§258.61. Post-closure care requirements. — Inbound Citations
40 C.F.R. § 258.61
Statutory Authority
Cited by 9 regulations in release Current.
Citations to 40 U.S.C. § 258.61 as a whole
-
The following definitions apply to this part:
-
(a) Existing MSWLF units that cannot make the demonstration specified in § 258.10(a), pertaining to airports, § 258.11(a), pertaining to floodplains, or § 258.15(a), pertaining to unstable areas, must close by October 9, 1996, in accordance with § 258.60 of this part and conduct post-closure activities in accordance with § 258.61 of this part.
-
-
(f) Once established at a MSWLF unit, ground-water monitoring shall be conducted throughout the active life and post-closure care period of that MSWLF unit as specified in § 258.61.
-
(a) The owner or operator must have a detailed written estimate, in current dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance with the post-closure plan developed under § 258.61 of this part. The post-closure cost estimate used to demonstrate financial assurance in paragraph (b) of this section must account for the total costs of conducting post-closure care, including annual and periodic costs as described in the post-closure plan over the entire post-closure care period. The owner or operator must notify the State Director that the estimate has been placed in the operating record.(1) The cost estimate for post-closure care must be based on the most expensive costs of post-closure care during the post-closure care period.(2) During the active life of the MSWLF unit and during the post-closure care period, the owner or operator must annually adjust the post-closure cost estimate for inflation.(3) The owner or operator must increase the post-closure care cost estimate and the amount of financial assurance provided under paragraph (b) of this section if changes in the post-closure plan or MSWLF unit conditions increase the maximum costs of post-closure care.(4) The owner or operator may reduce the post-closure cost estimate and the amount of financial assurance provided under paragraph (b) of this section if the cost estimate exceeds the maximum costs of post-closure care remaining over the post-closure care period. The owner or operator must notify the State Director that the justification for the reduction of the post-closure cost estimate and the amount of financial assurance has been placed in the operating record.
Citations to §258.61(a)
-
(1) A description of the monitoring and maintenance activities required in § 258.61(a) for each MSWLF unit, and the frequency at which these activities will be performed;
Citations to §258.61(a)(3)
-
(1) In accordance with § 258.54(a), the owner and operator may modify the list of heavy metal detection monitoring parameters specified in appendix I of this part, as required during Post-Closure Care by § 258.61(a)(3), by replacing monitoring of the inorganic constituents, with the exception of arsenic, with the inorganic indicator parameters chloride, nitrate as nitrogen, sulfate, and total dissolved solids.
Citations to §258.61(c)(3)
-
(ii) Its use is restricted under § 258.61(c)(3).
Citations to §258.61(e)
-
(b) The owner or operator of each MSWLF unit must establish, in a manner in accordance with § 258.74, financial assurance for the costs of post-closure care as required under § 258.61 of this part. The owner or operator must provide continuous coverage for post-closure care until released from financial assurance requirements for post-closure care by demonstrating compliance with § 258.61(e).