§257.100. Inactive CCR surface impoundments and Legacy CCR surface impoundments.
40 C.F.R. § 257.100
(1) The information specified in paragraph (f)(1)(i)(A) through (C) of this section;
(2) A statement by the owner or operator that to the best of their knowledge or belief, existing and available information does not provide a sufficient basis to determine that the unit contained free liquids on or after October 19, 2015; and
(3) The details of a written field investigation work plan, including all of the following:
(i) A detailed description of the approach to characterize the physical, topographic, geologic, hydrogeologic, and hydraulic properties of the CCR in the unit and native geologic materials beneath and surrounding the unit, and how those properties will be used to investigate for the presence of free liquids in the CCR unit.
(ii) A detailed description of the methods and tools that will be employed to determine whether the unit contains free liquids, the rationale for choosing these methods and tools, how these methods and tools will be implemented, and at what level of spatial resolution at the CCR unit to identify and monitor for the presence of free liquids.
(iii) A detailed description of how groundwater elevations will be determined, and at what level of spatial resolution, in relation to the sides and bottom of the CCR unit and how any intersection of the groundwater table with the CCR unit will be evaluated, and at what level of spatial resolution.
(iv) A plan for evaluating stormwater flow over the surface of the unit, stormwater drainage from the unit, and stormwater infiltration into the unit and how those processes may result in the formation of free liquids in the CCR unit. This plan must include a current topographic map showing surface water flow and any pertinent natural or man-made features present relevant to stormwater drainage, infiltration and related processes.
(v) An estimated timeline to complete the workplan and make a determination if the CCR unit contains free liquids.
(vi) A narrative discussion of how the results from implementing the workplan will determine whether the unit contains free liquids specified.
(vii) A narrative discussion describing any anticipated problems that may be encountered during implementation of the workplan and what actions will be taken to resolve the problems, and anticipated timeframes necessary for such a contingency.
(viii) The owner or operator of the CCR unit must obtain a written certification from a qualified professional engineer stating that the field investigation work plan meets the requirements of paragraph (f)(1)(iii)(A)(3) of this section.
Notes, amendments, and revision history
Amendments
[89 FR 39105, May 8, 2024, as amended at 91 FR 5825, Feb. 10, 2026]
Source
Source: 80 FR 21468, Apr. 17, 2015, unless otherwise noted.
Authority
Authority: 42 U.S.C. 6907(a)(3), 6912(a)(1), 6927, 6944, 6945(a) and (d); 33 U.S.C. 1345(d) and (e).
Source
Source: 44 FR 53460, Sept. 13, 1979, unless otherwise noted.
Amendments
[89 FR 39105, May 8, 2024, as amended at 91 FR 5825, Feb. 10, 2026]