§262.20. General requirements. — Inbound Citations
40 C.F.R. § 262.20
Statutory Authority
Cited by 22 regulations in release Current.
Citations to 40 C.F.R. § 262.20 as a whole
-
(iv) The unit must export and utilize at least 75 percent of the recovered energy, calculated on an annual basis. In this calculation, no credit shall be given for recovered heat used internally in the same unit. (Examples of internal use are the preheating of fuel or combustion air, and the driving of induced or forced draft fans or feedwater pumps); or
-
(3) Be designed and operated to capture and transport all the purged process fluid to a material management unit that complies with the applicable requirements of §§ 261.1084 through 264.1086 of this subpart or a control device that complies with the requirements of § 261.1060 of this subpart.
-
(c) The exporter must comply with the manifest requirements of §§ 262.20 through 262.25 except that:(1) In lieu of the name, site address and EPA ID number of the designated permitted facility, the exporter must enter the name and site address of the foreign receiving facility;(i) Check the export box and enter the U.S. port of exit (city and State) from the United States;(ii) Enter the exporter's EPA ID number, if the exporter is not identified in Item 5 of the manifest (EPA Form 8700-22) for the export shipment; and(iii) List the waste stream consent number from the AOC for each hazardous waste listed on the manifest, matched to the relevant list number for the hazardous waste from block 9b. If additional space is needed, the exporter should use an additional Continuation Sheet(s) (EPA Form 8700-22A).(3) The exporter may obtain the manifest from any source so long as the source of the printed form has received approval from the EPA to print the manifest in accordance with § 262.21(g)(1).(4) Beginning on December 1, 2025, within 30 days of receiving an export manifest from the final domestic transporter to carry the export shipment to or across the U.S. port of exit, the exporter must submit the top copy (Page 1) of the signed and dated manifest (whether electronic or paper) and all continuation sheets (whether electronic or paper) to the EPA e-Manifest system. The exporter must submit the paper manifest and all paper continuation sheets to the EPA e-Manifest system for purposes of data entry and processing by transmitting to the EPA e-Manifest system an image file of Page 1 of the manifest and all continuation sheets, or by transmitting to the EPA e-Manifest system both a data file and the image file corresponding to Page 1 of the manifest and all continuation sheets.(i) As prescribed in § 265.1311 of this chapter, and determined in § 265.1312 of this chapter, an exporter who is a user of the electronic manifest system shall be assessed a user fee by the EPA for the submission and processing of each electronic and paper manifest. The EPA shall update the schedule of user fees and publish them to the user community, as provided in § 265.1313 of this chapter.(ii) An exporter subject to user fees under this section shall make user fee payments in accordance with the requirements of § 265.1314 of this chapter, subject to the informal fee dispute resolution process of § 265.1316 of this chapter, and subject to the sanctions for delinquent payments under § 265.1315 of this chapter.(iii) Electronic manifest signatures shall meet the criteria described in § 262.25.(iv) Within 30 days of receiving a paper replacement manifest from the last transporter carrying the shipment to or across the U.S. border for a manifest that was originated electronically, the exporter must send a signed and dated copy of the paper replacement manifest to the EPA e-Manifest system.(v) After foreign facilities have certified to the receipt of hazardous wastes by sending a copy of the movement document to the exporter per paragraph (d)(2)(xvii) of this section, any post-receipt data corrections may be submitted at any time by any interested person (e.g., domestic waste handler) shown on the manifest. If requested by the Director, an exporter must address manifest data corrections within 30 days from the date of the request. Data correction submissions must be made electronically via the post-receipt data corrections process as described in § 265.71(l) of this chapter, which applies to corrections made to either paper or electronic manifests.
-
(1) When importing hazardous waste, the importer must meet all the requirements of § 262.20 for the manifest except that:(i) In place of the generator's name, mailing and site addresses and EPA identification number, the name and site address of the foreign generator and the importer's name, mailing address and EPA identification number must be used.(ii) In place of the generator's signature on the certification statement, the importer or his agent must sign and date the certification and obtain the signature of the initial transporter.
-
(2) Electronic manifests that are obtained, completed, and transmitted in accordance with § 262.20(a)(3) of this chapter, and used in accordance with §§ 262.20, 262.24, and 262.25 of this chapter in lieu of EPA Forms 8700-22 and 8700-22A, are the legal equivalent of paper manifest forms bearing handwritten signatures, and satisfy for all purposes any requirement in subpart K of this part to obtain, complete, sign, provide, use, or retain a manifest.(i) Any requirement in subpart K of this part to sign a manifest or manifest certification by hand, or to obtain a handwritten signature, is satisfied by signing with or obtaining a valid and enforceable electronic signature within the meaning of § 262.25 of this chapter.(ii) Any requirement in subpart K of this part to give, provide, send, forward, or return to another person a copy of the manifest is satisfied when an electronic manifest is transmitted to the other person by submission to the EPA e-Manifest system.(iii) Any requirement in subpart K of this part for a generator to keep or retain a copy of each manifest is satisfied by retention of a signed electronic manifest in the generator's account on the EPA e-Manifest system, provided that such copies are readily available for viewing and production if requested by any the EPA or authorized State inspector.(iv) No generator may be held liable for the inability to produce an electronic manifest for inspection under this section if the generator can demonstrate that the inability to produce the electronic manifest is due exclusively to a technical difficulty with the e-Manifest system for which the generator bears no responsibility.(v) After facilities have certified that the manifest is complete, by signing it at the time of submission to the EPA e-Manifest system, any post-receipt data corrections may be submitted at any time by any interested person (e.g., waste handler) named on the manifest. If corrections are requested by the Director for portions of the manifest that a generator, transporter, or a commercial storage or disposal facility is required to complete, those PCB waste handlers must address the data correction within 30 days from the date of the request. Data corrections must be made electronically via the post-receipt data corrections process described in § 265.71(l) of this chapter, which applies to corrections made to either paper or electronic manifests. Generators who are not registered with the EPA e-Manifest system must arrange with interested persons shown on the manifest to electronically submit manifest data corrections on their behalf within 30 days of the date of the correction request.
-
The manifest consists of at least the number of copies which will provide the generator, the transporter, and the owner or operator of the designated facility with one copy each for their records and a copy to be submitted to the EPA e-Manifest system as indicated in the instructions included with EPA form 8700-22. Any requirement in subpart K of this part to give, provide, send, forward, or return to another person a copy of the manifest is satisfied when an electronic manifest is transmitted to the other person by submission to the EPA e-Manifest system. All parties using electronic manifests must do so in accordance with §§ 262.20, 262.24, and 262.25 of this chapter.
-
(2) Large high voltage capacitor means a capacitor which contains 1.36 kg (3 lbs.) or more of dielectric fluid and which operates at 2,000 volts (a.c. or d.c.) or above.
-
(a) No person may offer, transport, transfer, or deliver a hazardous waste (waste) unless an EPA Form 8700-22 and 8700-22A (when necessary) hazardous waste manifest (manifest) is prepared in accordance with 40 CFR 262.20 and is signed, carried, and given as required of that person by this section.
Citations to §262.20(a)
-
(e) Except as provided in paragraph (e)(7) of this section, for full or partial load rejections and residues that are to be sent off-site to an alternate facility, the facility is required to prepare a new manifest in accordance with § 262.20(a) of this chapter and the following instructions:(1) Write the generator's U.S. EPA ID number in Item 1 of the new manifest. Write the generator's name and mailing address in Item 5 of the new manifest. If the mailing address is different from the generator's site address, then write the generator's site address in the designated space for Item 5.(2) Write the name of the alternate designated facility and the facility's U.S. EPA ID number in the designated facility block (Item 8) of the new manifest.(3) Copy the manifest tracking number found in Item 4 of the old manifest to the Special Handling and Additional Information Block of the new manifest, and indicate that the shipment is a residue or rejected waste from the previous shipment.(4) Copy the manifest tracking number found in Item 4 of the new manifest to the manifest reference number line in the Discrepancy Block of the old manifest (Item 18a).(5) Write the DOT description for the rejected load or the residue in Item 9 (U.S. DOT Description) of the new manifest and write the container types, quantity, and volume(s) of waste.(6) Sign the Generator's/Offeror's Certification to certify, as the offeror of the shipment, that the waste has been properly packaged, marked and labeled and is in proper condition for transportation, and mail a signed copy of the manifest to the generator identified in Item 5 of the new manifest.(7) For full load rejections that are made while the transporter remains present at the facility, the facility may forward the rejected shipment to the alternate facility by completing Item 18b of the original manifest and supplying the information on the next destination facility in the Alternate Facility space. The facility must retain a copy of this manifest for its records, and then give the remaining copies of the manifest to the transporter to accompany the shipment. If the original manifest is not used, then the facility must use a new manifest and comply with paragraphs (e)(1), (2), (3), (4), (5), and (6) of this section.
-
(e) Except as provided in paragraph (e)(7) of this section, for full or partial load rejections and residues that are to be sent off-site to an alternate facility, the facility is required to prepare a new manifest in accordance with § 262.20(a) of this chapter and the following instructions:(1) Write the generator's U.S. EPA ID number in Item 1 of the new manifest. Write the generator's name and mailing address in Item 5 of the new manifest. If the mailing address is different from the generator's site address, then write the generator's site address in the designated space in Item 5.(2) Write the name of the alternate designated facility and the facility's U.S. EPA ID number in the designated facility block (Item 8) of the new manifest.(3) Copy the manifest tracking number found in Item 4 of the old manifest to the Special Handling and Additional Information Block of the new manifest, and indicate that the shipment is a residue or rejected waste from the previous shipment.(4) Copy the manifest tracking number found in Item 4 of the new manifest to the manifest reference number line in the Discrepancy Block of the old manifest (Item 18a).(5) Write the DOT description for the rejected load or the residue in Item 9 (U.S. DOT Description) of the new manifest and write the container types, quantity, and volume(s) of waste.(6) Sign the Generator's/Offeror's Certification to certify, as the offeror of the shipment, that the waste has been properly packaged, marked and labeled and is in proper condition for transportation, and mail a signed copy of the manifest to the generator identified in Item 5 of the new manifest.(7) For full load rejections that are made while the transporter remains present at the facility, the facility may forward the rejected shipment to the alternate facility by completing Item 18b of the original manifest and supplying the information on the next destination facility in the Alternate Facility space. The facility must retain a copy of this manifest for its records, and then give the remaining copies of the manifest to the transporter to accompany the shipment. If the original manifest is not used, then the facility must use a new manifest and comply with paragraphs (e)(1), (2), (3), (4), (5), and (6) of this section.
-
(1) Use a manifest system that ensures that interstate and intrastate shipments of hazardous waste are designated for delivery and, in the case of intrastate shipments, are delivered to facilities that are authorized to operate under an approved state program or the federal program. The manifest system must require the use of the paper or electronic manifest formats as required by § 262.20(a) of this chapter. No other manifest form, electronic manifest format, shipping paper, or information other than that required by federal requirements, may be required by the state to travel with the shipment, or to be transmitted electronically, as a means to track the transportation and delivery of hazardous waste shipments. No other electronic signature other than that required by the federal electronic manifest requirements may be required by a state to be executed in connection with the signing of an electronic manifest.
Citations to §262.20(a)(3)
-
(1) After August 6, 2014, no claim of business confidentiality may be asserted by any person with respect to information entered on a Hazardous Waste Manifest (EPA Form 8700-22), a Hazardous Waste Manifest Continuation Sheet (EPA Form 8700-22A), or an electronic manifest format that may be prepared and used in accordance with § 262.20(a)(3) of this chapter.
-
(a) Electronic manifests that are obtained, completed, and transmitted in accordance with § 262.20(a)(3), and used in accordance with this section in lieu of EPA Forms 8700-22 and 8700-22A are the legal equivalent of paper manifest forms bearing handwritten signatures, and satisfy for all purposes any requirement in these regulations to obtain, complete, sign, provide, use, or retain a manifest.(1) Any requirement in these regulations to sign a manifest or manifest certification by hand, or to obtain a handwritten signature, is satisfied by signing with or obtaining a valid and enforceable electronic signature within the meaning of 262.25.(2) Any requirement in these regulations to give, provide, send, forward, or return to another person a copy of the manifest is satisfied when an electronic manifest is transmitted to the other person by submission to the system.(3) Any requirement in these regulations for a generator to keep or retain a copy of each manifest is satisfied by retention of a signed electronic manifest in the generator's account on the national e-Manifest system, provided that such copies are readily available for viewing and production if requested by any EPA or authorized state inspector.(4) No generator may be held liable for the inability to produce an electronic manifest for inspection under this section if the generator can demonstrate that the inability to produce the electronic manifest is due exclusively to a technical difficulty with the electronic manifest system for which the generator bears no responsibility.
-
(1) A transporter may not accept hazardous waste from a generator unless the transporter is also provided with a manifest form (EPA Form 8700-22, and if necessary, EPA Form 8700-22A) signed in accordance with the requirement of § 262.23, or is provided with an electronic manifest that is obtained, completed, and transmitted in accordance with § 262.20(a)(3) of this chapter, and signed with a valid and enforceable electronic signature as described in 40 CFR 262.25.
-
(f) Electronic manifests that are obtained, completed, and transmitted in accordance with § 262.20(a)(3) of this chapter, and used in accordance with this section in lieu of the paper manifest form are the legal equivalent of paper manifest forms bearing handwritten signatures, and satisfy for all purposes any requirement in these regulations to obtain, complete, sign, provide, use, or retain a manifest.(1) Any requirement in these regulations for the owner or operator of a facility to sign a manifest or manifest certification by hand, or to obtain a handwritten signature, is satisfied by signing with or obtaining a valid and enforceable electronic signature within the meaning of 40 CFR 262.25.(2) Any requirement in these regulations to give, provide, send, forward, or to return to another person a copy of the manifest is satisfied when a copy of an electronic manifest is transmitted to the other person.(3) Any requirement in these regulations for a manifest to accompany a hazardous waste shipment is satisfied when a copy of an electronic manifest is accessible during transportation and forwarded to the person or persons who are scheduled to receive delivery of the waste shipment.(4) Any requirement in these regulations for an owner or operator to keep or retain a copy of each manifest is satisfied by the retention of the facility's electronic manifest copies in its account on the e-Manifest system, provided that such copies are readily available for viewing and production if requested by any EPA or authorized state inspector.(5) No owner or operator may be held liable for the inability to produce an electronic manifest for inspection under this section if the owner or operator can demonstrate that the inability to produce the electronic manifest is due exclusively to a technical difficulty with the electronic manifest system for which the owner or operator bears no responsibility.
-
(f) Electronic manifests that are obtained, completed, and transmitted in accordance with § 262.20(a)(3) of this chapter, and used in accordance with this section in lieu of the paper manifest form are the legal equivalent of paper manifest forms bearing handwritten signatures, and satisfy for all purposes any requirement in these regulations to obtain, complete, sign, provide, use, or retain a manifest.(1) Any requirement in these regulations for the owner or operator of a facility to sign a manifest or manifest certification by hand, or to obtain a handwritten signature, is satisfied by signing with or obtaining a valid and enforceable electronic signature within the meaning of 40 CFR 262.25.(2) Any requirement in these regulations to give, provide, send, forward, or to return to another person a copy of the manifest is satisfied when a copy of an electronic manifest is transmitted to the other person.(3) Any requirement in these regulations for a manifest to accompany a hazardous waste shipment is satisfied when a copy of an electronic manifest is accessible during transportation and forwarded to the person or persons who are scheduled to receive delivery of the hazardous waste shipment.(4) Any requirement in these regulations for an owner or operator to keep or retain a copy of each manifest is satisfied by the retention of the facility's electronic manifest copies in its account on the e-Manifest system, provided that such copies are readily available for viewing and production if requested by any EPA or authorized state inspector.(5) No owner or operator may be held liable for the inability to produce an electronic manifest for inspection under this section if the owner or operator can demonstrate that the inability to produce the electronic manifest is due exclusively to a technical difficulty with the EPA system for which the owner or operator bears no responsibility.
-
(2) Electronic manifests that are obtained, completed, and transmitted in accordance with § 262.20(a)(3) of this chapter, and used in accordance with §§ 262.20, 262.24, and 262.25 of this chapter in lieu of EPA Forms 8700-22 and 8700-22A, are the legal equivalent of paper manifest forms bearing handwritten signatures, and satisfy for all purposes any requirement in subpart K of this part to obtain, complete, sign, provide, use, or retain a manifest.(i) Any requirement in subpart K of this part to sign a manifest or manifest certification by hand, or to obtain a handwritten signature, is satisfied by signing with or obtaining a valid and enforceable electronic signature within the meaning of § 262.25 of this chapter.(ii) Any requirement in subpart K of this part to give, provide, send, forward, or return to another person a copy of the manifest is satisfied when an electronic manifest is transmitted to the other person by submission to the EPA e-Manifest system.(iii) Any requirement in subpart K of this part for a generator to keep or retain a copy of each manifest is satisfied by retention of a signed electronic manifest in the generator's account on the EPA e-Manifest system, provided that such copies are readily available for viewing and production if requested by any the EPA or authorized State inspector.(iv) No generator may be held liable for the inability to produce an electronic manifest for inspection under this section if the generator can demonstrate that the inability to produce the electronic manifest is due exclusively to a technical difficulty with the e-Manifest system for which the generator bears no responsibility.(v) After facilities have certified that the manifest is complete, by signing it at the time of submission to the EPA e-Manifest system, any post-receipt data corrections may be submitted at any time by any interested person (e.g., waste handler) named on the manifest. If corrections are requested by the Director for portions of the manifest that a generator, transporter, or a commercial storage or disposal facility is required to complete, those PCB waste handlers must address the data correction within 30 days from the date of the request. Data corrections must be made electronically via the post-receipt data corrections process described in § 265.71(l) of this chapter, which applies to corrections made to either paper or electronic manifests. Generators who are not registered with the EPA e-Manifest system must arrange with interested persons shown on the manifest to electronically submit manifest data corrections on their behalf within 30 days of the date of the correction request.
Citations to §262.20(d)
-
(4) In lieu of the requirements of § 262.20(d), where a shipment cannot be delivered for any reason to the receiving facility, the importer must instruct the transporter in writing via fax, email or mail to:(i) Return the hazardous waste to the foreign exporter or designate another facility within the United States; and
Citations to §262.20(e)
-
(1) The waste is being transported pursuant to a reclamation agreement as provided for in § 262.20(e);
-
(10) Small quantity generators with tolling agreements pursuant to 40 CFR 262.20(e) must comply with the applicable notification and certification requirements of paragraph (a) of this section for the initial shipment of the waste subject to the agreement. Such generators must retain on-site a copy of the notification and certification, together with the tolling agreement, for at least three years after termination or expiration of the agreement. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding the regulated activity or as requested by the Administrator.
-