§325.1. Applications for permits. — Inbound Citations

33 C.F.R. § 325.1

Cited by 7 regulations in release Current.

Citations to §325.1(d)

  • (10) An application will be determined to be complete when sufficient information is received to issue a public notice (See 33 CFR 325.1(d) and 325.3(a).) The issuance of a public notice will not be delayed to obtain information necessary to evaluate an application.

Citations to §325.1(d)(1)

  • (a) Activities that require Corps authorization under 33 U.S.C. 1344, 33 U.S.C. 401, 33 U.S.C. 403, and 33 U.S.C. 1413 are reviewed (and when applicable, permitted) on a site-specific basis based upon an application containing a complete description of the proposed activity, and all activities which the applicant plans to undertake which are reasonably related to the same project and for which a Corps permit will be required. See 33 CFR 325.1(d)(1)-(2). However, only for reviews of activities under 33 U.S.C. 408, the District Engineer may prepare tiered environmental documents when conducting multi-phased reviews of proposed alterations or in other appropriate circumstances. Multi-phased reviews under 33 U.S.C. 408 evaluate proposed alterations in multiple successive iterations of progressively greater detail. Each successive review must be accompanied by a NEPA document that considers the potential impacts of the alteration at the level of detail of the given phase of review to help inform the development of the proposed alteration. The analysis in each environmental document will reflect the level of planning in each tier. For example, the first tier may consider the differing impacts of selecting different sites for the alteration, the second tier may consider different project configurations, and the final tier may consider the impacts from different construction methods. Each successive analysis should build off the previous analysis, formally incorporating the prior environmental documents.

Citations to §325.1(d)(2)

  • (a) Activities that require Corps authorization under 33 U.S.C. 1344, 33 U.S.C. 401, 33 U.S.C. 403, and 33 U.S.C. 1413 are reviewed (and when applicable, permitted) on a site-specific basis based upon an application containing a complete description of the proposed activity, and all activities which the applicant plans to undertake which are reasonably related to the same project and for which a Corps permit will be required. See 33 CFR 325.1(d)(1)-(2). However, only for reviews of activities under 33 U.S.C. 408, the District Engineer may prepare tiered environmental documents when conducting multi-phased reviews of proposed alterations or in other appropriate circumstances. Multi-phased reviews under 33 U.S.C. 408 evaluate proposed alterations in multiple successive iterations of progressively greater detail. Each successive review must be accompanied by a NEPA document that considers the potential impacts of the alteration at the level of detail of the given phase of review to help inform the development of the proposed alteration. The analysis in each environmental document will reflect the level of planning in each tier. For example, the first tier may consider the differing impacts of selecting different sites for the alteration, the second tier may consider different project configurations, and the final tier may consider the impacts from different construction methods. Each successive analysis should build off the previous analysis, formally incorporating the prior environmental documents.

Citations to §325.1(d)(7)

  • (1) For an activity that requires a standard DA permit pursuant to section 404 of the Clean Water Act, the public notice for the proposed activity must contain a statement explaining how impacts associated with the proposed activity are to be avoided, minimized, and compensated for. This explanation shall address, to the extent that such information is provided in the mitigation statement required by § 325.1(d)(7) of this chapter, the proposed avoidance and minimization and the amount, type, and location of any proposed compensatory mitigation, including any out-of-kind compensation, or indicate an intention to use an approved mitigation bank or in-lieu fee program. The level of detail provided in the public notice must be commensurate with the scope and scale of the impacts. The notice shall not include information that the district engineer and the permittee believe should be kept confidential for business purposes, such as the exact location of a proposed mitigation site that has not yet been secured. The permittee must clearly identify any information being claimed as confidential in the mitigation statement when submitted. In such cases, the notice must still provide enough information to enable the public to provide meaningful comment on the proposed mitigation.
  • (1) For an activity that requires a standard DA permit pursuant to section 404 of the Clean Water Act, the public notice for the proposed activity must contain a statement explaining how impacts associated with the proposed activity are to be avoided, minimized, and compensated for. This explanation shall address, to the extent that such information is provided in the mitigation statement required by 33 CFR 325.1(d)(7), the proposed avoidance and minimization and the amount, type, and location of any proposed compensatory mitigation, including any out-of-kind compensation, or indicate an intention to use an approved mitigation bank or in-lieu fee program. The level of detail provided in the public notice must be commensurate with the scope and scale of the impacts. The notice shall not include information that the district engineer and the permittee believe should be kept confidential for business purposes, such as the exact location of a proposed mitigation site that has not yet been secured. The permittee must clearly identify any information being claimed as confidential in the mitigation statement when submitted. In such cases, the notice must still provide enough information to enable the public to provide meaningful comment on the proposed mitigation.

Citations to §325.1(d)(9)

  • (2) Within 15 days of receipt of an application the district engineer will either determine that the application is complete (see 33 CFR 325.1(d)(9) and issue a public notice as described in § 325.3 of this part, unless specifically exempted by other provisions of this regulation or that it is incomplete and notify the applicant of the information necessary for a complete application. The district engineer will issue a supplemental, revised, or corrected public notice if in his view there is a change in the application data that would affect the public's review of the proposal.

Citations to §325.1(e)

  • (1) The application must include a complete description of the proposed activity including necessary drawings, sketches, or plans sufficient for public notice (detailed engineering plans and specifications are not required); the location, purpose and need for the proposed activity; scheduling of the activity; the names and addresses of adjoining property owners; the location and dimensions of adjacent structures; and a list of authorizations required by other federal, interstate, state, or local agencies for the work, including all approvals received or denials already made. See § 325.3 for information required to be in public notices. District and division engineers are not authorized to develop additional information forms but may request specific information on a case-by-case basis. (See § 325.1(e)).