§157.09. Segregated ballast. — Inbound Citations
33 C.F.R. § 157.09
Statutory Authority
Cited by 11 regulations in release Current.
Citations to 33 C.F.R. § 157.09 as a whole
-
(1) Is constructed under a building contract awarded after June 1, 1979;(2) In the absence of a building contract, has the keel laid or is at a similar stage of construction after January 1, 1980;(3) Is delivered after June 1, 1982; or(i) The contract is awarded after June 1, 1979;(ii) In the absence of a contract, conversion is begun after January 1, 1980; or
-
(a) Each tank vessel that is engaged in the transfer of crude oil from an offshore oil exploitation or production facility on the Outer Continental Shelf of the United States on or after June 1, 1980 must, if segregated ballast tanks or dedicated clean ballast tanks are not required under § 157.09, § 157.10 or § 157.10a, have one of the following:(1) Segregated ballast tanks with a total capacity to meet the draft and trim requirements in paragraph (b) of this section.(2) Dedicated clean ballast tanks having a total capacity to meet the draft and trim requirements in paragraph (b) of this section and meeting the design and equipment requirements under subpart E of this part.
-
(1) Equipment that drains each cargo pump and oil piping line of oil residue;(2) Oil piping lines for the draining of oil residue from cargo pumps and other oil piping lines to a cargo tank or a slop tank; and(3) An oil piping line that meets paragraph (f) of this section and is connected to the cargo discharge piping on the outboard side of the manifold valves for the draining of oil residue from cargo pumps and other oil piping lines to a receptacle on the shore.
-
-
(c) Plans and calculations to substantiate compliance with the applicable segregated ballast and double hull requirements in § 157.09, § 157.10, § 157.10a, § 157.10b, or § 157.10d, or certification from the government of the vessel's flag state that the vessel complies with the segregated ballast and double hull requirements in:(2) For a vessel to which § 157.10d does not apply, Regulations 13 and 13E of the MARPOL 73/78.
-
The master of a tank vessel with segregated ballast tanks or dedicated clean ballast tanks under § 157.09, § 157.10, § 157.10a(a)(1), § 157.10a(b), § 157.10a(c), § 157.10b(a), § 157.10c(b)(1), or § 157.10c(c) shall ensure that ballast water is carried in a cargo tank only if—
Citations to §157.09(b)
-
(1) Segregated ballast tanks that have a total capacity to allow the vessel to meet the draft and trim requirements in § 157.09(b); or
-
(ii) Plans and calculations to substantiate compliance with the segregated ballast capacity requirements in § 157.09(b); or
Citations to §157.09(b)(1)
-
(2) The moulded draft amidships is at least 80 percent of that required under § 157.09(b)(1).
Citations to §157.09(b)(3)
-
(k) Sections 157.09(b)(3), 157.10(c)(3), 157.10a(d)(3), and 157.10b(b)(3) do not apply to tank barges.
Citations to §157.09(d)
-
(i) Section 157.09(d) does not apply to any:(1) U.S. vessel in domestic trade that is constructed under a contract awarded before January 8, 1976;(2) U.S. vessel in foreign trade that is constructed under a contract awarded before April 1, 1977; or