adverse effects on historic properties.(ii) To submit an application required under the plan, applicants may submit electronically through the Central Data Exchange (CDX)/Compliance and Emissions Data Reporting Interface (CEDRI) or submit by mail.(A) //cdx.epa.gov. First-time users will need to register with CDX. The CDX platform will also be used for any permit reporting requirements.(B) Applicants that do not apply using CDX/CEDRI shall mail a signed application using certified mail (do not request signature) to: Air and Radiation Division, Permits Office (Air-3-1), U.S. EPA, Region 9, 75 Hawthorne Street, San Francisco, CA 94105.(C) Applicants that apply using certified mail must email a copy of the application and the certified mail tracking number to provide notification of delivery receipt to [email protected].
Citations to §52.285(d)(2)(ii)
-
(3) The owner or operator of any proposed new major stationary source or major modification shall submit a complete application using EPA Region IX's electronic system, which is described in paragraph (d)(3)(ii) of this section. The application must include the information listed in this paragraph (d)(3) as well as the demonstrations to show compliance with paragraphs (d)(2)(i) through (iv) of this section. The reviewing authority's designation that an application is complete for purposes of permit processing does not preclude the reviewing authority from requesting or accepting any additional information.(C) Identification and description of all emission points, including information regarding all nonattainment pollutants emitted by all emissions units included in the new source or modification.(D) A process description of all activities, including design capacity, that may generate emissions of nonattainment pollutants, in sufficient detail to establish the basis for the applicability of standards.(E) A projected schedule for commencing construction and operation for all emissions units included in the new source or modification.(G) A determination as to whether the new source or modification will result in any secondary emissions.(H) The emission rates of all regulated NSR pollutants, including fugitive and secondary emission rates, if applicable. The emission rates must be described in tons per year (tpy). If necessary, shorter-term rates must be described to allow for compliance using the applicable standard reference test method or other methodology specified (i.e., grams/liter, parts per million volume (ppmv) or parts per million weight (ppmw), lbs/MMBtu).(I) The calculations on which the emission rate information is based, including fuel specifications, if applicable, and any other assumptions used to determine the emission rates (e.g., higher heating value (HHV), sulfur content of natural gas, VOC content).(J) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.I and IV.J, that are used to determine applicability of the plan, including the emission calculations (increases or decreases) for each project that occurred during the contemporaneous period, as applicable.(K) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.A, used to determine the quantity of offsets required for the new source or modification.(L) Identification of actual emission reductions that meet the offset integrity criteria of being real, surplus, quantifiable, permanent and federally enforceable.(M) If applicable, a description of how performance testing will be conducted, including test methods and a general description of testing protocols.(N) (1) May adversely affect federally-listed threatened or endangered species or the designated critical habitat of such species; or(2) Has the potential to cause adverse effects on historic properties.(ii) To submit an application required under the plan, applicants may submit electronically through the Central Data Exchange (CDX)/Compliance and Emissions Data Reporting Interface (CEDRI) or submit by mail.(A) //cdx.epa.gov. First-time users will need to register with CDX. The CDX platform will also be used for any permit reporting requirements.(B) Applicants that do not apply using CDX/CEDRI shall mail a signed application using certified mail (do not request signature) to: Air and Radiation Division, Permits Office (Air-3-1), U.S. EPA, Region 9, 75 Hawthorne Street, San Francisco, CA 94105.(C) Applicants that apply using certified mail must email a copy of the application and the certified mail tracking number to provide notification of delivery receipt to [email protected].
Citations to §52.285(d)(2)(iii)
-
(3) The owner or operator of any proposed new major stationary source or major modification shall submit a complete application using EPA Region IX's electronic system, which is described in paragraph (d)(3)(ii) of this section. The application must include the information listed in this paragraph (d)(3) as well as the demonstrations to show compliance with paragraphs (d)(2)(i) through (iv) of this section. The reviewing authority's designation that an application is complete for purposes of permit processing does not preclude the reviewing authority from requesting or accepting any additional information.(C) Identification and description of all emission points, including information regarding all nonattainment pollutants emitted by all emissions units included in the new source or modification.(D) A process description of all activities, including design capacity, that may generate emissions of nonattainment pollutants, in sufficient detail to establish the basis for the applicability of standards.(E) A projected schedule for commencing construction and operation for all emissions units included in the new source or modification.(G) A determination as to whether the new source or modification will result in any secondary emissions.(H) The emission rates of all regulated NSR pollutants, including fugitive and secondary emission rates, if applicable. The emission rates must be described in tons per year (tpy). If necessary, shorter-term rates must be described to allow for compliance using the applicable standard reference test method or other methodology specified (i.e., grams/liter, parts per million volume (ppmv) or parts per million weight (ppmw), lbs/MMBtu).(I) The calculations on which the emission rate information is based, including fuel specifications, if applicable, and any other assumptions used to determine the emission rates (e.g., higher heating value (HHV), sulfur content of natural gas, VOC content).(J) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.I and IV.J, that are used to determine applicability of the plan, including the emission calculations (increases or decreases) for each project that occurred during the contemporaneous period, as applicable.(K) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.A, used to determine the quantity of offsets required for the new source or modification.(L) Identification of actual emission reductions that meet the offset integrity criteria of being real, surplus, quantifiable, permanent and federally enforceable.(M) If applicable, a description of how performance testing will be conducted, including test methods and a general description of testing protocols.(N) (1) May adversely affect federally-listed threatened or endangered species or the designated critical habitat of such species; or(2) Has the potential to cause adverse effects on historic properties.(ii) To submit an application required under the plan, applicants may submit electronically through the Central Data Exchange (CDX)/Compliance and Emissions Data Reporting Interface (CEDRI) or submit by mail.(A) //cdx.epa.gov. First-time users will need to register with CDX. The CDX platform will also be used for any permit reporting requirements.(B) Applicants that do not apply using CDX/CEDRI shall mail a signed application using certified mail (do not request signature) to: Air and Radiation Division, Permits Office (Air-3-1), U.S. EPA, Region 9, 75 Hawthorne Street, San Francisco, CA 94105.(C) Applicants that apply using certified mail must email a copy of the application and the certified mail tracking number to provide notification of delivery receipt to [email protected].
Citations to §52.285(d)(2)(iv)
-
(3) The owner or operator of any proposed new major stationary source or major modification shall submit a complete application using EPA Region IX's electronic system, which is described in paragraph (d)(3)(ii) of this section. The application must include the information listed in this paragraph (d)(3) as well as the demonstrations to show compliance with paragraphs (d)(2)(i) through (iv) of this section. The reviewing authority's designation that an application is complete for purposes of permit processing does not preclude the reviewing authority from requesting or accepting any additional information.(C) Identification and description of all emission points, including information regarding all nonattainment pollutants emitted by all emissions units included in the new source or modification.(D) A process description of all activities, including design capacity, that may generate emissions of nonattainment pollutants, in sufficient detail to establish the basis for the applicability of standards.(E) A projected schedule for commencing construction and operation for all emissions units included in the new source or modification.(G) A determination as to whether the new source or modification will result in any secondary emissions.(H) The emission rates of all regulated NSR pollutants, including fugitive and secondary emission rates, if applicable. The emission rates must be described in tons per year (tpy). If necessary, shorter-term rates must be described to allow for compliance using the applicable standard reference test method or other methodology specified (i.e., grams/liter, parts per million volume (ppmv) or parts per million weight (ppmw), lbs/MMBtu).(I) The calculations on which the emission rate information is based, including fuel specifications, if applicable, and any other assumptions used to determine the emission rates (e.g., higher heating value (HHV), sulfur content of natural gas, VOC content).(J) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.I and IV.J, that are used to determine applicability of the plan, including the emission calculations (increases or decreases) for each project that occurred during the contemporaneous period, as applicable.(K) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.A, used to determine the quantity of offsets required for the new source or modification.(L) Identification of actual emission reductions that meet the offset integrity criteria of being real, surplus, quantifiable, permanent and federally enforceable.(M) If applicable, a description of how performance testing will be conducted, including test methods and a general description of testing protocols.(N) (1) May adversely affect federally-listed threatened or endangered species or the designated critical habitat of such species; or(2) Has the potential to cause adverse effects on historic properties.(ii) To submit an application required under the plan, applicants may submit electronically through the Central Data Exchange (CDX)/Compliance and Emissions Data Reporting Interface (CEDRI) or submit by mail.(A) //cdx.epa.gov. First-time users will need to register with CDX. The CDX platform will also be used for any permit reporting requirements.(B) Applicants that do not apply using CDX/CEDRI shall mail a signed application using certified mail (do not request signature) to: Air and Radiation Division, Permits Office (Air-3-1), U.S. EPA, Region 9, 75 Hawthorne Street, San Francisco, CA 94105.(C) Applicants that apply using certified mail must email a copy of the application and the certified mail tracking number to provide notification of delivery receipt to [email protected].
Citations to §52.285(d)(iv)
-
(3) The owner or operator of any proposed new major stationary source or major modification shall submit a complete application using EPA Region IX's electronic system, which is described in paragraph (d)(3)(ii) of this section. The application must include the information listed in this paragraph (d)(3) as well as the demonstrations to show compliance with paragraphs (d)(2)(i) through (iv) of this section. The reviewing authority's designation that an application is complete for purposes of permit processing does not preclude the reviewing authority from requesting or accepting any additional information.(C) Identification and description of all emission points, including information regarding all nonattainment pollutants emitted by all emissions units included in the new source or modification.(D) A process description of all activities, including design capacity, that may generate emissions of nonattainment pollutants, in sufficient detail to establish the basis for the applicability of standards.(E) A projected schedule for commencing construction and operation for all emissions units included in the new source or modification.(G) A determination as to whether the new source or modification will result in any secondary emissions.(H) The emission rates of all regulated NSR pollutants, including fugitive and secondary emission rates, if applicable. The emission rates must be described in tons per year (tpy). If necessary, shorter-term rates must be described to allow for compliance using the applicable standard reference test method or other methodology specified (i.e., grams/liter, parts per million volume (ppmv) or parts per million weight (ppmw), lbs/MMBtu).(I) The calculations on which the emission rate information is based, including fuel specifications, if applicable, and any other assumptions used to determine the emission rates (e.g., higher heating value (HHV), sulfur content of natural gas, VOC content).(J) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.I and IV.J, that are used to determine applicability of the plan, including the emission calculations (increases or decreases) for each project that occurred during the contemporaneous period, as applicable.(K) The calculations, pursuant to 40 CFR part 51, appendix S, paragraph IV.A, used to determine the quantity of offsets required for the new source or modification.(L) Identification of actual emission reductions that meet the offset integrity criteria of being real, surplus, quantifiable, permanent and federally enforceable.(M) If applicable, a description of how performance testing will be conducted, including test methods and a general description of testing protocols.(N) (1) May adversely affect federally-listed threatened or endangered species or the designated critical habitat of such species; or(2) Has the potential to cause adverse effects on historic properties.(ii) To submit an application required under the plan, applicants may submit electronically through the Central Data Exchange (CDX)/Compliance and Emissions Data Reporting Interface (CEDRI) or submit by mail.(A) //cdx.epa.gov. First-time users will need to register with CDX. The CDX platform will also be used for any permit reporting requirements.(B) Applicants that do not apply using CDX/CEDRI shall mail a signed application using certified mail (do not request signature) to: Air and Radiation Division, Permits Office (Air-3-1), U.S. EPA, Region 9, 75 Hawthorne Street, San Francisco, CA 94105.(C) Applicants that apply using certified mail must email a copy of the application and the certified mail tracking number to provide notification of delivery receipt to [email protected].
Citations to §52.285(e)(1)(i)
-
(1) With the exception of any confidential information as defined in 40 CFR part 2, subpart B, the reviewing authority must make available for public inspection the documents listed in paragraphs (e)(1)(i) through (iv) of this section. The reviewing authority must make such information available for public inspection at the appropriate EPA Regional Office and in at least one location in the area affected by the source, such as the MDAQMD headquarters location or a local library.(i) All information submitted as part of your permit application as required under paragraph (d)(3) of this section.(iii) The reviewing authority's analysis of the application and any additional information submitted by you, including the LAER analysis and, where applicable, the analysis of your emissions reductions (offsets), your demonstration of a net air quality benefit in the affected area and your analysis of alternative sites, sizes, production processes and environmental control techniques.
Citations to §52.285(e)(1)(ii)
-
(1) With the exception of any confidential information as defined in 40 CFR part 2, subpart B, the reviewing authority must make available for public inspection the documents listed in paragraphs (e)(1)(i) through (iv) of this section. The reviewing authority must make such information available for public inspection at the appropriate EPA Regional Office and in at least one location in the area affected by the source, such as the MDAQMD headquarters location or a local library.(i) All information submitted as part of your permit application as required under paragraph (d)(3) of this section.(iii) The reviewing authority's analysis of the application and any additional information submitted by you, including the LAER analysis and, where applicable, the analysis of your emissions reductions (offsets), your demonstration of a net air quality benefit in the affected area and your analysis of alternative sites, sizes, production processes and environmental control techniques.
Citations to §52.285(e)(1)(iii)
-
(1) With the exception of any confidential information as defined in 40 CFR part 2, subpart B, the reviewing authority must make available for public inspection the documents listed in paragraphs (e)(1)(i) through (iv) of this section. The reviewing authority must make such information available for public inspection at the appropriate EPA Regional Office and in at least one location in the area affected by the source, such as the MDAQMD headquarters location or a local library.(i) All information submitted as part of your permit application as required under paragraph (d)(3) of this section.(iii) The reviewing authority's analysis of the application and any additional information submitted by you, including the LAER analysis and, where applicable, the analysis of your emissions reductions (offsets), your demonstration of a net air quality benefit in the affected area and your analysis of alternative sites, sizes, production processes and environmental control techniques.
Citations to §52.285(e)(1)(iv)
-
(1) With the exception of any confidential information as defined in 40 CFR part 2, subpart B, the reviewing authority must make available for public inspection the documents listed in paragraphs (e)(1)(i) through (iv) of this section. The reviewing authority must make such information available for public inspection at the appropriate EPA Regional Office and in at least one location in the area affected by the source, such as the MDAQMD headquarters location or a local library.(i) All information submitted as part of your permit application as required under paragraph (d)(3) of this section.(iii) The reviewing authority's analysis of the application and any additional information submitted by you, including the LAER analysis and, where applicable, the analysis of your emissions reductions (offsets), your demonstration of a net air quality benefit in the affected area and your analysis of alternative sites, sizes, production processes and environmental control techniques.
Citations to §52.285(g)(2)(i)
-
(2) This paragraph (g)(2) establishes the process by which the Administrator may delegate authority to the MDAQMD in accordance with the provisions in paragraphs (g)(2)(i) through (iv) of this section. Any Federal requirements under the plan that are administered by the delegate MDAQMD are enforceable by the EPA under Federal law.(i) To be delegated authority to administer the FIP or specific portions of it, the MDAQMD must submit a request to the Administrator.(ii) A Delegation Agreement will set forth the terms and conditions of the delegation, will specify the provisions that the delegate MDAQMD will be authorized to implement on behalf of the EPA and will be entered into by the Administrator and the MDAQMD. The Agreement will become effective upon the date that both the Administrator and the MDAQMD have signed the Agreement or as otherwise stated in the Agreement. Once the delegation becomes effective, the MDAQMD will be responsible, to the extent specified in the Agreement, for administration of the provisions of the FIP that are subject to the Agreement.(iii) The Administrator will publish a notice in the Federal Register informing the public of any Delegation Agreement. The Administrator also will publish the notice in a newspaper of general circulation in the MDAQMD. In addition, the Administrator will mail a copy of the notice to persons on a mailing list developed by the Administrator consisting of those persons who have requested to be placed on such a mailing list.(iv) A Delegation Agreement may be modified, amended or revoked, in part or in whole, by the Administrator after consultation with the MDAQMD.
Citations to §52.285(g)(2)(ii)
-
(2) This paragraph (g)(2) establishes the process by which the Administrator may delegate authority to the MDAQMD in accordance with the provisions in paragraphs (g)(2)(i) through (iv) of this section. Any Federal requirements under the plan that are administered by the delegate MDAQMD are enforceable by the EPA under Federal law.(i) To be delegated authority to administer the FIP or specific portions of it, the MDAQMD must submit a request to the Administrator.(ii) A Delegation Agreement will set forth the terms and conditions of the delegation, will specify the provisions that the delegate MDAQMD will be authorized to implement on behalf of the EPA and will be entered into by the Administrator and the MDAQMD. The Agreement will become effective upon the date that both the Administrator and the MDAQMD have signed the Agreement or as otherwise stated in the Agreement. Once the delegation becomes effective, the MDAQMD will be responsible, to the extent specified in the Agreement, for administration of the provisions of the FIP that are subject to the Agreement.(iii) The Administrator will publish a notice in the Federal Register informing the public of any Delegation Agreement. The Administrator also will publish the notice in a newspaper of general circulation in the MDAQMD. In addition, the Administrator will mail a copy of the notice to persons on a mailing list developed by the Administrator consisting of those persons who have requested to be placed on such a mailing list.(iv) A Delegation Agreement may be modified, amended or revoked, in part or in whole, by the Administrator after consultation with the MDAQMD.
Citations to §52.285(g)(2)(iii)
-
(2) This paragraph (g)(2) establishes the process by which the Administrator may delegate authority to the MDAQMD in accordance with the provisions in paragraphs (g)(2)(i) through (iv) of this section. Any Federal requirements under the plan that are administered by the delegate MDAQMD are enforceable by the EPA under Federal law.(i) To be delegated authority to administer the FIP or specific portions of it, the MDAQMD must submit a request to the Administrator.(ii) A Delegation Agreement will set forth the terms and conditions of the delegation, will specify the provisions that the delegate MDAQMD will be authorized to implement on behalf of the EPA and will be entered into by the Administrator and the MDAQMD. The Agreement will become effective upon the date that both the Administrator and the MDAQMD have signed the Agreement or as otherwise stated in the Agreement. Once the delegation becomes effective, the MDAQMD will be responsible, to the extent specified in the Agreement, for administration of the provisions of the FIP that are subject to the Agreement.(iii) The Administrator will publish a notice in the Federal Register informing the public of any Delegation Agreement. The Administrator also will publish the notice in a newspaper of general circulation in the MDAQMD. In addition, the Administrator will mail a copy of the notice to persons on a mailing list developed by the Administrator consisting of those persons who have requested to be placed on such a mailing list.(iv) A Delegation Agreement may be modified, amended or revoked, in part or in whole, by the Administrator after consultation with the MDAQMD.
Citations to §52.285(g)(2)(iv)
-
(2) This paragraph (g)(2) establishes the process by which the Administrator may delegate authority to the MDAQMD in accordance with the provisions in paragraphs (g)(2)(i) through (iv) of this section. Any Federal requirements under the plan that are administered by the delegate MDAQMD are enforceable by the EPA under Federal law.(i) To be delegated authority to administer the FIP or specific portions of it, the MDAQMD must submit a request to the Administrator.(ii) A Delegation Agreement will set forth the terms and conditions of the delegation, will specify the provisions that the delegate MDAQMD will be authorized to implement on behalf of the EPA and will be entered into by the Administrator and the MDAQMD. The Agreement will become effective upon the date that both the Administrator and the MDAQMD have signed the Agreement or as otherwise stated in the Agreement. Once the delegation becomes effective, the MDAQMD will be responsible, to the extent specified in the Agreement, for administration of the provisions of the FIP that are subject to the Agreement.(iii) The Administrator will publish a notice in the Federal Register informing the public of any Delegation Agreement. The Administrator also will publish the notice in a newspaper of general circulation in the MDAQMD. In addition, the Administrator will mail a copy of the notice to persons on a mailing list developed by the Administrator consisting of those persons who have requested to be placed on such a mailing list.(iv) A Delegation Agreement may be modified, amended or revoked, in part or in whole, by the Administrator after consultation with the MDAQMD.