§52.274. California air pollution emergency plan.
40 C.F.R. § 52.274
(2) The measures to curtail or postpone electrically intensive industrial operations, where feasible.
(3) The measures for electric utilities to import power from outside the basin to the extent feasible.
(2) The measures to postpone operations which can be postponed until after the episode.
(3) For fossil fuel-fired combustion sources, including electric utilities, with a heat input greater than 50 million BTU per hour:
(i) The measures to burn natural gas.
(ii) To the extent that natural gas is not available, the measures to burn fuel oil with a sulfur content of not more than 0.25 percent by weight or the measures to reduce air contaminant emissions to equivalent discharge. Any combustion source may be exempt from the provisions of this paragraph upon demonstration that fuel oil with the specified sulfur content is not available.
(4) For electric utilities the measures, in addition to those in paragraph (d)(8)(ii)(F)(3) of this section, to:
(i) Shift oil burning power generation to non-source areas to the maximum extent consistent with the public health, safety, and welfare.
(ii) Shift oil burning power generation to combined cycle gas turbine generating equipment burning fuel oil containing less than 0.15 percent sulfur to the maximum extent consistent with the public health, safety, and welfare.
(5) For refineries and chemical plants the measures to be taken to reduce air contaminant emissions by 20 percent without jeopardizing the public health or safety, without causing an increase in the emissions of other air contaminants, without damaging the equipment or without reducing production by more than 20 percent.
(6) The measures in paragraph (d)(8)(ii)(F) of this section.
(2) The measures in paragraph (d)(8)(ii)(G) of this section.
(3) A list of equipment and the permit numbers of such equipment not operated on a major national holiday.
(4) A statement as to whether or not the facility operates on a major national holiday.
(2) The measures described in paragraph (d)(8)(ii)(G) of this section.
(3) The measures for any facility or plant, except electrical generating facilities and petroleum refineries, normally emitting 91 metric tons (100 tons) or more per year of particulate matter to eliminate such emissions by starting no new batches, by ceasing feed of new materials, and by phasing down as rapidly as possible without damage to the equipment.
(4) The measures for metal melting, refining, or smelting plants to eliminate emissions of particulate matter by starting no new batches, by ceasing feed of new materials, and by phasing down as rapidly as possible without damage to the equipment.
(2) The measures for petroleum refineries to reduce emissions of sulfur dioxide by 33 percent, without damaging the equipment or increasing the emissions of other air contaminants.
(3) The measures for any facility or plant, except electrical generating facilities and petroleum refineries, normally emitting 91 metric tons (100 tons) or more per year of sulfur dioxide to eliminate such emissions by starting no new batches, by ceasing feed of new materials, and by phasing down as rapidly as possible without damage to the equipment.
(2) By employees commuting from home to the place of business on a normal weekday and on a major national holiday.
(2) The measures to postpone operations which can be postponed until after the episode.
(2) A list of all equipment, with permit numbers if applicable, which must be operated to protect the public health or safety, and an estimate of the air contaminant emissions from such equipment.
(2) On a major national holiday.
(2) On a major national holiday.
(2) A statement as to whether or not the facility operates on a major national holiday.
(2) On a major national holiday.
(2) By employees commuting between home and the place of business on a normal weekday and on a major national holiday.
(2) Normally used on a weekday.
(3) Normally used on a major national holiday.
(2) The measures to postpone operations which can be postponed until after the episode.
(2) A list of all equipment, with permit numbers if applicable, which must be operated to protect the public health or safety, and an estimate of the hydrocarbons, nitrogen oxides and particulate matter emissions from such equipment.
(2) The measures to postpone operations which can be postponed until after the episode.
(2) A list of all equipment, with permit numbers if applicable, which must be operated to protect the public health or safety, and an estimate of the carbon monoxide, hydrocarbons, nitrogen oxides, and particulate matter emissions from such equipment.
(2) By employees commuting between home and the place of business on a normal weekday and a major national holiday.
(3) The minimum number of motor vehicles to be operated that are necessary to protect public health or safety.
Notes, amendments, and revision history
Amendments
[43 FR 22721, May 26, 1978]
Authority
Authority: 42 U.S.C. 7401 et seq.
Amendments
[40 FR 5521, Feb. 6, 1975]
Amendments
[43 FR 22721, May 26, 1978]