§147.2922. Monitoring and reporting requirements for wells authorized by permit.
40 C.F.R. § 147.2922
The owner/operator shall notify the Osage UIC office within 30 days of the date on which injection commenced.
The operator shall monitor the injection pressure (psi) and rate (bbl/day) at least monthly, with the results reported annually. The annual reports shall specify the types or methods used to generate the monitoring data.
The owner/operator shall notify the Osage UIC office within 30 days of any mechanical failure or down-hole problems involving well integrity, well workovers, or any noncompliance. (Operators should note the obligation to apply for and obtain a workover permit from the Bureau of Indian Affairs Osage Agency before reentering an injection well.) If the condition may endanger an USDW, the owner/operator shall notify the Osage UIC officer orally within 24 hours, with written notice including plans for testing and/or repair to be submitted within five days. If all the information is not available within five days, a followup report must be submitted within 30 days.
The owner/operator shall retain all monitoring records for three years, unless an enforcement action is pending, and then until three years after the enforcement action has been resolved.
The owner/operator shall notify the Osage UIC office in writing of a transfer of ownership at least 10 days prior to such transfer.
Notes, amendments, and revision history
Authority
Authority: Safe Drinking Water Act, 42 U.S.C. 300h.
Source
Source: 49 FR 45309, Nov. 15, 1984, unless otherwise noted.
Authority
Authority: 42 U.S.C. 300f et seq.; and 42 U.S.C. 6901 et seq.
Source
Source: 49 FR 20197, May 11, 1984, unless otherwise noted.