§262.212. Making the hazardous waste determination at an on-site interim status or permitted treatment, storage or disposal facility. — Inbound Citations
40 C.F.R. § 262.212
Statutory Authority
Cited by 3 regulations in release Current.
Citations to 40 U.S.C. § 262.212 as a whole
-
(3) Be designed and operated to capture and transport all the purged process fluid to a material management unit that complies with the applicable requirements of §§ 261.1084 through 264.1086 of this subpart or a control device that complies with the requirements of § 261.1060 of this subpart.
-
(3) Within 4 calendar days of arriving at an on-site interim status or permitted treatment, storage or disposal facility, in accordance with § 262.212.
-
(5) Describe its intended best practices for making hazardous waste determinations, including specifying the duties of the individuals involved in the process (see the required standards at § 262.11(a) through (d) and §§ 262.209 through 262.212).