US Codex
C.F.R.
Browse by date
Notes

§267.192. What handling and inspection procedures must I follow during installation of new tank systems? — Inbound Citations

40 C.F.R. § 267.192

Cited by 2 regulations in release Current.

Citations to 40 U.S.C. § 267.192 as a whole

  • (c) You must obtain, and keep at the facility, written statements by those persons required to certify the design of the tank system and to supervise the installation of the tank system as required in §§ 267.192, 267.193, and paragraphs (a) and (b) of this section. The written statement must attest that the tank system was properly designed and installed and that you made repairs under §§ 267.192 and 267.193. These written statements must also include the certification statement as required in 40 CFR 270.11(d).
  • (a) A written assessment that is reviewed and certified by an independent, qualified, registered professional engineer on the structural integrity and suitability for handling hazardous waste of each tank system, as required under 40 CFR 267.191 and 267.192.