§228.53. Term. — Inbound Citations
36 C.F.R. § 228.53
Statutory Authority
Cited by 6 regulations in release Current.
Citations to 36 U.S.C. § 228.53 as a whole
-
(d) Title to the mineral materials vests in the purchaser or permittee immediately before excavation, subject to the provisions of §§ 228.47 through 228.56 and other provisions of the contract or permit. Title to excavated material not removed within the time provided revests in the United States.
-
(c) The terms and conditions will be evaluated on an individual case basis. Only those mineral materials specified in the contract may be removed by the purchaser. Before a preference right negotiated contract is awarded, the authorized officer must ensure that an environmental analysis is conducted. All contracts are subject to the conditions under §§ 228.47 through 228.56.
Citations to §228.53(b)
-
If an extension of time is granted as provided in § 228.53(b), the authorized officer must reappraise or reestimate the mineral materials covered by the contract or permit and which remain unexcavated at the time of extension. The recalculated unit value becomes the new unit value for the remaining unexcavated material; excavated and stockpiled material is not subject to reappraisal.
-
(a) Before operations may begin under any contract or permit, a bond must be furnished to the authorized officer to ensure performance of payment (as necessary), reclamation, and other conditions of the contract or permit, except as noted in paragraphs (a) (1) and (3) of this section, where the authorized officer may waive such bonding. If an extension of time is granted as provided in § 228.53(b), the bond requirements must be recalculated and changed accordingly.(1) For advance payment contracts for 10,000 cubic yards or more in volume (or weight equivalent), a bond of not less than 10 percent of the total contract price or the value of the estimated annual production (whichever is less), plus the reclamation cost for the area covered by annual mining, is required. When the total volume is less than 10,000 cubic yards, bond requirements, if any, are at the discretion of the authorized officer.(2) For any deferred payment contract, a bond equaling the value of the estimated annual production plus the reclamation cost for the area covered by annual mining is required.(3) For free use, the authorized officer may require a reclamation bond which must be sufficient to cover the cost of reclamation of the anticipated annual work.
-
(b) Permits may be issued for periods not to exceed 1 year and will terminate on the expiration date unless extended by the authorized officer as in § 228.53(b). However, the authorized officer may issue permits to any local, State, Federal, or Territorial agency, unit or subdivision, including municipalities and county road districts, for periods up to 10 years.
-
(a) The following sections of this subpart contain information collection requirements as defined in the Paperwork Reduction Act of 1980 (5 CFR part 1320): § 228.45, Qualifications of applicants; § 228.51, Bonding; § 228.52(b)(1), Requirements of assignee; § 228.53(b), Extension of time; § 228.56, Operating plans; § 228.57(c), Conduct of sales; § 228.60, Prospecting permits; § 228.61, Preference right negotiated sales; and § 228.62, Free use. These requirements have been approved by the Office of Management and Budget and assigned clearance number 0596-0081.