§9.73. If I don't need an operations permit, are there still requirements that I must meet? — Inbound Citations
36 C.F.R. § 9.73
Statutory Authority
Cited by 2 regulations in release Current.
Citations to 36 C.F.R. § 9.73 as a whole
-
(a) Except as provided in §§ 9.70 through 9.73, you must obtain a temporary access permit under §§ 9.60 through 9.63 or an operations permit under §§ 9.80 through 9.90 before conducting operations.
-
(a) Except as otherwise provided in §§ 9.70 through 9.73, an operator proposing to conduct operations within the boundary of a System unit must submit an application for an operations permit to the Superintendent.