§280.73. Applicability to previously closed UST systems. — Inbound Citations
40 C.F.R. § 280.73
Statutory Authority
Cited by 2 regulations in release Current.
Citations to 40 C.F.R. § 280.73 as a whole
-
(i) Permanently close the UST or UST system in accordance with §§ 280.71 through 280.74, except § 280.72(b); or
-
(c) When an UST system is temporarily closed for more than 12 months, owners and operators must permanently close the UST system if it does not meet either performance standards in § 280.20 for new UST systems or the upgrading requirements in § 280.21, except that the spill and overfill equipment requirements do not have to be met. Owners and operators must permanently close the substandard UST systems at the end of this 12-month period in accordance with §§ 280.71 through 280.74, unless the implementing agency provides an extension of the 12-month temporary closure period. Owners and operators must complete a site assessment in accordance with § 280.72 before such an extension can be applied for.