§146.61. Applicability.
40 C.F.R. § 146.61
Existing well means a Class I well which was authorized prior to August 25, 1988, by an approved State program, or an EPA-administered program or a well which has become a Class I well as a result of a change in the definition of the injected waste which would render the waste hazardous under § 261.3 of this part.
Injection interval means that part of the injection zone in which the well is screened, or in which the waste is otherwise directly emplaced.
New well means any Class I hazardous waste injection well which is not an existing well.
Transmissive fault or fracture is a fault or fracture that has sufficient permeability and vertical extent to allow fluids to move between formations.
Notes, amendments, and revision history
Source
Source: 53 FR 28148, July 26, 1988, unless otherwise noted.
Authority
Authority: Safe Drinking Water Act, 42 U.S.C. 300f et seq.; Resource Conservation and Recovery Act, 42 U.S.C. 6901 et seq.
Source
Source: 45 FR 42500, June 24, 1980, unless otherwise noted.