US Codex
C.F.R.
Browse by date
Notes

§112.2. Definitions. — Inbound Citations

40 C.F.R. § 112.2

Cited by 3 regulations in release Current.

Citations to 40 C.F.R. § 112.2 as a whole

  • (A) Revisions to Texas Air Control Board (TACB), Regulation II, 31 TAC Chapter 112, Section 112.1, “Definitions;” Section 112.2, “Compliance, Reporting, and Recordkeeping;” Section 112.3, “Net Ground Level Concentrations;” Section 112.4, “Net Ground Level Concentration—Exemption Conditions;” Section 112.5, “Allowable Emission Rates—Sulfuric Acid Plant Burning Elemental Sulfur;” Section 112.6, “Allowable Emission Rates—Sulfuric Acid Plant;” Section 112.7, “Allowable Emission Rates—Sulfur Recovery Plant;” Section 112.8, “Allowable Emission Rates From Solid Fossil Fuel-Fired Steam Generators,” Subsections 112.8(a), except for the phrase “Except as provided in subsection (b) of this section,” 112.8(c), 112.8(d), 112.8(e); Section 112.9, “Allowable Emission Rates—Combustion of Liquid Fuel;” Section 112.14, “Allowable Emission Rates—Nonferrous Smelter Processes;” Section 112.15, “Temporary Fuel Shortage Plan Filing Requirements;” Section 112.16, “Temporary Fuel Shortage Plan Operating Requirements;” Section 112.17, “Temporary Fuel Shortage Plan Notification Procedures;” Section 112.18, “Temporary Fuel Shortage Plan Reporting Requirements;” Section 112.19, “Application for Area Control Plan;” Section 112.20, “Exemption Procedure;” and Section 112.21, “Allowable Emission Rates Under Area Control Plan,” as adopted by the TACB on September 18, 1992.
  • (2) Any completely buried tank as defined in § 112.2;
  • (3) If your farm, as defined in § 112.2, was in operation on or before August 16, 2002, you must maintain your Plan, but must amend it, if necessary to ensure compliance with this part, and implement the amended Plan on or before May 10, 2013. If your farm becomes operational after August 16, 2002, through May 10, 2013, and could reasonably be expected to have a discharge as described in § 112.1(b), you must prepare and implement a Plan on or before May 10, 2013. If your farm becomes operational after May 10, 2013, and could reasonably be expected to have a discharge as described in § 112.1(b), you must prepare and implement a Plan before you begin operations.