US Codex
C.F.R.
Browse by date
Notes

§200.4. Administrative issuances. — Inbound Citations

36 C.F.R. § 200.4

Cited by 7 regulations in release Current.

Citations to 36 C.F.R. § 200.4 as a whole

  • Publication of the indexes described in § 200.4 is deemed both unnecessary and impractical because of the large volume of material involved. However, copies of the indexes are available for public review in the Forest Service headquarters office in Washington, DC, and at field offices listed under § 200.2(d). The Forest Service will provide copies of any index upon request at a cost not to exceed the direct cost of duplication.
  • (d) Any request for information pursuant to the provisions of the Freedom of Information Act must be submitted in accordance with §§ 200.7 and 200.8. The Forest Service charges a fee for copies of records not generally made available to the public but released pursuant to a FOIA request in accordance with a schedule of fees established by the Department of Agriculture at 7 CFR Part 1, Subpart A, Appendix A. These fees do not apply to information that is generally and routinely made available to the public upon request, such as recreational brochures, pamphlets, maps, and technical guides as well as agency directive issuances. Separate charges for such general information are established in the agency's Directive System (§ 200.4). For example, some pamphlets and small segments of the Forest Service Manual and Handbook may be provided at no cost, but maps of the National Forest System and larger sections of the Manual and Handbook are available for a charge. Current charges are explained at the time the request is made.
  • The objective of Forest Service timber appraisals is to determine fair market value. Fair market value is estimated by such methods as are authorized by the Chief, Forest Service, through issuance of agency directives (36 CFR 200.4). Valid methods to determine fair market value include, but are not limited to, transaction evidence appraisals, analytical appraisals, comparison appraisals, and independent estimates based on average investments. Pertinent factors affecting market value also considered include, but are not limited to, prices paid and valuations established for comparable timber, selling value of products produced, estimated operating costs, operating difficulties, and quality of timber. Considerations and valuations may recognize and adjust for factors which are not normal market influences.
  • (v) For applications for planning permits, including those issued for a major development as described in paragraph (f)(3) of this section, the authorized officer shall assess only the applicant's financial and technical qualifications and determine compliance with other applicable laws, regulations, and orders. Planning permits may be categorically excluded from documentation in an environmental assessment or environmental impact statement pursuant to Forest Service Handbook 1909.15 (36 CFR 200.4).
  • (10) To enhance the reliability of the electric grid and to reduce the threat of wildfire damage to, and wildfire caused by vegetation-related conditions within or on, powerline facility rights-of-way and by hazard trees on abutting National Forest System lands, the Forest Service shall issue and periodically update directives in its directive system (36 CFR 200.4) to ensure that provisions are appropriately developed and implemented for powerline facility vegetation management, powerline facility inspection, and operation and maintenance of powerline facility rights-of-way. The directives shall:
    (i) Be developed in consultation with owners;
    (ii) Be compatible with mandatory reliability standards established by the Electric Reliability Organization;
    (iii) Consider all applicable law, including fire safety and electrical system reliability requirements, such as reliability standards established by the Electric Reliability Organization;
    (iv) Consider the 2016 Memorandum of Understanding on Vegetation Management for Powerline Rights-of-Way Among the Edison Electric Institute, Utility Arborist Association, the National Park Service, the U.S. Fish and Wildlife Service, the Bureau of Land Management, the Forest Service, and the U.S. Environmental Protection Agency, and any successor memorandum of understanding;
    (v) Seek to minimize the need for case-by-case approvals for routine vegetation management (including hazard tree felling and pruning), powerline facility inspection, and operation and maintenance of powerline facilities; and
  • (1) A decision by the authorized officer to assess a processing or monitoring fee or to determine the fee category or estimated costs is not subject to administrative appeal.

Citations to §200.4(c)