§9.72. How will the NPS act on my submission? — Inbound Citations
36 C.F.R. § 9.72
Statutory Authority
Cited by 4 regulations in release Current.
Citations to 36 C.F.R. § 9.72 as a whole
-
(b) If the previous operator was granted an exemption under § 9.72, you must provide the Superintendent the following information within 30 calendar days after the date you acquire the rights to conduct operations:(1) Right to operate documentation demonstrating that you are the successor in interest to the previous operator's right, and the extent of such right, to operate within the System unit; and(i) The operator;(ii) The owner; and(iii) The individuals responsible for overall management, field supervision, and emergency response of the proposed operations.
-
(a) Except as provided in §§ 9.70 through 9.73, you must obtain a temporary access permit under §§ 9.60 through 9.63 or an operations permit under §§ 9.80 through 9.90 before conducting operations.
-
If the NPS notifies you under § 9.72 that you do not need an operations permit, your operations are still subject to the general terms and conditions in §§ 9.120 through 9.122, the prohibitions and penalties in §§ 9.180 through 9.182, and the requirements in this section.
-
(a) Except as otherwise provided in §§ 9.70 through 9.73, an operator proposing to conduct operations within the boundary of a System unit must submit an application for an operations permit to the Superintendent.