§35.2202. Step 2 + 3 projects. — Inbound Citations
40 C.F.R. § 35.2202
Cited by 4 regulations in release Current.
Citations to 40 U.S.C. § 35.2202 as a whole
-
-
(a) Before awarding grant assistance for any project the Regional Administrator shall approve the facilities plan and final design drawings and specifications and determine that the applicant and the applicant's project have met all the applicable requirements of §§ 35.2040 and 35.2100 through § 35.2127 except as provided in § 35.2202 for Step 2 + 3 projects and § 35.2203 for Step 7 projects.
-
In addition to the EPA General Grant Conditions (http://www.epa.gov/ogd/tc.htm), each treatment works grant shall be subject to the conditions under §§ 35.2202 through 35.2218.
-
(b) The grantee shall initiate procurement action for building the project promptly after award of a Step 3 grant or, after receiving written approval of the information required under § 35.2202 under a Step 2 + 3 grant or, for a Step 7 project, after completing the facilities plan and the preparation of a pre-bid package that is sufficiently detailed to insure that the bids received form the design/build work will be complete, accurate, comparable and will result in a cost-effective operable facility. Public notice of proposed procurement action should be made promptly after Step 3 award or after final approvals for a Step 2 + 3 grant under § 35.2202, or after completing the pre-bid package for the Step 7 award. The grantee shall award the subagreement(s) and issue notice(s) to proceed, where required, for building all significant elements of the project within twelve months of the Step 3 award or final Step 2 + 3 approvals.