US Codex
C.F.R.
Browse by date
Notes

§307.14. Definitions. — Inbound Citations

40 C.F.R. § 307.14

Cited by 6 regulations in release Current.

Citations to §307.14(1)

  • (6) Any imminently hazardous chemical substance or mixture with respect to which the Administrator of EPA (Administrator) has taken action pursuant to section 7 of the Toxic Substances Control Act (15 U.S.C. 2601 et seq.). The term does not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under paragraphs (1) through (6) of this definition, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas).
    National Contingency Plan, or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR part 300) developed under section 311(c) of the Federal Water Pollution Control Act and revised pursuant to section 105 of CERCLA.
    Necessary costs means “necessary response costs” as required by section 111(a)(2) of CERCLA for Fund reimbursement of a preauthorized response action. Necessary response costs are costs determined to be:

Citations to §307.14(2)

  • (6) Any imminently hazardous chemical substance or mixture with respect to which the Administrator of EPA (Administrator) has taken action pursuant to section 7 of the Toxic Substances Control Act (15 U.S.C. 2601 et seq.). The term does not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under paragraphs (1) through (6) of this definition, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas).
    National Contingency Plan, or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR part 300) developed under section 311(c) of the Federal Water Pollution Control Act and revised pursuant to section 105 of CERCLA.
    Necessary costs means “necessary response costs” as required by section 111(a)(2) of CERCLA for Fund reimbursement of a preauthorized response action. Necessary response costs are costs determined to be:

Citations to §307.14(3)

  • (6) Any imminently hazardous chemical substance or mixture with respect to which the Administrator of EPA (Administrator) has taken action pursuant to section 7 of the Toxic Substances Control Act (15 U.S.C. 2601 et seq.). The term does not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under paragraphs (1) through (6) of this definition, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas).
    National Contingency Plan, or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR part 300) developed under section 311(c) of the Federal Water Pollution Control Act and revised pursuant to section 105 of CERCLA.
    Necessary costs means “necessary response costs” as required by section 111(a)(2) of CERCLA for Fund reimbursement of a preauthorized response action. Necessary response costs are costs determined to be:

Citations to §307.14(4)

  • (6) Any imminently hazardous chemical substance or mixture with respect to which the Administrator of EPA (Administrator) has taken action pursuant to section 7 of the Toxic Substances Control Act (15 U.S.C. 2601 et seq.). The term does not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under paragraphs (1) through (6) of this definition, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas).
    National Contingency Plan, or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR part 300) developed under section 311(c) of the Federal Water Pollution Control Act and revised pursuant to section 105 of CERCLA.
    Necessary costs means “necessary response costs” as required by section 111(a)(2) of CERCLA for Fund reimbursement of a preauthorized response action. Necessary response costs are costs determined to be:

Citations to §307.14(5)

  • (6) Any imminently hazardous chemical substance or mixture with respect to which the Administrator of EPA (Administrator) has taken action pursuant to section 7 of the Toxic Substances Control Act (15 U.S.C. 2601 et seq.). The term does not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under paragraphs (1) through (6) of this definition, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas).
    National Contingency Plan, or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR part 300) developed under section 311(c) of the Federal Water Pollution Control Act and revised pursuant to section 105 of CERCLA.
    Necessary costs means “necessary response costs” as required by section 111(a)(2) of CERCLA for Fund reimbursement of a preauthorized response action. Necessary response costs are costs determined to be:

Citations to §307.14(6)

  • (6) Any imminently hazardous chemical substance or mixture with respect to which the Administrator of EPA (Administrator) has taken action pursuant to section 7 of the Toxic Substances Control Act (15 U.S.C. 2601 et seq.). The term does not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under paragraphs (1) through (6) of this definition, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas).
    National Contingency Plan, or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR part 300) developed under section 311(c) of the Federal Water Pollution Control Act and revised pursuant to section 105 of CERCLA.
    Necessary costs means “necessary response costs” as required by section 111(a)(2) of CERCLA for Fund reimbursement of a preauthorized response action. Necessary response costs are costs determined to be: