§228.4. Plan of operations—notice of intent—requirements. — Inbound Citations
36 C.F.R. § 228.4
Statutory Authority
Cited by 20 regulations in release Current.
Citations to 36 U.S.C. § 228.4 as a whole
-
(a) In addition to the activities for which a plan of operations is required under § 228.4 of this chapter, a plan of operations is required when a proposed operation within the SRNRA involves mechanical or motorized equipment, including a suction dredge and/or sluice.
Citations to §228.4(2)
-
(b) Any person conducting operations on the effective date of these regulations, who would have been required to submit a plan of operations under § 228.4(a), may continue operations but shall within 120 days thereafter submit a plan of operations to the District Ranger having jurisdiction over the area within which operations are being conducted: Provided, however, That upon a showing of good cause the authorized officer will grant an extension of time for submission of a plan of operations, not to exceed an additional 6 months. Operations may continue according to the submitted plan during its review, unless the authorized officer determines that the operations are unnecessarily or unreasonably causing irreparable damage to surface resources and advises the operator of those measures needed to avoid such damage. Upon approval of a plan of operations, operations shall be conducted in accordance with the approved plan. The requirement to submit a plan of operations shall not apply: (1) To operations excepted in § 228.4(a) or (2) to operations concluded prior to the effective date of the regulations in this part.
Citations to §228.4(a)
-
An operator is entitled to access in connection with operations, but no road, trail, bridge, landing area for aircraft, or the like, shall be constructed or improved, nor shall any other means of access, including but not limited to off-road vehicles, be used until the operator has received approval of an operating plan in writing from the authorized officer when required by § 228.4(a). Proposals for construction, improvement or use of such access as part of a plan of operations shall include a description of the type and standard of the proposed means of access, a map showing the proposed route of access, and a description of the means of transportation to be used. Approval of the means of such access as part of a plan of operations shall specify the location of the access route, design standards, means of transportation, and other conditions reasonably necessary to protect the environment and forest surface resources, including measures to protect scenic values and to insure against erosion and water or air pollution.
-
(b) Any person conducting operations on the effective date of these regulations, who would have been required to submit a plan of operations under § 228.4(a), may continue operations but shall within 120 days thereafter submit a plan of operations to the District Ranger having jurisdiction over the area within which operations are being conducted: Provided, however, That upon a showing of good cause the authorized officer will grant an extension of time for submission of a plan of operations, not to exceed an additional 6 months. Operations may continue according to the submitted plan during its review, unless the authorized officer determines that the operations are unnecessarily or unreasonably causing irreparable damage to surface resources and advises the operator of those measures needed to avoid such damage. Upon approval of a plan of operations, operations shall be conducted in accordance with the approved plan. The requirement to submit a plan of operations shall not apply: (1) To operations excepted in § 228.4(a) or (2) to operations concluded prior to the effective date of the regulations in this part.
-
(a) Operations shall be conducted in accordance with an approved plan of operations, except as provided in paragraph (b) of this section and in § 228.4 (a), (b), and (e). A proposed plan of operation shall be submitted to the District Ranger, who shall promptly acknowledge receipt thereof to the operator. The authorized officer shall, within thirty (30) days of such receipt, analyze the proposal, considering the economics of the operation along with the other factors in determining the reasonableness of the requirements for surface resource protection, and;(1) Notify the operator that he has approved the plan of operations; or(2) Notify the operator that the proposed operations are such as not to require an operating plan; or(3) Notify the operator of any changes in, or additions to, the plan of operations deemed necessary to meet the purpose of the regulations in this part; or(4) Notify the operator that the plan is being reviewed, but that more time, not to exceed an additional sixty (60) days, is necessary to complete such review, setting forth the reasons why additional time is needed: Provided, however, That days during which the area of operations is inaccessible for inspection shall not be included when computing the sixty (60) day period; or(5) Notify the operator that the plan cannot be approved until a final environmental statement has been prepared and filed with the Council on Environmental Quality as provided in § 228.4(f).
Citations to §228.4(a)(1)(i)
-
(3) An operator shall submit a proposed plan of operations to the District Ranger having jurisdiction over the area in which operations will be conducted in lieu of a notice of intent to operate if the proposed operations will likely cause a significant disturbance of surface resources. An operator also shall submit a proposed plan of operations, or a proposed supplemental plan of operations consistent with § 228.4(d), to the District Ranger having jurisdiction over the area in which operations are being conducted if those operations are causing a significant disturbance of surface resources but are not covered by a current approved plan of operations. The requirement to submit a plan of operations shall not apply to the operations listed in paragraphs (a)(1)(i) through (v). The requirement to submit a plan of operations also shall not apply to operations which will not involve the use of mechanized earthmoving equipment, such as bulldozers or backhoes, or the cutting of trees, unless those operations otherwise will likely cause a significant disturbance of surface resources.
Citations to §228.4(a)(1)(ii)
-
(3) An operator shall submit a proposed plan of operations to the District Ranger having jurisdiction over the area in which operations will be conducted in lieu of a notice of intent to operate if the proposed operations will likely cause a significant disturbance of surface resources. An operator also shall submit a proposed plan of operations, or a proposed supplemental plan of operations consistent with § 228.4(d), to the District Ranger having jurisdiction over the area in which operations are being conducted if those operations are causing a significant disturbance of surface resources but are not covered by a current approved plan of operations. The requirement to submit a plan of operations shall not apply to the operations listed in paragraphs (a)(1)(i) through (v). The requirement to submit a plan of operations also shall not apply to operations which will not involve the use of mechanized earthmoving equipment, such as bulldozers or backhoes, or the cutting of trees, unless those operations otherwise will likely cause a significant disturbance of surface resources.
Citations to §228.4(a)(1)(iii)
-
(3) An operator shall submit a proposed plan of operations to the District Ranger having jurisdiction over the area in which operations will be conducted in lieu of a notice of intent to operate if the proposed operations will likely cause a significant disturbance of surface resources. An operator also shall submit a proposed plan of operations, or a proposed supplemental plan of operations consistent with § 228.4(d), to the District Ranger having jurisdiction over the area in which operations are being conducted if those operations are causing a significant disturbance of surface resources but are not covered by a current approved plan of operations. The requirement to submit a plan of operations shall not apply to the operations listed in paragraphs (a)(1)(i) through (v). The requirement to submit a plan of operations also shall not apply to operations which will not involve the use of mechanized earthmoving equipment, such as bulldozers or backhoes, or the cutting of trees, unless those operations otherwise will likely cause a significant disturbance of surface resources.
Citations to §228.4(a)(1)(iv)
-
(3) An operator shall submit a proposed plan of operations to the District Ranger having jurisdiction over the area in which operations will be conducted in lieu of a notice of intent to operate if the proposed operations will likely cause a significant disturbance of surface resources. An operator also shall submit a proposed plan of operations, or a proposed supplemental plan of operations consistent with § 228.4(d), to the District Ranger having jurisdiction over the area in which operations are being conducted if those operations are causing a significant disturbance of surface resources but are not covered by a current approved plan of operations. The requirement to submit a plan of operations shall not apply to the operations listed in paragraphs (a)(1)(i) through (v). The requirement to submit a plan of operations also shall not apply to operations which will not involve the use of mechanized earthmoving equipment, such as bulldozers or backhoes, or the cutting of trees, unless those operations otherwise will likely cause a significant disturbance of surface resources.
Citations to §228.4(a)(1)(v)
-
(3) An operator shall submit a proposed plan of operations to the District Ranger having jurisdiction over the area in which operations will be conducted in lieu of a notice of intent to operate if the proposed operations will likely cause a significant disturbance of surface resources. An operator also shall submit a proposed plan of operations, or a proposed supplemental plan of operations consistent with § 228.4(d), to the District Ranger having jurisdiction over the area in which operations are being conducted if those operations are causing a significant disturbance of surface resources but are not covered by a current approved plan of operations. The requirement to submit a plan of operations shall not apply to the operations listed in paragraphs (a)(1)(i) through (v). The requirement to submit a plan of operations also shall not apply to operations which will not involve the use of mechanized earthmoving equipment, such as bulldozers or backhoes, or the cutting of trees, unless those operations otherwise will likely cause a significant disturbance of surface resources.
Citations to §228.4(b)
-
(a) Operations shall be conducted in accordance with an approved plan of operations, except as provided in paragraph (b) of this section and in § 228.4 (a), (b), and (e). A proposed plan of operation shall be submitted to the District Ranger, who shall promptly acknowledge receipt thereof to the operator. The authorized officer shall, within thirty (30) days of such receipt, analyze the proposal, considering the economics of the operation along with the other factors in determining the reasonableness of the requirements for surface resource protection, and;(1) Notify the operator that he has approved the plan of operations; or(2) Notify the operator that the proposed operations are such as not to require an operating plan; or(3) Notify the operator of any changes in, or additions to, the plan of operations deemed necessary to meet the purpose of the regulations in this part; or(4) Notify the operator that the plan is being reviewed, but that more time, not to exceed an additional sixty (60) days, is necessary to complete such review, setting forth the reasons why additional time is needed: Provided, however, That days during which the area of operations is inaccessible for inspection shall not be included when computing the sixty (60) day period; or(5) Notify the operator that the plan cannot be approved until a final environmental statement has been prepared and filed with the Council on Environmental Quality as provided in § 228.4(f).
Citations to §228.4(c)(1)
-
(c) In addition to the requirements of paragraph (b) of this section, a plan of operations must include the information required at §§ 228.4 (c)(1) through (c)(3) of this chapter which includes information about the proponent and a detailed description of the proposed operation. In addition, if the operator and claim owner are different, the operator must submit a copy of the authorization or agreement under which the proposed operations are to be conducted. A plan of operations must also address the environmental requirements of § 228.8 of this chapter which includes reclamation. In addition, a plan of operations also must include the following:(1) An identification of the hazardous materials and any other toxic materials, petroleum products, insecticides, pesticides, and herbicides that will be used during the mineral operation, and the proposed means for disposing of such substances;(2) An identification of the character and composition of the mineral wastes that will be used or generated and a proposed method or strategy for their placement, control, isolation, or removal; and
Citations to §228.4(c)(2)
-
(c) In addition to the requirements of paragraph (b) of this section, a plan of operations must include the information required at §§ 228.4 (c)(1) through (c)(3) of this chapter which includes information about the proponent and a detailed description of the proposed operation. In addition, if the operator and claim owner are different, the operator must submit a copy of the authorization or agreement under which the proposed operations are to be conducted. A plan of operations must also address the environmental requirements of § 228.8 of this chapter which includes reclamation. In addition, a plan of operations also must include the following:(1) An identification of the hazardous materials and any other toxic materials, petroleum products, insecticides, pesticides, and herbicides that will be used during the mineral operation, and the proposed means for disposing of such substances;(2) An identification of the character and composition of the mineral wastes that will be used or generated and a proposed method or strategy for their placement, control, isolation, or removal; and
Citations to §228.4(c)(3)
-
(c) In addition to the requirements of paragraph (b) of this section, a plan of operations must include the information required at §§ 228.4 (c)(1) through (c)(3) of this chapter which includes information about the proponent and a detailed description of the proposed operation. In addition, if the operator and claim owner are different, the operator must submit a copy of the authorization or agreement under which the proposed operations are to be conducted. A plan of operations must also address the environmental requirements of § 228.8 of this chapter which includes reclamation. In addition, a plan of operations also must include the following:(1) An identification of the hazardous materials and any other toxic materials, petroleum products, insecticides, pesticides, and herbicides that will be used during the mineral operation, and the proposed means for disposing of such substances;(2) An identification of the character and composition of the mineral wastes that will be used or generated and a proposed method or strategy for their placement, control, isolation, or removal; and
Citations to §228.4(d)
-
-
(3) An operator shall submit a proposed plan of operations to the District Ranger having jurisdiction over the area in which operations will be conducted in lieu of a notice of intent to operate if the proposed operations will likely cause a significant disturbance of surface resources. An operator also shall submit a proposed plan of operations, or a proposed supplemental plan of operations consistent with § 228.4(d), to the District Ranger having jurisdiction over the area in which operations are being conducted if those operations are causing a significant disturbance of surface resources but are not covered by a current approved plan of operations. The requirement to submit a plan of operations shall not apply to the operations listed in paragraphs (a)(1)(i) through (v). The requirement to submit a plan of operations also shall not apply to operations which will not involve the use of mechanized earthmoving equipment, such as bulldozers or backhoes, or the cutting of trees, unless those operations otherwise will likely cause a significant disturbance of surface resources.
-
(c) A supplemental plan or plans of operations provided for in § 228.4(d) and a modification of an approved operating plan as provided for in § 228.4(e) shall be subject to approval by the authorized officer in the same manner as the initial plan of operations: Provided, however, That a modification of an approved plan of operations under § 228.4(e) shall be subject to approval by the immediate superior of the authorized officer in cases where it has been determined that a modification is required.
Citations to §228.4(e)
-
-
(a) Operations shall be conducted in accordance with an approved plan of operations, except as provided in paragraph (b) of this section and in § 228.4 (a), (b), and (e). A proposed plan of operation shall be submitted to the District Ranger, who shall promptly acknowledge receipt thereof to the operator. The authorized officer shall, within thirty (30) days of such receipt, analyze the proposal, considering the economics of the operation along with the other factors in determining the reasonableness of the requirements for surface resource protection, and;(1) Notify the operator that he has approved the plan of operations; or(2) Notify the operator that the proposed operations are such as not to require an operating plan; or(3) Notify the operator of any changes in, or additions to, the plan of operations deemed necessary to meet the purpose of the regulations in this part; or(4) Notify the operator that the plan is being reviewed, but that more time, not to exceed an additional sixty (60) days, is necessary to complete such review, setting forth the reasons why additional time is needed: Provided, however, That days during which the area of operations is inaccessible for inspection shall not be included when computing the sixty (60) day period; or(5) Notify the operator that the plan cannot be approved until a final environmental statement has been prepared and filed with the Council on Environmental Quality as provided in § 228.4(f).
Citations to §228.4(f)
-
(5) Notify the operator that the plan cannot be approved until a final environmental statement has been prepared and filed with the Council on Environmental Quality as provided in § 228.4(f).