§257.83. Inspection requirements for CCR surface impoundments. — Inbound Citations
40 C.F.R. § 257.83
Statutory Authority
Cited by 6 regulations in release Current.
Citations to 40 U.S.C. § 257.83 as a whole
-
(a) Unless otherwise provided, the criteria in §§ 257.1 through 257.4 are adopted for determining which solid waste disposal facilities and practices pose a reasonable probability of adverse effects on health or the environment under sections 1008(a)(3) and 4004(a) of the Resource Conservation and Recovery Act (The Act). Unless otherwise provided, the criteria in §§ 257.5 through 257.30 are adopted for purposes of ensuring that non-municipal non-hazardous waste disposal units that receive very small quantity generator (VSQG) waste do not present risks to human health and the environment taking into account the practicable capability of such units in accordance with section 4010(c) of the Act. Unless otherwise provided, the criteria in §§ 257.50 through 257.107 are adopted for determining which CCR landfills and CCR surface impoundments pose a reasonable probability of adverse effects on health or the environment under sections 1008(a)(3) and 4004(a) of the Act.(1) Facilities failing to satisfy any of the criteria in §§ 257.1 through 257.4 or §§ 257.5 through 257.30 or §§ 257.50 through 257.107 are considered open dumps, which are prohibited under section 4005 of the Act.(2) Practices failing to satisfy any of the criteria in §§ 257.1 through 257.4 or §§ 257.5 through 257.30 or §§ 257.50 through 257.107 constitute open dumping, which is prohibited under section 4005 of the Act.
Citations to §257.83(a)
-
(iii) No later than April 18, 2017, initiate the inspections by a qualified person as set forth by § 257.83(a).
-
(5) Documentation recording the results of each inspection and instrumentation monitoring by a qualified person as required by § 257.83(a), except each document must be maintained for five years after completion of closure by removal in accordance with § 257.102(c)(1) or (2) or until completion of post-closure care in accordance with § 257.104(e) or (g) irrespective of the time requirement specified in paragraph (b) of this section.
Citations to §257.83(b)
-
(iv) No later than July 19, 2017, complete the initial annual inspection by a qualified professional engineer as set forth by § 257.83(b).
Citations to §257.83(b)(2)
-
(6) The periodic inspection report as required by § 257.83(b)(2), except each inspection report must be maintained for five years after completion of closure by removal in accordance with § 257.102(c)(1) or (2) or until completion of post-closure care in accordance with § 257.104(e) or (g) irrespective of the time requirement specified in paragraph (b) of this section.
Citations to §257.83(b)(5)
-
(7) Documentation detailing the corrective measures taken to remedy the deficiency or release as required by §§ 257.83(b)(5) and 257.84(b)(5), except each document must be maintained for five years after completion of closure by removal in accordance with § 257.102(c)(1) or (2) or until completion of post-closure care in accordance with § 257.104(e) or (g) irrespective of the time requirement specified in paragraph (b) of this section.