§412.37. Additional measures. — Inbound Citations
40 C.F.R. § 412.37
Statutory Authority
Cited by 24 regulations in release Current.
Citations to §412.37(a)
-
-
(a) Each CAFO subject to this subpart must implement the requirements of § 412.37(a).
Citations to §412.37(b)
-
(B) In addition, all CAFOs subject to 40 CFR part 412 must comply with record keeping requirements as specified in § 412.37(b) and (c) and § 412.47(b) and (c).
-
-
(b) Each CAFO subject to this subpart must comply with the record-keeping requirements of § 412.37(b).
Citations to §412.37(b)(1)
-
(b) Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by 40 CFR 122.21(i)(1) and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (b)(1) through (b)(6) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Records documenting the inspections required under paragraph (a)(1) of this section;(2) Weekly records of the depth of the manure and process wastewater in the liquid impoundment as indicated by the depth marker under paragraph (a)(2) of this section;(3) Records documenting any actions taken to correct deficiencies required under paragraph (a)(3) of this section. Deficiencies not corrected within 30 days must be accompanied by an explanation of the factors preventing immediate correction;(4) Records of mortalities management and practices used by the CAFO to meet the requirements of paragraph (a)(4) of this section.(5) Records documenting the current design of any manure or litter storage structures, including volume for solids accumulation, design treatment volume, total design volume, and approximate number of days of storage capacity;
Citations to §412.37(b)(2)
-
(b) Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by 40 CFR 122.21(i)(1) and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (b)(1) through (b)(6) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Records documenting the inspections required under paragraph (a)(1) of this section;(2) Weekly records of the depth of the manure and process wastewater in the liquid impoundment as indicated by the depth marker under paragraph (a)(2) of this section;(3) Records documenting any actions taken to correct deficiencies required under paragraph (a)(3) of this section. Deficiencies not corrected within 30 days must be accompanied by an explanation of the factors preventing immediate correction;(4) Records of mortalities management and practices used by the CAFO to meet the requirements of paragraph (a)(4) of this section.(5) Records documenting the current design of any manure or litter storage structures, including volume for solids accumulation, design treatment volume, total design volume, and approximate number of days of storage capacity;
Citations to §412.37(b)(3)
-
(b) Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by 40 CFR 122.21(i)(1) and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (b)(1) through (b)(6) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Records documenting the inspections required under paragraph (a)(1) of this section;(2) Weekly records of the depth of the manure and process wastewater in the liquid impoundment as indicated by the depth marker under paragraph (a)(2) of this section;(3) Records documenting any actions taken to correct deficiencies required under paragraph (a)(3) of this section. Deficiencies not corrected within 30 days must be accompanied by an explanation of the factors preventing immediate correction;(4) Records of mortalities management and practices used by the CAFO to meet the requirements of paragraph (a)(4) of this section.(5) Records documenting the current design of any manure or litter storage structures, including volume for solids accumulation, design treatment volume, total design volume, and approximate number of days of storage capacity;
Citations to §412.37(b)(4)
-
(b) Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by 40 CFR 122.21(i)(1) and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (b)(1) through (b)(6) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Records documenting the inspections required under paragraph (a)(1) of this section;(2) Weekly records of the depth of the manure and process wastewater in the liquid impoundment as indicated by the depth marker under paragraph (a)(2) of this section;(3) Records documenting any actions taken to correct deficiencies required under paragraph (a)(3) of this section. Deficiencies not corrected within 30 days must be accompanied by an explanation of the factors preventing immediate correction;(4) Records of mortalities management and practices used by the CAFO to meet the requirements of paragraph (a)(4) of this section.(5) Records documenting the current design of any manure or litter storage structures, including volume for solids accumulation, design treatment volume, total design volume, and approximate number of days of storage capacity;
Citations to §412.37(b)(5)
-
(b) Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by 40 CFR 122.21(i)(1) and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (b)(1) through (b)(6) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Records documenting the inspections required under paragraph (a)(1) of this section;(2) Weekly records of the depth of the manure and process wastewater in the liquid impoundment as indicated by the depth marker under paragraph (a)(2) of this section;(3) Records documenting any actions taken to correct deficiencies required under paragraph (a)(3) of this section. Deficiencies not corrected within 30 days must be accompanied by an explanation of the factors preventing immediate correction;(4) Records of mortalities management and practices used by the CAFO to meet the requirements of paragraph (a)(4) of this section.(5) Records documenting the current design of any manure or litter storage structures, including volume for solids accumulation, design treatment volume, total design volume, and approximate number of days of storage capacity;
Citations to §412.37(b)(6)
-
(b) Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by 40 CFR 122.21(i)(1) and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (b)(1) through (b)(6) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Records documenting the inspections required under paragraph (a)(1) of this section;(2) Weekly records of the depth of the manure and process wastewater in the liquid impoundment as indicated by the depth marker under paragraph (a)(2) of this section;(3) Records documenting any actions taken to correct deficiencies required under paragraph (a)(3) of this section. Deficiencies not corrected within 30 days must be accompanied by an explanation of the factors preventing immediate correction;(4) Records of mortalities management and practices used by the CAFO to meet the requirements of paragraph (a)(4) of this section.(5) Records documenting the current design of any manure or litter storage structures, including volume for solids accumulation, design treatment volume, total design volume, and approximate number of days of storage capacity;
Citations to §412.37(c)
-
(B) In addition, all CAFOs subject to 40 CFR part 412 must comply with record keeping requirements as specified in § 412.37(b) and (c) and § 412.47(b) and (c).
-
(2) Maintain the records specified at § 412.37 (c);
-
(c) Each CAFO subject to this subpart must comply with the record-keeping requirements of § 412.37(c).
Citations to §412.37(c)(1)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(2)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(3)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(4)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(5)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(6)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(7)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(8)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(9)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;
Citations to §412.37(c)(10)
-
(c) Each CAFO must maintain on-site a copy of its site-specific nutrient management plan. Each CAFO must maintain on-site for a period of five years from the date they are created a complete copy of the information required by § 412.4 and 40 CFR 122.42(e)(1)(ix) and the records specified in paragraphs (c)(1) through (c)(10) of this section. The CAFO must make these records available to the Director and, in an authorized State, the Regional Administrator, or his or her designee, for review upon request.(1) Expected crop yields;(2) The date(s) manure, litter, or process waste water is applied to each field;(3) Weather conditions at time of application and for 24 hours prior to and following application;(4) Test methods used to sample and analyze manure, litter, process waste water, and soil;(5) Results from manure, litter, process waste water, and soil sampling;(6) Explanation of the basis for determining manure application rates, as provided in the technical standards established by the Director.(7) Calculations showing the total nitrogen and phosphorus to be applied to each field, including sources other than manure, litter, or process wastewater;(8) Total amount of nitrogen and phosphorus actually applied to each field, including documentation of calculations for the total amount applied;(9) The method used to apply the manure, litter, or process wastewater;