§264.227. Emergency repairs; contingency plans. — Inbound Citations
40 C.F.R. § 264.227
Statutory Authority
Cited by 4 regulations in release Current.
Citations to 40 U.S.C. § 264.227 as a whole
-
(3) Be designed and operated to capture and transport all the purged process fluid to a material management unit that complies with the applicable requirements of §§ 261.1084 through 264.1086 of this subpart or a control device that complies with the requirements of § 261.1060 of this subpart.
-
Citations to §264.227(b)
-
(e) A description of the procedure to be used for removing a surface impoundment from service, as required under § 264.227(b) and (c). This information should be included in the contingency plan submitted under § 270.14(b)(7);
Citations to §264.227(c)
-
(e) A description of the procedure to be used for removing a surface impoundment from service, as required under § 264.227(b) and (c). This information should be included in the contingency plan submitted under § 270.14(b)(7);