§264.196. Response to leaks or spills and disposition of leaking or unfit-for-use tank systems. — Inbound Citations
40 C.F.R. § 264.196
Statutory Authority
Cited by 12 regulations in release Current.
Citations to 40 U.S.C. § 264.196 as a whole
-
(3) Be designed and operated to capture and transport all the purged process fluid to a material management unit that complies with the applicable requirements of §§ 261.1084 through 264.1086 of this subpart or a control device that complies with the requirements of § 261.1060 of this subpart.
-
(d) If, as a result of the assessment conducted in accordance with paragraph (a), a tank system is found to be leaking or unfit for use, the owner or operator must comply with the requirements of § 264.196.
-
(i) Comply with the requirements of § 264.196, except paragraph (d), and
-
(c) The owner or operator must comply with the requirements of § 264.196 if a leak or spill occurs in the tank system.
Citations to §264.196(a)
-
(i) Comply with the requirements of § 264.196 (a), (b), (c), and (d); and
Citations to §264.196(b)
-
(i) Comply with the requirements of § 264.196 (a), (b), (c), and (d); and
Citations to §264.196(c)
-
(i) Comply with the requirements of § 264.196 (a), (b), (c), and (d); and
Citations to §264.196(d)
-
(i) Comply with the requirements of § 264.196 (a), (b), (c), and (d); and
Citations to §264.196(e)(2)
-
(1) Unless the owner/operator satisfies the requirements of paragraphs (e)(2) through (4) of this section, the tank system must be closed in accordance with § 264.197.
Citations to §264.196(e)(3)
-
(1) Unless the owner/operator satisfies the requirements of paragraphs (e)(2) through (4) of this section, the tank system must be closed in accordance with § 264.197.
Citations to §264.196(e)(4)
-
(1) Unless the owner/operator satisfies the requirements of paragraphs (e)(2) through (4) of this section, the tank system must be closed in accordance with § 264.197.
Citations to §264.196(f)
-
(19) Certifications as required by § 264.196(f) must be maintained in the operating record until closure of the facility.