§127.2. Definitions. — Inbound Citations
40 C.F.R. § 127.2
Statutory Authority
Cited by 25 regulations in release Current.
Citations to 40 C.F.R. § 127.2 as a whole
-
(f) A state, tribe, or territory that is designated by EPA as an initial recipient of electronic NPDES information, as defined in § 127.2 of this chapter, must maintain the data it collects and electronically transfer the minimum set of NPDES data to EPA through timely data transfers in compliance with all requirements of 40 CFR parts 3 and 127 (including the required data elements in appendix A to part 127). Timely means that the authorized state, tribe, or territory submits these data transfers (see the data elements in appendix A to 40 CFR part 127) to EPA within 40 days of when the state, tribe, or territory completed the activity or received a report submitted by a regulated entity. For example, the data regarding a state inspection of an NPDES-regulated entity that is finalized by the state on October 5th must be electronically transferred to EPA no later than November 14th of that same year (e.g., 40 days after October 5th). EPA must become the initial recipient of electronic NPDES information from NPDES-regulated entities if the state, tribe, or territory does not consistently maintain these timely data transfers or does not comply with 40 CFR parts 3 and 127. See 40 CFR 127.2(b) and 127.27 regarding the initial recipient.
Citations to §127.2(b)
-
(C) As of December 21, 2025 or an EPA-approved alternative date (see 40 CFR 127.24(e) or (f)), all certifications submitted in compliance with paragraphs (b)(15)(i)(A) and (B) of this section must be submitted electronically by the owner or operator to the Director or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D to part 3), § 122.22, and 40 CFR part 127. 40 CFR part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of 40 CFR part 127, owners or operators may be required to report electronically if specified by a particular permit or if required to do so by state law.
-
(i) Except as provided in paragraphs (b)(2)(v) and (vi) of this section, dischargers (or treatment works treating domestic sewage) seeking coverage under a general permit shall submit to the Director a notice of intent to be covered by the general permit. A discharger (or treatment works treating domestic sewage) who fails to submit a notice of intent in accordance with the terms of the permit is not authorized to discharge, (or in the case of sludge disposal permit, to engage in a sludge use or disposal practice), under the terms of the general permit unless the general permit, in accordance with paragraph (b)(2)(v), contains a provision that a notice of intent is not required or the Director notifies a discharger (or treatment works treating domestic sewage) that it is covered by a general permit in accordance with paragraph (b)(2)(vi). A complete and timely, notice of intent (NOI), to be covered in accordance with general permit requirements, fulfills the requirements for permit applications for purposes of §§ 122.6, 122.21, and 122.26. As of December 21, 2025 or an EPA-approved alternative date (see 40 CFR 127.24(e) or (f)), all notices of intent submitted in compliance with this section must be submitted electronically by the discharger (or treatment works treating domestic sewage) to the Director or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D to part 3), § 122.22, and 40 CFR part 127. 40 CFR part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of 40 CFR part 127, discharger (or treatment works treating domestic sewage) may be required to report electronically if specified by a particular permit or if required to do so by state law.
-
(3) Unless the permittee is relying on another entity to satisfy its NPDES permit obligations under § 122.35(a), the permittee must submit annual reports to the NPDES permitting authority for its first permit term. For subsequent permit terms, the permittee must submit reports in year two and four unless the NPDES permitting authority requires more frequent reports. As of December 21, 2025 or an EPA-approved alternative date (see 40 CFR 127.24(e) or (f)), all reports submitted in compliance with this section must be submitted electronically by the owner, operator, or the duly authorized representative of the small MS4 to the NPDES permitting authority or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D to part 3), § 122.22, and 40 CFR part 127. 40 CFR part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of 40 CFR part 127, the owner, operator, or the duly authorized representative of the small MS4 may be required to report electronically if specified by a particular permit or if required to do so by state law. The report must include:(i) The status of compliance with permit terms and conditions;(ii) Results of information collected and analyzed, including monitoring data, if any, during the reporting period;(iii) A summary of the storm water activities the permittee proposes to undertake to comply with the permit during the next reporting cycle;(iv) Any changes made during the reporting period to the permittee's storm water management program; and(v) Notice that the permittee is relying on another governmental entity to satisfy some of the permit obligations (if applicable), consistent with § 122.35(a).
-
(i) Monitoring results must be reported on a Discharge Monitoring Report (DMR) or forms provided or specified by the Director for reporting results of monitoring of sludge use or disposal practices. As of December 21, 2016 all reports and forms submitted in compliance with this section must be submitted electronically by the permittee to the Director or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D to part 3), § 122.22, and 40 CFR part 127. Part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of part 127, permittees may be required to report electronically if specified by a particular permit or if required to do so by state law.
-
(c) The operator of a large or medium municipal separate storm sewer system or a municipal separate storm sewer that has been designated by the Director under § 122.26(a)(1)(v) must submit an annual report by the anniversary of the date of the issuance of the permit for such system. As of December 21, 2025 or an EPA-approved alternative date (see 40 CFR 127.24(e) or (f)), all reports submitted in compliance with this section must be submitted electronically by the owner, operator, or the duly authorized representative of the MS4 to the Director or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D to part 3), § 122.22, and 40 CFR part 127. 40 CFR part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of 40 CFR part 127, the owner, operator, or the duly authorized representative of the MS4 may be required to report electronically if specified by a particular permit or if required to do so by state law. The report shall include:(1) The status of implementing the components of the storm water management program that are established as permit conditions;(2) Such proposed changes shall be consistent with § 122.26(d)(2)(iii) of this part; and(3) Revisions, if necessary, to the assessment of controls and the fiscal analysis reported in the permit application under § 122.26(d)(2)(iv) and (d)(2)(v) of this part;(4) A summary of data, including monitoring data, that is accumulated throughout the reporting year;(5) Annual expenditures and budget for year following each annual report;(6) A summary describing the number and nature of enforcement actions, inspections, and public education programs;(7) Identification of water quality improvements or degradation;
-
(c) Permittees that wish to terminate their permit must submit a Notice of Termination (NOT) to their permitting authority. If requesting expedited permit termination procedures, a permittee must certify in the NOT that it is not subject to any pending State or Federal enforcement actions including citizen suits brought under State or Federal law. As of December 21, 2025 or an EPA-approved alternative date (see 40 CFR 127.24(e) or (f)), all NOTs submitted by general permit covered facilities in compliance with this section must be submitted electronically by the permittee to the Director or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D), § 122.22, and 40 CFR part 127. 40 CFR part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of 40 CFR part 127, the permittee may be required to report electronically if specified by a particular permit or if required to do so by State law.
-
(f) A state, tribe, or territory that is designated by EPA as an initial recipient of electronic NPDES information, as defined in § 127.2 of this chapter, must maintain the data it collects and electronically transfer the minimum set of NPDES data to EPA through timely data transfers in compliance with all requirements of 40 CFR parts 3 and 127 (including the required data elements in appendix A to part 127). Timely means that the authorized state, tribe, or territory submits these data transfers (see the data elements in appendix A to 40 CFR part 127) to EPA within 40 days of when the state, tribe, or territory completed the activity or received a report submitted by a regulated entity. For example, the data regarding a state inspection of an NPDES-regulated entity that is finalized by the state on October 5th must be electronically transferred to EPA no later than November 14th of that same year (e.g., 40 days after October 5th). EPA must become the initial recipient of electronic NPDES information from NPDES-regulated entities if the state, tribe, or territory does not consistently maintain these timely data transfers or does not comply with 40 CFR parts 3 and 127. See 40 CFR 127.2(b) and 127.27 regarding the initial recipient.
-
(a) Any information obtained or used in the administration of a State program shall be available to EPA upon request without restriction. This includes the timely data transfers in compliance with all requirements of 40 CFR parts 3 and 127 (including the required data elements in appendix A to part 127). If the information has been submitted to the State under a claim of confidentiality, the State must submit that claim to EPA when providing information under this section. Any information obtained from a State and subject to a claim of confidentiality will be treated in compliance with the regulations in 40 CFR part 2. If EPA obtains information from an authorized state NPDES program, which is not claimed to be confidential, EPA may make that information available to the public without further notice. Timely means that the authorized state, tribe, or territory submits these data transfers (see the data elements in appendix A to 40 CFR part 127) to EPA within 40 days of when the state, tribe, or territory completed the activity or received a report submitted by a regulated entity. For example, the data regarding a state inspection of an NPDES-regulated entity that is finalized by the state on October 5th must be electronically transferred to EPA no later than November 14th of that same year (e.g., 40 days after October 5th). EPA must become the initial recipient of electronic NPDES information from NPDES-regulated entities if the state, tribe, or territory does not consistently maintain these timely data transfers or does not comply with 40 CFR parts 3 and 127. See 40 CFR 127.2(b) and 127.27 regarding the initial recipient.
-
(a) Electronic submissions of the minimum set of NPDES data to the appropriate initial recipient, as defined in § 127.2(b), must be timely.(1) Measurement data (including information from discharge monitoring reports, self-monitoring data from industrial users located outside of approved local pretreatment programs, and similar self-monitoring data). The electronic submission of these data is due when that monitoring information is required to be reported in compliance with statutes, regulations, the NPDES permit, another control mechanism, or an enforcement order.(2) The electronic submission of this data is due when that program report data is required to be reported in compliance with statutes, regulations, the NPDES permit, another control mechanism, or an enforcement order.
-
(d) Episodic waivers from electronic reporting may be granted by the authorized NPDES program (EPA, or states, territories, and tribes that have received authorization to implement the NPDES program) or the initial recipient, as defined in § 127.2(b), in compliance accordance with this section and § 127.24, to NPDES permittees, facilities, and entities subject to this part see [§ 127.1(a)]. The following conditions apply to episodic waivers.(1) No waiver request from the NPDES permittee, facility or entity is required to obtain an episodic waiver from electronic reporting.(4) The authorized NPDES program or initial recipient will decide if the episodic waiver provision allows facilities and entities to delay their electronic submissions or to send hardcopy (paper) submissions. Episodic waivers are only available to facilities and entities in the following circumstances:(i) Large scale emergencies involving catastrophic circumstances beyond the control of the facilities, such as forces of nature (e.g., hurricanes, floods, fires, earthquakes) or other national disasters. The authorized NPDES program will make the determination if an episodic waiver is warranted in this case and must receive the hardcopy (paper) submissions.(ii) Prolonged electronic reporting system outages (i.e., outages longer than 96 hours). The initial recipient, which may also be the authorized NPDES program, will make the determination if an episodic waiver is warranted in this case and must receive the hardcopy (paper) submissions.
-
(c) NPDES permittees, facilities, and entities subject to this part see [§ 127.1(a)] must electronically submit the information listed in Table 1 in § 127.16(a) to the Director, Control Authority, Approval Authority, or initial recipient as identified in [§ 127.27, and as defined in § 127.2(b)]. EPA must identify and publish the initial recipient on an EPA Web site and in the Federal Register, by state and by NPDES data group see [§ 127.2(c)].
-
(2) NPDES information (NPDES Data Groups 2 through 10 in Tables 1 and 2 in appendix A to this part) from NPDES permittees, facilities, and entities subject to this part see [§ 127.1(a)] where the authorized state, tribe, or territory is the initial recipient as identified in [§ 127.27, and as defined in § 127.2(b)]. This includes NPDES information from NPDES permittees, facilities, and entities subject to this part that received a waiver from electronic reporting (see § 127.15).
-
(d) An authorized program must consistently maintain the requirements identified in paragraph (a) of this section in order to be the initial recipient, as defined in § 127.2(b). If the authorized program does not maintain these requirements, EPA must become the initial recipient (see § 127.27).
-
(e) A state, tribe, or territory that is designated by EPA as the initial recipient (see §§ 127.2(b) and 127.27) for a NPDES data group as defined in [§ 127.2(c)] may submit a request to EPA to establish an alternative compliance deadline for electronic reporting of one or more general permit reports, program reports, and related data elements (see Table 2 to appendix A). A State may request to establish an alternative compliance deadline for up to three years beyond the currently applicable date but not beyond December 21, 2028. It is the duty of the authorized NPDES program to apply for a new alternative compliance deadline.(i) Be submitted to EPA by the Director, as defined in 40 CFR 122.2;(ii) Identify each general permit, program report, and related data elements covered by the request and the corresponding alternative compliance deadline(s);(iii) Identify each facility covered by the request and the corresponding alternative compliance deadline(s) (Note: This only applies if the request covers some but not all facilities subject to the general permit or program report requirement);(iv) Be submitted at least 120 days prior to the applicable compliance deadline in Table 1 to 40 CFR 127.16 or an alternative compliance deadline previously approved by EPA; and(v) Provide a rationale for the delay and enough details (e.g., tasks, milestones, roles and responsibilities, necessary resources) to clearly describe how the program will successfully implement electronic reporting for general permit, program report, and related data elements covered by the request.(2) EPA will review each alternative compliance deadline request to see if it provides enough detail to accurately assess if the state has a reasonable plan to deploy electronic reporting by the requested alternative compliance deadline. EPA will return alternative compliance deadline requests with insufficient detail back to the Director within 30 days of receipt and provide recommendations. EPA intends to approve or deny each complete alternative compliance deadline request within 120 days of receipt. EPA will provide notice to the authorized NPDES program of EPA's approval or denial. The authorized NPDES program may re-apply if the initial request is denied by EPA.(3) EPA will update its website after it approves a request to clearly identify the approved alternative compliance deadlines for each facility, general permit report, program report, and related data elements by authorized NPDES program. EPA will also post each alternative compliance deadline request and the corresponding Agency approval or denial notice after each determination. EPA will provide updated information on its website.
-
(a) EPA and authorized state, tribe, and territory NPDES programs must follow the procedure in § 127.27 for determining the initial recipient of electronic NPDES information from NPDES-regulated facilities (see § 127.2(b)).
-
(1) Any Industrial User subject to a categorical Pretreatment Standard (except a Non-Significant Categorical User as defined in § 403.3(v)(2)), after the compliance date of such Pretreatment Standard, or, in the case of a New Source, after commencement of the discharge into the POTW, shall submit to the Control Authority during the months of June and December, unless required more frequently in the Pretreatment Standard or by the Control Authority or the Approval Authority, a report indicating the nature and concentration of pollutants in the effluent which are limited by such categorical Pretreatment Standards. In addition, this report shall include a record of measured or estimated average and maximum daily flows for the reporting period for the Discharge reported in paragraph (b)(4) of this section except that the Control Authority may require more detailed reporting of flows. In cases where the Pretreatment Standard requires compliance with a Best Management Practice (or pollution prevention alternative), the User shall submit documentation required by the Control Authority or the Pretreatment Standard necessary to determine the compliance status of the User. At the discretion of the Control Authority and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the Control Authority may modify the months during which the above reports are to be submitted. For Industrial Users for which EPA or the authorized state, tribe, or territory is the Control Authority, as of December 21, 2025 or an EPA-approved alternative date (see 40 CFR 127.24(e) or (f)), all reports submitted in compliance with this section must be submitted electronically by the industrial user to the Control Authority or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR part 3 (including, in all cases, subpart D to part 3), 40 CFR 122.22, and 40 CFR part 127. 40 CFR part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of 40 CFR part 127, the Industrial Users for which EPA or the authorized state, tribe, or territory is the Control Authority may be required to report electronically if specified by a particular control mechanism or if required to do so by state law.
Citations to §127.2(c)
-
(9) The owner, operator, or the duly authorized representative of an NPDES-regulated entity is required to electronically submit the required NPDES information (as specified in appendix A to 40 CFR part 127) to the appropriate initial recipient, as determined by EPA, and as defined in § 127.2(b) of this chapter. EPA will identify and publish the list of initial recipients on its Web site and in the Federal Register, by state and by NPDES data group see [§ 127.2(c) of this chapter]. EPA will update and maintain this listing.
-
(g) A state, tribe, or territory that newly seeks to implement an NPDES program after March 21, 2016 must describe whether the state, tribe, or territory will be the initial recipient of electronic NPDES information from NPDES-regulated facilities for specific NPDES data groups (see 40 CFR 127.2(c) and 127.27). In this program description, the state, tribe, or territory must identify the specific NPDES data groups for which the state, tribe, or territory will be the initial recipient of electronic NPDES information from NPDES-regulated facilities and how the electronic data system of the state, tribe, or territory will be compliant with 40 CFR part 3 (including, in all cases, subpart D to part 3), § 123.26, and 40 CFR part 127.
-
(c) NPDES permittees, facilities, and entities subject to this part see [§ 127.1(a)] must electronically submit the information listed in Table 1 in § 127.16(a) to the Director, Control Authority, Approval Authority, or initial recipient as identified in [§ 127.27, and as defined in § 127.2(b)]. EPA must identify and publish the initial recipient on an EPA Web site and in the Federal Register, by state and by NPDES data group see [§ 127.2(c)].
-
(3) Complete, in that 95% or more of submissions required for each NPDES data group see [§ 127.2(c)] are available in EPA's national NPDES data system; and
-
(e) A state, tribe, or territory that is designated by EPA as the initial recipient (see §§ 127.2(b) and 127.27) for a NPDES data group as defined in [§ 127.2(c)] may submit a request to EPA to establish an alternative compliance deadline for electronic reporting of one or more general permit reports, program reports, and related data elements (see Table 2 to appendix A). A State may request to establish an alternative compliance deadline for up to three years beyond the currently applicable date but not beyond December 21, 2028. It is the duty of the authorized NPDES program to apply for a new alternative compliance deadline.(i) Be submitted to EPA by the Director, as defined in 40 CFR 122.2;(ii) Identify each general permit, program report, and related data elements covered by the request and the corresponding alternative compliance deadline(s);(iii) Identify each facility covered by the request and the corresponding alternative compliance deadline(s) (Note: This only applies if the request covers some but not all facilities subject to the general permit or program report requirement);(iv) Be submitted at least 120 days prior to the applicable compliance deadline in Table 1 to 40 CFR 127.16 or an alternative compliance deadline previously approved by EPA; and(v) Provide a rationale for the delay and enough details (e.g., tasks, milestones, roles and responsibilities, necessary resources) to clearly describe how the program will successfully implement electronic reporting for general permit, program report, and related data elements covered by the request.(2) EPA will review each alternative compliance deadline request to see if it provides enough detail to accurately assess if the state has a reasonable plan to deploy electronic reporting by the requested alternative compliance deadline. EPA will return alternative compliance deadline requests with insufficient detail back to the Director within 30 days of receipt and provide recommendations. EPA intends to approve or deny each complete alternative compliance deadline request within 120 days of receipt. EPA will provide notice to the authorized NPDES program of EPA's approval or denial. The authorized NPDES program may re-apply if the initial request is denied by EPA.(3) EPA will update its website after it approves a request to clearly identify the approved alternative compliance deadlines for each facility, general permit report, program report, and related data elements by authorized NPDES program. EPA will also post each alternative compliance deadline request and the corresponding Agency approval or denial notice after each determination. EPA will provide updated information on its website.
-
(d) A state, tribe, or territory that is designated by EPA as the initial recipient see §§ [127.2(b) and 127.27] for an NPDES data group as defined in [§ 127.2(c)] must electronically collect and maintain the minimum set of NPDES data (as specified in appendix A to this part) and electronically transfer these data to EPA's national NPDES data system through timely, accurate, complete, and consistent electronic data transfers in compliance with this part (including §§ 127.22 and 127.23) and 40 CFR part 3.
Citations to §127.2(f)
-
(iv) These include failure to submit a required report within 30 days after the date established in a permit, administrative or judicial order, or regulation. These reports only include final compliance schedule progress reports, Discharge Monitoring Reports (see 40 CFR 122.41(l)(4)(i)), and program reports (see 40 CFR 127.2(f)). In addition, these violations also include any failure to comply with the reporting requirements at 40 CFR 122.41(l)(6).
Citations to §127.2(g)
-
(g) Authorized state, tribe, or territory NPDES programs may elect to use the Hybrid Approach as defined in [§ 127.2(g)] for the collection of the minimum set of NPDES data contained in construction stormwater general permit reports see Table 1 in [§ 127.16(a)].